X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776100211002

Well Details

Well ID: 0776100211002
Loading map...
Location: 00/11-02-077-10W6/2
Location Alias: 00/11-02-77-10 W6M
Location Alias 2: 00/11-02-077-10 W6/02
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 10
Section: 02
County/Municipality: Saddle Hills County
Well Name: PENN WEST PCOUPES 11-2-77-10
Operator Name: Obsidian Energy Ltd.
License Number: 0184521
License Date: 1996-01-12
License Status: Abandoned
Spud Date: 1996-02-07
Final Drill Date: 1996-03-01
Well Total Depth: 2520.00 m
Surface Hole Latitude: 55.645662
Surface Hole Longitude: -119.436113

For data sources see[1][2]

Well History

Date Event
1996-01-12 Obtained License
1996-02-09 Surface Casing Operation Performed
1996-03-01 Finished Drilling
1996-03-01 Well Mode changed to Drilled and Cased
1996-03-02 Well Log Performed
1996-03-04 Production Casing Operation Performed
1996-03-05 Rig Released
1996-03-28 Perforation Treatment Performed - Jet Perforation
1996-03-28 Well Log Performed
1996-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-04-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-04-03 Plug Back Performed
1996-04-03 Well Log Performed
1997-01-15 Well Log Performed
1997-01-16 Perforation Treatment Performed - Jet Perforation
1997-01-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-01-18 Plug Back Performed
1997-01-18 Well Log Performed
1999-01-12 Perforation Treatment Performed - Jet Perforation
1999-01-16 Perforation Treatment Performed - Cement Squeeze
1999-01-16 Plug Back Performed
1999-01-16 Well Log Performed
1999-01-21 Well Log Performed
1999-01-22 Perforation Treatment Performed - Jet Perforation
1999-01-27 Perforation Treatment Performed - Fractured
1999-03-01 Well Began Production
1999-03-01 Well Fluid changed to Crude Oil
1999-03-01 Well Mode changed to Pumping
2009-04-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-04-07 Plug Back Performed
2009-04-07 Well Fluid changed to Crude Oil
2009-04-07 Well Log Performed
2009-04-07 Well Mode changed to Abandoned Zone
2009-04-09 Well Abandoned
2009-04-09 Well Fluid changed to Crude Oil
2009-04-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-03-28 Perforation 2272.50 2282.00 14
1999-01-22 Perforation 1918.00 1921.00 17
1999-01-27 Fracture 1918.00 1921.00 0
2009-04-07 Packing Device Capped w/Cement 1577.00 1585.00 0
2009-04-07 Packing Device Capped w/Cement 1887.00 1905.00 0
1996-03-30 Acid Treatment 2272.50 2282.00 0
1996-04-03 Packing Device Capped w/Cement 2257.00 2265.00 0
1997-01-16 Perforation 1591.50 1595.50 13
1997-01-16 Perforation 1599.00 1602.50 13
1997-01-18 Packing Device Capped w/Cement 1578.50 1586.50 0
1999-01-12 Perforation 1591.50 1595.50 13
1999-01-12 Perforation 1599.00 1602.50 13
1999-01-16 Cement Squeeze 1591.50 1602.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 1434 0.0 0.0 0.0
2000 1271 0.0 0.0 0.0
2009 2 0.0 0.0 0.0

For data sources see[5]

References