X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776092913000

Well Details

Well ID: 0776092913000
Loading map...
Location: 00/13-29-077-09W6/0
Location Alias: 00/13-29-77-09 W6M
Location Alias 2: 00/13-29-077-09 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 09
Section: 29
County/Municipality: Saddle Hills County
Well Name: LONGSHORE HZ PROGRESS 13-29-77-9
Operator Name: Longshore Resources Ltd.
License Number: 0490041
License Date: 2018-07-18
License Status: Issued
Spud Date: 2018-11-09
Final Drill Date: 2018-11-17
Well Total Depth: 3101.00 m
Surface Hole Latitude: 55.695333
Surface Hole Longitude: -119.367453

For data sources see[1][2]

Well History

Date Event
2018-07-18 Obtained License
2018-11-10 Surface Casing Operation Performed
2018-11-12 Direction Drilling Operation Performed - Deviate
2018-11-13 Direction Drilling Operation Performed - Horizontal
2018-11-13 Well Log Performed
2018-11-14 Intermediate Casing Operation Performed
2018-11-17 Finished Drilling
2018-11-17 Well Log Performed
2018-11-17 Well Mode changed to Drilled and Cased
2018-11-19 Liner Casing Operation Performed
2018-11-21 Rig Released
2018-11-27 Well Log Performed
2019-06-18 Well Log Performed
2019-06-19 Perforation Treatment Performed - Multi-Stage Fracture
2019-07-16 Well Began Production
2019-07-16 Well Fluid changed to Crude Oil
2019-07-16 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-11-09 Nabors Drilling Canada Limited C31 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-11-12 1542.00 Deviate (5 - 79 degrees)
2018-11-13 1960.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-06-19 Multi-Stage Fracture 3086.70 3086.80 0
2019-06-19 Multi-Stage Fracture 2578.30 2578.40 0
2019-06-19 Multi-Stage Fracture 2520.50 2520.60 0
2019-06-19 Multi-Stage Fracture 2461.80 2461.90 0
2019-06-19 Multi-Stage Fracture 2403.20 2403.30 0
2019-06-19 Multi-Stage Fracture 2345.10 2345.20 0
2019-06-19 Multi-Stage Fracture 2286.40 2286.50 0
2019-06-19 Multi-Stage Fracture 2227.90 2228.00 0
2019-06-19 Multi-Stage Fracture 2169.30 2169.40 0
2019-06-19 Multi-Stage Fracture 2110.40 2110.50 0
2019-06-19 Multi-Stage Fracture 2052.70 2052.80 0
2019-06-19 Multi-Stage Fracture 3045.40 3045.50 0
2019-06-19 Multi-Stage Fracture 2987.20 2987.30 0
2019-06-19 Multi-Stage Fracture 2928.50 2928.60 0
2019-06-19 Multi-Stage Fracture 2870.20 2870.30 0
2019-06-19 Multi-Stage Fracture 2811.70 2811.80 0
2019-06-19 Multi-Stage Fracture 2753.50 2753.60 0
2019-06-19 Multi-Stage Fracture 2694.90 2695.00 0
2019-06-19 Multi-Stage Fracture 2636.40 2636.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-06-19 2019-06-19 1,855 3,198 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 hydrochloric acid 7647-01-0 100 1.9528 N/A
water Not Available 100 49.0842 N/A
Prime Plus 30/50 Trican hexamethylenetetramine 100-97-0 100 1.9868 N/A
silica crystalline 14808-60-7 100 1.9868 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 5.2757 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.0847 N/A
WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0037 N/A
AI-11 Trican Corrosion Inhibitor non-hazardous ingredients Not Available 100 0.0072 N/A
potassium iodide 7681-11-0 100 0.0072 N/A
propargyl alcohol 107-19-7 100 0.0072 N/A
propargyl alcohol derivative 38172-91-7 100 0.0072 N/A
DF-2W Trican Defoamer non-hazardous ingredients Not Available 100 0.0001 N/A
propylene glycol 57-55-6 100 0.0001 N/A
Third Party Product (L) Engineered Chemistry Energizing Fluid undisclosed Trade Secret 100 0.1844 N/A
Third Party Product 2 (L) Engineered Chemistry Energizing Fluid undisclosed Trade Secret 100 0.0245 N/A
Third Party Product 3 (L) Engineered Chemistry Energizing Fluid undisclosed Trade Secret 100 0.0468 N/A
HVFR-4 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.2189 N/A
non-hazardous ingredients Not Available 100 0.2189 N/A
IC-8 Trican Iron Control 2-mercaptoethanol 60-24-2 100 0.0245 N/A
cupric chloride 7447-39-4 100 0.0245 N/A
monoethanolamine 141-43-5 100 0.0245 N/A
SI-10 Scale Inhibitor Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0021 N/A
ASA-60W Trican Surfactant alkylbenzenesulfonic acid 68584-22-5 100 0.0411 N/A
dipropylene glycol 25265-71-8 100 0.0411 N/A
sodium hexyldiphenyl ether sulfonate 147732-60-3 100 0.0411 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-06-18 2019-06-19 Surface Water - Runoff 3329

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 3679 0.0 0.0 0.0
2020 2108 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-11-21 No Incident Encountered 0.00 0.00
2019-06-19 No Incident Encountered 0.00 0.00

For data sources see[10]

References