X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776081908000

Well Details

Well ID: 0776081908000
Loading map...
Location: 00/08-19-077-08W6/0
Location Alias: 00/08-19-77-08 W6M
Location Alias 2: 00/08-19-077-08 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 08
Section: 19
County/Municipality: Saddle Hills County
Well Name: LONGSHORE PROGRESS 8-19-77-8
Operator Name: Longshore Resources Ltd.
License Number: 0172914
License Date: 1994-11-23
License Status: Issued
Spud Date: 1994-12-03
Final Drill Date: 1994-12-16
Well Total Depth: 1902.00 m
Surface Hole Latitude: 55.685591
Surface Hole Longitude: -119.221349

For data sources see[1][2]

Well History

Date Event
1994-11-23 Obtained License
1994-12-03 Lost Circulation Occurred
1994-12-04 Surface Casing Operation Performed
1994-12-07 Drill Stem Test Performed
1994-12-07 Well Log Performed
1994-12-16 Finished Drilling
1994-12-16 Well Log Performed
1994-12-20 Well Log Performed
1994-12-21 Production Casing Operation Performed
1994-12-22 Rig Released
1995-02-16 Well Log Performed
1995-02-17 Perforation Treatment Performed - Jet Perforation
1995-02-17 Well Log Performed
1995-02-22 Perforation Treatment Performed - Jet Perforation
1995-02-22 Well Log Performed
1995-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-03-27 Well Mode changed to Drilled and Cased
1999-08-30 Perforation Treatment Performed - Cement Squeeze
1999-08-30 Plug Back Performed
1999-09-16 Well Began Production
1999-09-16 Well Fluid changed to Gas
1999-09-16 Well Mode changed to Flowing
2000-08-15 Well Fluid changed to Gas
2000-08-15 Well Mode changed to Suspended
2003-08-01 Well Fluid changed to Crude Oil
2003-08-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-02-17 Perforation 676.50 678.00 14
1995-02-22 Perforation 681.00 683.00 14
1995-02-22 Perforation 1864.50 1867.00 14
1995-03-02 Acid Treatment 1864.50 1867.00 0
1999-08-30 Cement Squeeze 676.50 679.00 0
1999-08-30 Cement Squeeze 681.00 683.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 178 0.0 0.0 0.0
2003 3502 0.0 0.0 0.0
2004 8219 0.0 0.0 0.0
2005 8433 0.0 0.0 0.0
2006 7938 0.0 0.0 0.0
2007 8371 0.0 0.0 0.0
2008 8724 0.0 0.0 0.0
2009 8425 0.0 0.0 0.0
2010 8666 0.0 0.0 0.0
2011 8732 0.0 0.0 0.0
2012 8168 0.0 0.0 0.0
2013 8528 0.0 0.0 0.0
2014 8186 0.0 0.0 0.0
2015 7763 0.0 0.0 0.0
2016 8110 0.0 0.0 0.0
2017 7662 0.0 0.0 0.0
2018 7802 0.0 0.0 0.0
2019 8102 0.0 0.0 0.0
2020 2166 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1994-12-03 Lost Circulation 33.00 200.00

For data sources see[6]

References