X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776081313020

Well Details

Well ID: 0776081313020
Loading map...
Location: 02/13-13-077-08W6/0
Location Alias: 02/13-13-77-08 W6M
Location Alias 2: 02/13-13-077-08 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 08
Section: 13
County/Municipality: Saddle Hills County
Well Name: TOURMALINE HZ VALHALLA 13-13-77-8
Operator Name: Tourmaline Oil Corp.
License Number: 0479769
License Date: 2016-06-27
License Status: Amended
Spud Date: 2016-07-12
Final Drill Date: 2016-07-29
Well Total Depth: 3917.00 m
Surface Hole Latitude: 55.668176
Surface Hole Longitude: -119.082752

For data sources see[1][2]

Well History

Date Event
2016-06-27 Obtained License
2016-07-14 Surface Casing Operation Performed
2016-07-16 Direction Drilling Operation Performed - Deviate
2016-07-19 Direction Drilling Operation Performed - Horizontal
2016-07-22 Intermediate Casing Operation Performed
2016-07-29 Finished Drilling
2016-07-29 Well Log Performed
2016-07-29 Well Mode changed to Drilled and Cased
2016-07-30 Well Log Performed
2016-07-31 Liner Casing Operation Performed
2016-07-31 Rig Released
2016-09-10 Well Log Performed
2016-09-15 Perforation Treatment Performed - Multi-Stage Fracture
2016-09-16 Perforation Treatment Performed - Multi-Stage Fracture
2016-09-17 Perforation Treatment Performed - Multi-Stage Fracture
2016-09-27 Well Began Production
2016-09-27 Well Fluid changed to Crude Oil
2016-09-27 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2016-07-16 1610.90 Deviate (5 - 79 degrees)
2016-07-19 2218.80 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-09-15 Multi-Stage Fracture 3886.20 3886.30 0
2016-09-15 Multi-Stage Fracture 3464.10 3464.20 0
2016-09-15 Multi-Stage Fracture 3418.60 3418.70 0
2016-09-15 Multi-Stage Fracture 3373.60 3373.70 0
2016-09-16 Multi-Stage Fracture 3328.80 3328.90 0
2016-09-16 Multi-Stage Fracture 3283.50 3283.60 0
2016-09-16 Multi-Stage Fracture 3238.20 3238.30 0
2016-09-16 Multi-Stage Fracture 3178.50 3178.60 0
2016-09-16 Multi-Stage Fracture 3119.80 3119.90 0
2016-09-16 Multi-Stage Fracture 3060.60 3060.70 0
2016-09-16 Multi-Stage Fracture 3001.20 3001.30 0
2016-09-15 Multi-Stage Fracture 3825.40 3825.50 0
2016-09-16 Multi-Stage Fracture 2942.40 2942.50 0
2016-09-16 Multi-Stage Fracture 2882.70 2882.80 0
2016-09-16 Multi-Stage Fracture 2822.90 2823.00 0
2016-09-16 Multi-Stage Fracture 2764.80 2764.90 0
2016-09-16 Multi-Stage Fracture 2706.90 2707.00 0
2016-09-16 Multi-Stage Fracture 2648.00 2648.10 0
2016-09-16 Multi-Stage Fracture 2589.20 2589.30 0
2016-09-16 Multi-Stage Fracture 2530.20 2530.30 0
2016-09-16 Multi-Stage Fracture 2472.10 2472.20 0
2016-09-17 Multi-Stage Fracture 2413.80 2413.90 0
2016-09-15 Multi-Stage Fracture 3780.20 3780.30 0
2016-09-17 Multi-Stage Fracture 2354.70 2354.80 0
2016-09-15 Multi-Stage Fracture 3735.20 3735.30 0
2016-09-15 Multi-Stage Fracture 3690.20 3690.30 0
2016-09-15 Multi-Stage Fracture 3645.20 3645.30 0
2016-09-15 Multi-Stage Fracture 3600.00 3600.10 0
2016-09-15 Multi-Stage Fracture 3554.60 3554.70 0
2016-09-15 Multi-Stage Fracture 3509.30 3509.40 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-09-15 2016-09-17 2,057 8,998 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 87.3052 N/A
Prime Plus (30/50) Canyon Technical Services No specific ingredients Not Available 100 1.3749 N/A
Sand (30/50) Ottawa Canyon Technical Services Aluminum Oxide 1344-28-1 100 8.1032 N/A
Crystalline silica. quartz 14808-60-7 100 8.1032 N/A
Iron Oxide 1309-37-1 100 8.1032 N/A
Titanium Oxide 13463-67-7 100 8.1032 N/A
Sand (40/70) Ottawa Canyon Technical Services Aluminum Oxide 1344-28-1 100 3.9395 N/A
Crystalline silica. quartz 14808-60-7 100 3.9395 N/A
Iron Oxide 1309-37-1 100 3.9395 N/A
Titanium Oxide 13463-67-7 100 3.9395 N/A
CAN-1912 Clay Stabilizer (HT) Canyon Technical Services Clay Control No hazardous ingredients Not Available 100 0.0964 N/A
CAN-2412 Non-emulsifier Canyon Technical Services Demulsifier 1-Hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0845 N/A
Benzenesulfonic acid. dodecyl-.
compd. with 2-aminoethanol (1:1)
26836-07-7 100 0.0845 N/A
Methanol 67-56-1 100 0.0844 N/A
Poly(oxyethelyne. oxypropylene) copolymer. liquids 11/6/9003 100 0.0844 N/A
Water 7732-18-5 100 0.0844 N/A
CAN-2057 Friction Reducer Canyon Technical Services Gelling Agent No hazardous ingredients Not Available 100 0.0545 N/A
CAN-1402 Scale Inhibitor Canyon Technical Services Scale Inhibitor Methyl Alcohol 67-56-1 100 0.0351 N/A
Potassium Chloride 7447-40-7 100 0.0351 N/A
Water 7732-18-5 100 0.0351 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-09-12 2016-09-13 Surface Water - Runoff 1430
2016-09-13 2016-09-14 Surface Water - Runoff 2940
2016-09-15 2016-09-16 Surface Water - Runoff 4628

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 2044 0.0 0.0 0.0
2017 8000 0.0 0.0 0.0
2018 7829 0.0 0.0 0.0
2019 7853 0.0 0.0 0.0
2020 1828 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-07-29 No Incident Encountered 0.00 0.00
2016-10-17 No Incident Encountered 0.00 0.00

For data sources see[9]

References