If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776081303000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.668087,"lon":-119.071996,"icon":""}]} |
Location: 00/03-13-077-08W6/0 | |
Location Alias: 00/03-13-77-08 W6M | |
Location Alias 2: 00/03-13-077-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 08 | |
Section: 13 | |
County/Municipality: Saddle Hills County | |
Well Name: TOURMALINE HZ VALHALLA 3-13-77-8 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0476151 | |
License Date: 2015-07-17 | |
License Status: Issued | |
Spud Date: 2015-09-20 | |
Final Drill Date: 2015-10-06 | |
Well Total Depth: 3685.00 m | |
Surface Hole Latitude: 55.668087 | |
Surface Hole Longitude: -119.071996 |
Date | Event |
---|---|
2015-07-17 | Obtained License |
2015-09-21 | Surface Casing Operation Performed |
2015-09-24 | Direction Drilling Operation Performed - Deviate |
2015-09-26 | Direction Drilling Operation Performed - Horizontal |
2015-09-27 | Well Log Performed |
2015-09-28 | Intermediate Casing Operation Performed |
2015-09-29 | Well Log Performed |
2015-10-06 | Finished Drilling |
2015-10-06 | Well Log Performed |
2015-10-06 | Well Mode changed to Drilled and Cased |
2015-10-07 | Production Casing Operation Performed |
2015-10-08 | Rig Released |
2015-12-01 | Well Log Performed |
2015-12-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2015-12-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-12-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-12-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-12-17 | Well Began Production |
2015-12-17 | Well Fluid changed to Crude Oil |
2015-12-17 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-09-20 | Precision Drilling Corporation | 226 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-09-24 | 1493.80 | Deviate (5 - 79 degrees) |
2015-09-26 | 1981.20 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-12-03 | Multi-Stage Fracture | 3670.00 | 3670.10 | 0 |
2015-12-09 | Multi-Stage Fracture | 3145.40 | 3145.50 | 0 |
2015-12-09 | Multi-Stage Fracture | 3086.90 | 3087.00 | 0 |
2015-12-09 | Multi-Stage Fracture | 3014.30 | 3014.40 | 0 |
2015-12-09 | Multi-Stage Fracture | 2955.40 | 2955.50 | 0 |
2015-12-09 | Multi-Stage Fracture | 2882.70 | 2882.80 | 0 |
2015-12-10 | Multi-Stage Fracture | 2824.80 | 2824.90 | 0 |
2015-12-10 | Multi-Stage Fracture | 2766.40 | 2766.50 | 0 |
2015-12-10 | Multi-Stage Fracture | 2693.50 | 2693.60 | 0 |
2015-12-10 | Multi-Stage Fracture | 2634.70 | 2634.80 | 0 |
2015-12-10 | Multi-Stage Fracture | 2561.40 | 2561.50 | 0 |
2015-12-03 | Acid Treatment | 3670.00 | 3670.10 | 0 |
2015-12-10 | Multi-Stage Fracture | 2502.90 | 2503.00 | 0 |
2015-12-10 | Multi-Stage Fracture | 2430.00 | 2430.10 | 0 |
2015-12-10 | Multi-Stage Fracture | 2372.30 | 2372.40 | 0 |
2015-12-10 | Multi-Stage Fracture | 2299.20 | 2299.30 | 0 |
2015-12-10 | Multi-Stage Fracture | 2240.60 | 2240.70 | 0 |
2015-12-10 | Multi-Stage Fracture | 2168.80 | 2168.90 | 0 |
2015-12-10 | Multi-Stage Fracture | 2110.20 | 2110.30 | 0 |
2015-12-10 | Multi-Stage Fracture | 2051.70 | 2051.80 | 0 |
2015-12-09 | Multi-Stage Fracture | 3611.30 | 3611.40 | 0 |
2015-12-09 | Multi-Stage Fracture | 3538.60 | 3538.70 | 0 |
2015-12-09 | Multi-Stage Fracture | 3480.30 | 3480.40 | 0 |
2015-12-09 | Multi-Stage Fracture | 3407.50 | 3407.60 | 0 |
2015-12-09 | Multi-Stage Fracture | 3348.70 | 3348.80 | 0 |
2015-12-09 | Multi-Stage Fracture | 3275.50 | 3275.60 | 0 |
2015-12-09 | Multi-Stage Fracture | 3217.90 | 3218.00 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-12-03 | 2015-12-10 | 1,815 | 4,592 | N/A |
2 | 2015-12-09 | 2015-12-10 | 1,815 | 0 | N/A |
3 | 2015-12-10 | 2015-12-10 | 1,815 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 94.8455 | N/A | |||
Tolcide PS75LT | Canyon Technical Services | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0148 | N/A | |
Water | 7732-18-5 | 100 | 0.0148 | N/A | ||||
CAN-1912 Clay Stabilizer (HT) | Canyon Technical Services | Clay Control | No hazardous ingredients | Not Available | 100 | 0.1036 | N/A | |
CAN-2410 Demulsifier | Canyon Technical Services | Demulsifier | Methyl Alcohol | 67-56-1 | 100 | 0.0881 | N/A | |
Water | 7732-18-5 | 100 | 0.0881 | N/A | ||||
CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0517 | N/A | |
CAN-1402 Scale Inhibitor | Canyon Technical Services | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 100 | 0.038 | N/A | |
Potassium Chloride | 7447-40-7 | 100 | 0.038 | N/A | ||||
Water | 7732-18-5 | 100 | 0.038 | N/A | ||||
2 | Prime Plus (30/50) | Canyon Technical Services | No specific ingredients | Not Available | 100 | 1.4161 | N/A | |
Sand (30/50) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 4.293 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 4.293 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 4.293 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 4.293 | N/A | ||||
AcResin Activator W | Canyon Technical Services | Activator | Alcohols. C12-14 Secondary. Ethoxylated | 84133-50-6 | 100 | 0.0905 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0905 | N/A | ||||
Polyethylene Glycol | 25322-68-3 | 100 | 0.0905 | N/A | ||||
3 | Prime Plus (40/70) | Canyon Technical Services | No specific ingredients | Not Available | 100 | 1.2142 | N/A | |
Sand (40/70) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 3.1156 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 3.1156 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 3.1156 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 3.1155 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2015-12-05 | 2016-01-05 | Municipal Water | 160 |
2015-12-05 | 2015-12-06 | Surface Water - Runoff | 1695 |
2015-12-07 | 2015-12-10 | Surface Water - Runoff | 2738 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 139 | 0.0 | 0.0 | 0.0 |
2016 | 8202 | 0.0 | 0.0 | 0.0 |
2017 | 8293 | 0.0 | 0.0 | 0.0 |
2018 | 7893 | 0.0 | 0.0 | 0.0 |
2019 | 8579 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-10-08 | No Incident Encountered | 0.00 | 0.00 |
2015-12-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]