If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776073413020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.707948,"lon":-118.97813,"icon":""}]} |
Location: 02/13-34-077-07W6/0 | |
Location Alias: 02/13-34-77-07 W6M | |
Location Alias 2: 02/13-34-077-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 07 | |
Section: 34 | |
County/Municipality: Saddle Hills County | |
Well Name: TOURMALINE 102 VALHALLA 13-34-77-7 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0474339 | |
License Date: 2015-01-21 | |
License Status: Issued | |
Spud Date: 2015-02-01 | |
Final Drill Date: 2015-02-15 | |
Well Total Depth: 3563.00 m | |
Surface Hole Latitude: 55.707948 | |
Surface Hole Longitude: -118.978130 |
Date | Event |
---|---|
2015-01-21 | Obtained License |
2015-02-01 | Surface Casing Operation Performed |
2015-02-05 | Direction Drilling Operation Performed - Deviate |
2015-02-07 | Direction Drilling Operation Performed - Horizontal |
2015-02-07 | Well Log Performed |
2015-02-08 | Well Log Performed |
2015-02-09 | Intermediate Casing Operation Performed |
2015-02-15 | Finished Drilling |
2015-02-15 | Well Log Performed |
2015-02-15 | Well Mode changed to Drilled and Cased |
2015-02-16 | Liner Casing Operation Performed |
2015-02-17 | Rig Released |
2015-03-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2015-03-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-03-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-03-23 | Well Began Production |
2015-03-23 | Well Fluid changed to Crude Oil |
2015-03-23 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-02-01 | Ironhand Drilling Inc. | 3 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-02-05 | 1196.10 | Deviate (5 - 79 degrees) |
2015-02-07 | 1709.20 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-03-16 | Multi-Stage Fracture | 3535.20 | 3535.30 | 0 |
2015-03-16 | Multi-Stage Fracture | 3032.60 | 3032.70 | 0 |
2015-03-16 | Multi-Stage Fracture | 2959.10 | 2959.20 | 0 |
2015-03-16 | Multi-Stage Fracture | 2886.60 | 2886.70 | 0 |
2015-03-16 | Multi-Stage Fracture | 2813.50 | 2813.60 | 0 |
2015-03-16 | Multi-Stage Fracture | 2739.60 | 2739.70 | 0 |
2015-03-17 | Multi-Stage Fracture | 2666.90 | 2667.00 | 0 |
2015-03-17 | Multi-Stage Fracture | 2594.50 | 2594.60 | 0 |
2015-03-17 | Multi-Stage Fracture | 2523.90 | 2524.00 | 0 |
2015-03-17 | Multi-Stage Fracture | 2450.10 | 2450.20 | 0 |
2015-03-17 | Multi-Stage Fracture | 2376.70 | 2376.80 | 0 |
2015-03-16 | Acid Treatment | 3535.20 | 3535.30 | 0 |
2015-03-17 | Multi-Stage Fracture | 2303.50 | 2303.60 | 0 |
2015-03-17 | Multi-Stage Fracture | 2231.20 | 2231.30 | 0 |
2015-03-17 | Multi-Stage Fracture | 2157.80 | 2157.90 | 0 |
2015-03-17 | Multi-Stage Fracture | 2084.10 | 2084.20 | 0 |
2015-03-17 | Multi-Stage Fracture | 2011.00 | 2011.10 | 0 |
2015-03-17 | Multi-Stage Fracture | 1937.10 | 1937.20 | 0 |
2015-03-17 | Multi-Stage Fracture | 1863.90 | 1864.00 | 0 |
2015-03-17 | Multi-Stage Fracture | 1790.40 | 1790.50 | 0 |
2015-03-16 | Multi-Stage Fracture | 3457.60 | 3457.70 | 0 |
2015-03-16 | Multi-Stage Fracture | 3398.00 | 3398.10 | 0 |
2015-03-16 | Multi-Stage Fracture | 3338.30 | 3338.40 | 0 |
2015-03-16 | Multi-Stage Fracture | 3279.60 | 3279.70 | 0 |
2015-03-16 | Multi-Stage Fracture | 3221.90 | 3222.00 | 0 |
2015-03-16 | Multi-Stage Fracture | 3163.40 | 3163.50 | 0 |
2015-03-16 | Multi-Stage Fracture | 3104.40 | 3104.50 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-03-16 | 2015-03-17 | 1,510 | 3,740 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 87.4394 | N/A | |||
Sand (20/40) Ottawa | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 5.4845 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 5.4845 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 5.4845 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 5.4844 | N/A | ||||
Sand (50/140) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 1.2187 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 1.2187 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 1.2187 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 1.2188 | N/A | ||||
SiberProp (20/40) | Canyon | Crystalline silica. quartz | 14808-60-7 | 100 | 5.601 | N/A | ||
Phenol formaldehyde resin | 9003-35-4 | 100 | 5.601 | N/A | ||||
Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0255 | N/A | |
Water | 7732-18-5 | 100 | 0.0255 | N/A | ||||
CAN-1911 Clay Stabilizer | Canyon | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.0964 | N/A | |
Water | 7732-18-5 | 100 | 0.0964 | N/A | ||||
CAN-2057 Friction Reducer | Canyon | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0476 | N/A | |
CAN-2403 nanoFLO | Canyon | Surfactant | Ethanol | 64-17-5 | 100 | 0.0866 | N/A | |
Methanol | 67-56-1 | 100 | 0.0866 | N/A | ||||
Terpenes and Terpenoids. sweet orange-oil | 68647-72-3 | 100 | 0.0866 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0866 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2015-03-14 | 2015-03-14 | Surface Water - Runoff | 3740 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 6304 | 0.0 | 0.0 | 0.0 |
2016 | 8771 | 0.0 | 0.0 | 0.0 |
2017 | 8323 | 0.0 | 0.0 | 0.0 |
2018 | 8731 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-02-15 | No Incident Encountered | 0.00 | 0.00 |
2015-03-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]