If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776073313000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.715228,"lon":-119.022661,"icon":""}]} |
Location: 00/13-33-077-07W6/0 | |
Location Alias: 00/13-33-77-07 W6M | |
Location Alias 2: 00/13-33-077-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 07 | |
Section: 33 | |
County/Municipality: Saddle Hills County | |
Well Name: TOURMALINE HZ VALHALLA 13-33-77-7 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0429718 | |
License Date: 2011-01-10 | |
License Status: Suspension | |
Spud Date: 2011-02-19 | |
Final Drill Date: 2011-03-02 | |
Well Total Depth: 2547.00 m | |
Surface Hole Latitude: 55.715228 | |
Surface Hole Longitude: -119.022661 |
Date | Event |
---|---|
2011-01-10 | Obtained License |
2011-02-20 | Surface Casing Operation Performed |
2011-02-22 | Direction Drilling Operation Performed - Horizontal |
2011-03-01 | Well Log Performed |
2011-03-02 | Finished Drilling |
2011-03-02 | Well Log Performed |
2011-03-02 | Well Mode changed to Drilled and Cased |
2011-03-03 | Production Casing Operation Performed |
2011-03-04 | Rig Released |
2011-03-28 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2011-03-28 | Perforation Treatment Performed - Fractured |
2011-03-28 | Perforation Treatment Performed - Jet Perforation |
2011-03-29 | Perforation Treatment Performed - Fractured |
2011-03-29 | Perforation Treatment Performed - Jet Perforation |
2011-03-30 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2011-03-30 | Perforation Treatment Performed - Fractured |
2011-03-30 | Perforation Treatment Performed - Jet Perforation |
2011-03-31 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2011-03-31 | Perforation Treatment Performed - Fractured |
2011-04-01 | Well Began Production |
2011-04-01 | Well Fluid changed to Crude Oil |
2011-04-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-02-22 | 1280.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-03-28 | Hydra Jet Perforation | 2525.00 | 2525.30 | 4 |
2011-03-29 | Fracture | 2227.60 | 2227.70 | 0 |
2011-03-29 | Perforation | 2166.20 | 2166.30 | 4 |
2011-03-29 | Fracture | 2166.20 | 2166.30 | 0 |
2011-03-29 | Perforation | 2106.80 | 2106.90 | 4 |
2011-03-29 | Fracture | 2106.80 | 2106.90 | 0 |
2011-03-30 | Hydra Jet Perforation | 2095.00 | 2095.30 | 4 |
2011-03-30 | Fracture | 2095.00 | 2095.30 | 0 |
2011-03-30 | Perforation | 2046.60 | 2046.70 | 4 |
2011-03-30 | Fracture | 2046.60 | 2046.70 | 0 |
2011-03-30 | Perforation | 1985.90 | 1986.00 | 4 |
2011-03-28 | Fracture | 2525.00 | 2525.30 | 0 |
2011-03-30 | Fracture | 1985.90 | 1986.00 | 0 |
2011-03-30 | Perforation | 1925.00 | 1925.10 | 4 |
2011-03-30 | Fracture | 1925.00 | 1925.10 | 0 |
2011-03-30 | Hydra Jet Perforation | 1905.00 | 1905.30 | 4 |
2011-03-30 | Fracture | 1905.00 | 1905.30 | 0 |
2011-03-31 | Hydra Jet Perforation | 1835.00 | 1835.30 | 4 |
2011-03-31 | Fracture | 1835.00 | 1835.30 | 0 |
2011-03-31 | Hydra Jet Perforation | 1765.00 | 1765.30 | 4 |
2011-03-31 | Fracture | 1765.00 | 1765.30 | 0 |
2011-03-31 | Hydra Jet Perforation | 1705.00 | 1705.30 | 4 |
2011-03-28 | Perforation | 2472.00 | 2472.10 | 4 |
2011-03-31 | Fracture | 1705.00 | 1705.30 | 0 |
2011-03-31 | Hydra Jet Perforation | 1638.00 | 1638.30 | 4 |
2011-03-31 | Fracture | 1638.00 | 1638.30 | 0 |
2011-03-28 | Fracture | 2472.00 | 2472.10 | 0 |
2011-03-28 | Perforation | 2411.00 | 2411.10 | 4 |
2011-03-28 | Fracture | 2411.00 | 2411.10 | 0 |
2011-03-29 | Perforation | 2288.90 | 2289.00 | 4 |
2011-03-29 | Fracture | 2288.90 | 2289.00 | 0 |
2011-03-29 | Perforation | 2227.60 | 2227.70 | 4 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 4950 | 0.0 | 0.0 | 0.0 |
2012 | 8279 | 0.0 | 0.0 | 0.0 |
2013 | 7884 | 0.0 | 0.0 | 0.0 |
2014 | 8256 | 0.0 | 0.0 | 0.0 |
2015 | 8624 | 0.0 | 0.0 | 0.0 |
2016 | 8768 | 0.0 | 0.0 | 0.0 |
2017 | 1387 | 0.0 | 0.0 | 0.0 |
2018 | 228 | 0.0 | 0.0 | 0.0 |
2019 | 7176 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]