If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0776073301020 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 02/01-33-077-07W6/0 | |
| Location Alias: 02/01-33-77-07 W6M | |
| Location Alias 2: 02/01-33-077-07 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 077 | |
| Meridian: 6 | |
| Range: 07 | |
| Section: 33 | |
| County/Municipality: Saddle Hills County | |
| Well Name: TOURMALINE 102 HZ VALHALLA 1-33-77-7 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0429721 | |
| License Date: 2011-01-10 | |
| License Status: Issued | |
| Spud Date: 2011-06-11 | |
| Final Drill Date: 2011-06-24 | |
| Well Total Depth: 2510.00 m | |
| Surface Hole Latitude: 55.715048 | |
| Surface Hole Longitude: -119.022661 |
| Date | Event |
|---|---|
| 2011-01-10 | Obtained License |
| 2011-06-13 | Surface Casing Operation Performed |
| 2011-06-16 | Direction Drilling Operation Performed - Horizontal |
| 2011-06-24 | Finished Drilling |
| 2011-06-24 | Well Mode changed to Drilled and Cased |
| 2011-06-26 | Production Casing Operation Performed |
| 2011-06-28 | Rig Released |
| 2011-07-27 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-07-28 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-07-29 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-07-30 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-07-31 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-08-05 | Well Began Production |
| 2011-08-05 | Well Fluid changed to Crude Oil |
| 2011-08-05 | Well Mode changed to Pumping |
| 2016-01-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-06-16 | 1268.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-07-27 | Multi-Stage Fracture | 2486.00 | 2486.10 | 0 |
| 2011-07-29 | Multi-Stage Fracture | 2041.00 | 2041.10 | 0 |
| 2011-07-29 | Multi-Stage Fracture | 1988.00 | 1988.10 | 0 |
| 2011-07-30 | Multi-Stage Fracture | 1938.00 | 1938.10 | 0 |
| 2011-07-30 | Multi-Stage Fracture | 1888.00 | 1888.10 | 0 |
| 2011-07-30 | Multi-Stage Fracture | 1838.00 | 1838.10 | 0 |
| 2011-07-30 | Multi-Stage Fracture | 1792.00 | 1792.10 | 0 |
| 2011-07-31 | Multi-Stage Fracture | 1738.00 | 1738.10 | 0 |
| 2011-07-31 | Multi-Stage Fracture | 1688.00 | 1688.10 | 0 |
| 2011-07-31 | Multi-Stage Fracture | 1638.00 | 1638.10 | 0 |
| 2016-01-19 | Acid Treatment | 1638.00 | 2487.00 | 0 |
| 2011-07-27 | Multi-Stage Fracture | 2438.00 | 2438.10 | 0 |
| 2011-07-27 | Multi-Stage Fracture | 2389.00 | 2389.10 | 0 |
| 2011-07-28 | Multi-Stage Fracture | 2334.00 | 2334.10 | 0 |
| 2011-07-28 | Multi-Stage Fracture | 2288.00 | 2288.10 | 0 |
| 2011-07-28 | Multi-Stage Fracture | 2238.00 | 2238.10 | 0 |
| 2011-07-28 | Multi-Stage Fracture | 2188.00 | 2188.10 | 0 |
| 2011-07-28 | Multi-Stage Fracture | 2138.00 | 2138.10 | 0 |
| 2011-07-29 | Multi-Stage Fracture | 2088.00 | 2088.10 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 3300 | 0.0 | 0.0 | 0.0 |
| 2012 | 7262 | 0.0 | 0.0 | 0.0 |
| 2013 | 7917 | 0.0 | 0.0 | 0.0 |
| 2014 | 8268 | 0.0 | 0.0 | 0.0 |
| 2015 | 7334 | 0.0 | 0.0 | 0.0 |
| 2016 | 8241 | 0.0 | 0.0 | 0.0 |
| 2017 | 8274 | 0.0 | 0.0 | 0.0 |
| 2018 | 8731 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2016-01-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]