X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776073102000

Well Details

Well ID: 0776073102000
Loading map...
Location: 00/02-31-077-07W6/0
Location Alias: 00/02-31-77-07 W6M
Location Alias 2: 00/02-31-077-07 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 07
Section: 31
County/Municipality: Saddle Hills County
Well Name: TOURMALINE HZ VALHALLA 2-31-77-7
Operator Name: Tourmaline Oil Corp.
License Number: 0469014
License Date: 2014-08-12
License Status: Issued
Spud Date: 2014-09-03
Final Drill Date: 2014-09-17
Well Total Depth: 3505.00 m
Surface Hole Latitude: 55.696892
Surface Hole Longitude: -119.053550

For data sources see[1][2]

Well History

Date Event
2014-08-12 Obtained License
2014-09-04 Surface Casing Operation Performed
2014-09-06 Direction Drilling Operation Performed - Deviate
2014-09-08 Direction Drilling Operation Performed - Horizontal
2014-09-09 Well Log Performed
2014-09-10 Intermediate Casing Operation Performed
2014-09-17 Finished Drilling
2014-09-17 Well Log Performed
2014-09-17 Well Mode changed to Drilled and Cased
2014-09-18 Liner Casing Operation Performed
2014-09-19 Rig Released
2014-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-10-14 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-15 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-16 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-24 Well Began Production
2014-11-24 Well Fluid changed to Crude Oil
2014-11-24 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-09-03 Ironhand Drilling Inc. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-09-06 1233.50 Deviate (5 - 79 degrees)
2014-09-08 1775.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-10-14 Multi-Stage Fracture 3477.50 3477.60 0
2014-10-15 Multi-Stage Fracture 2969.60 2969.70 0
2014-10-15 Multi-Stage Fracture 2899.10 2899.20 0
2014-10-15 Multi-Stage Fracture 2842.60 2842.70 0
2014-10-16 Multi-Stage Fracture 2773.20 2773.30 0
2014-10-16 Multi-Stage Fracture 2716.30 2716.40 0
2014-10-16 Multi-Stage Fracture 2645.40 2645.50 0
2014-10-16 Multi-Stage Fracture 2588.00 2588.10 0
2014-10-16 Multi-Stage Fracture 2517.40 2517.50 0
2014-10-16 Multi-Stage Fracture 2461.00 2461.10 0
2014-10-16 Multi-Stage Fracture 2392.10 2392.20 0
2014-10-14 Acid Treatment 3477.50 3477.60 0
2014-10-16 Multi-Stage Fracture 2334.50 2334.60 0
2014-10-16 Multi-Stage Fracture 2264.70 2264.80 0
2014-10-16 Multi-Stage Fracture 2208.40 2208.50 0
2014-10-16 Multi-Stage Fracture 2139.80 2139.90 0
2014-10-16 Multi-Stage Fracture 2082.30 2082.40 0
2014-10-16 Multi-Stage Fracture 2011.90 2012.00 0
2014-10-16 Multi-Stage Fracture 1957.70 1957.80 0
2014-10-16 Multi-Stage Fracture 1890.60 1890.70 0
2014-10-15 Multi-Stage Fracture 3401.80 3401.90 0
2014-10-15 Multi-Stage Fracture 3346.00 3346.10 0
2014-10-15 Multi-Stage Fracture 3277.00 3277.10 0
2014-10-15 Multi-Stage Fracture 3220.90 3321.00 0
2014-10-15 Multi-Stage Fracture 3151.90 3152.00 0
2014-10-15 Multi-Stage Fracture 3096.40 3096.50 0
2014-10-15 Multi-Stage Fracture 3026.50 3026.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-10-14 2014-10-16 1,562 4,900 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 87.5367 N/A
Sand (20/40) Ottawa Canyon Aluminum Oxide 1344-28-1 100 5.3208 N/A
Crystalline silica. quartz 14808-60-7 100 5.3208 N/A
Iron Oxide 1309-37-1 100 5.3208 N/A
Titanium Oxide 13463-67-7 100 5.321 N/A
Sand (50/140) Canyon Aluminum Oxide 1344-28-1 100 4.6018 N/A
Crystalline silica. quartz 14808-60-7 100 4.6018 N/A
Iron Oxide 1309-37-1 100 4.6018 N/A
Titanium Oxide 13463-67-7 100 4.6018 N/A
SiberProp (20/40) Canyon Crystalline silica. quartz 14808-60-7 100 2.2965 N/A
Phenol formaldehyde resin 9003-35-4 100 2.2965 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0136 N/A
Water 7732-18-5 100 0.0136 N/A
CAN-1911 Clay Stabilizer Canyon Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.0967 N/A
Water 7732-18-5 100 0.0967 N/A
CAN-2057 Friction Reducer Canyon Gelling Agent No hazardous ingredients Not Available 100 0.0466 N/A
CAN-2403 nanoFLO Canyon Surfactant Ethanol 64-17-5 100 0.0869 N/A
Methanol 67-56-1 100 0.0869 N/A
Terpenes and Terpenoids. sweet orange-oil 68647-72-3 100 0.0869 N/A
Water 7732-18-5 100 0.0869 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-10-14 2014-10-17 Surface Water - Runoff 4900

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 825 0.0 0.0 0.0
2015 7096 0.0 0.0 0.0
2016 8386 0.0 0.0 0.0
2017 8319 0.0 0.0 0.0
2018 3346 0.0 0.0 0.0
2019 8736 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-09-17 No Incident Encountered 0.00 0.00
2014-11-07 No Incident Encountered 0.00 0.00

For data sources see[10]

References