If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0776072911000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.694852,"lon":-119.033379,"icon":""}]} |
Location: 00/11-29-077-07W6/0 | |
Location Alias: 00/11-29-77-07 W6M | |
Location Alias 2: 00/11-29-077-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 6 | |
Range: 07 | |
Section: 29 | |
County/Municipality: Saddle Hills County | |
Well Name: TOURMALINE HZ VALHALLA 11-29-77-7 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0443210 | |
License Date: 2012-01-23 | |
License Status: Suspension | |
Spud Date: 2012-02-24 | |
Final Drill Date: 2012-03-08 | |
Well Total Depth: 3010.00 m | |
Surface Hole Latitude: 55.694852 | |
Surface Hole Longitude: -119.033379 |
Date | Event |
---|---|
2012-01-23 | Obtained License |
2012-02-26 | Well Log Performed |
2012-02-27 | Surface Casing Operation Performed |
2012-02-29 | Direction Drilling Operation Performed - Horizontal |
2012-03-08 | Finished Drilling |
2012-03-08 | Well Mode changed to Drilled and Cased |
2012-03-11 | Production Casing Operation Performed |
2012-03-12 | Rig Released |
2012-03-16 | Well Log Performed |
2012-03-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-23 | Well Began Production |
2012-03-23 | Well Fluid changed to Crude Oil |
2012-03-23 | Well Mode changed to Pumping |
2012-11-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-01-01 | Well Fluid changed to Crude Oil |
2019-01-01 | Well Mode changed to Suspended |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-02-24 | Beaver Drilling Ltd. | 7 | N/A | Drill To LD |
2012-02-24 | Beaver Drilling Ltd. | 7 | N/A | Drill To LD |
2012-02-24 | Beaver Drilling Ltd. | 7 | N/A | Drill To LD |
2012-02-24 | Beaver Drilling Ltd. | 7 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-29 | 1270.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-03-21 | Multi-Stage Fracture | 2994.00 | 2994.10 | 0 |
2012-03-21 | Multi-Stage Fracture | 2591.90 | 2592.00 | 0 |
2012-11-06 | Multi-Stage Fracture | 2470.00 | 2470.10 | 0 |
2012-11-06 | Multi-Stage Fracture | 2420.00 | 2420.10 | 0 |
2012-11-06 | Multi-Stage Fracture | 2370.00 | 2370.10 | 0 |
2012-11-07 | Multi-Stage Fracture | 2320.00 | 2320.10 | 0 |
2012-11-08 | Multi-Stage Fracture | 2230.00 | 2230.10 | 0 |
2012-11-08 | Multi-Stage Fracture | 2190.00 | 2190.10 | 0 |
2012-11-08 | Multi-Stage Fracture | 2150.00 | 2150.10 | 0 |
2012-11-08 | Multi-Stage Fracture | 2110.00 | 2110.10 | 0 |
2012-11-08 | Multi-Stage Fracture | 2070.00 | 2070.10 | 0 |
2012-03-21 | Multi-Stage Fracture | 2958.40 | 2958.50 | 0 |
2012-11-09 | Multi-Stage Fracture | 2020.00 | 2020.10 | 0 |
2012-11-09 | Multi-Stage Fracture | 1970.00 | 1970.10 | 0 |
2012-11-09 | Multi-Stage Fracture | 1920.00 | 1920.10 | 0 |
2012-11-09 | Multi-Stage Fracture | 1870.00 | 1870.10 | 0 |
2012-11-09 | Multi-Stage Fracture | 1820.00 | 1820.10 | 0 |
2012-11-09 | Multi-Stage Fracture | 1770.00 | 1770.10 | 0 |
2012-11-10 | Multi-Stage Fracture | 1730.00 | 1730.10 | 0 |
2012-11-10 | Multi-Stage Fracture | 1690.00 | 1690.10 | 0 |
2012-03-21 | Multi-Stage Fracture | 2924.80 | 2924.90 | 0 |
2012-03-21 | Multi-Stage Fracture | 2877.00 | 2877.10 | 0 |
2012-03-21 | Multi-Stage Fracture | 2829.00 | 2829.10 | 0 |
2012-03-21 | Multi-Stage Fracture | 2781.00 | 2781.10 | 0 |
2012-03-21 | Multi-Stage Fracture | 2733.00 | 2733.10 | 0 |
2012-03-21 | Multi-Stage Fracture | 2686.30 | 2686.40 | 0 |
2012-03-21 | Multi-Stage Fracture | 2638.10 | 2638.20 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 4780 | 0.0 | 0.0 | 0.0 |
2013 | 8073 | 0.0 | 0.0 | 0.0 |
2014 | 8073 | 0.0 | 0.0 | 0.0 |
2015 | 7989 | 0.0 | 0.0 | 0.0 |
2016 | 8523 | 0.0 | 0.0 | 0.0 |
2017 | 6683 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-03-27 | No Incident Encountered | 0.00 | 0.00 |
2012-11-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]