X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0776051514000

Well Details

Well ID: 0776051514000
Loading map...
Location: 00/14-15-077-05W6/0
Location Alias: 00/14-15-77-05 W6M
Location Alias 2: 00/14-15-077-05 W6/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 6
Range: 05
Section: 15
County/Municipality: Municipal District of Spirit River No. 133
Well Name: GULF RYCROFT 14-15-77-5
Operator Name: Gulf Canada Limited
License Number: 0113599
License Date: 1985-02-26
License Status: RecCertified
Spud Date: 1985-03-13
Final Drill Date: 1985-03-19
Well Total Depth: 1428.00 m
Surface Hole Latitude: 55.676500
Surface Hole Longitude: -118.686115

For data sources see[1][2]

Well History

Date Event
1985-02-26 Obtained License
1985-03-14 Surface Casing Operation Performed
1985-03-19 Finished Drilling
1985-03-19 Well Log Performed
1985-03-20 Drill Stem Test Performed
1985-03-20 Well Log Performed
1985-03-21 Drill Stem Test Performed
1985-03-22 Drill Stem Test Performed
1985-03-23 Production Casing Operation Performed
1985-03-24 Rig Released
1985-03-24 Well Mode changed to Drilled and Cased
1985-05-24 Well Log Performed
1985-05-25 Well Log Performed
1985-05-26 Perforation Treatment Performed - Jet Perforation
1985-05-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-28 Well Log Performed
1985-05-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-05-29 Plug Back Performed
1985-05-30 Perforation Treatment Performed - Jet Perforation
1985-05-30 Well Log Performed
1985-06-01 Well Log Performed
1985-06-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-06-02 Plug Back Performed
1985-06-02 Well Log Performed
1985-06-03 Perforation Treatment Performed - Jet Perforation
1985-06-05 Perforation Treatment Performed - Fractured
1985-06-10 Well Fluid changed to Crude Oil
1985-06-10 Well Log Performed
1985-06-10 Well Mode changed to Potential
1985-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-06-11 Plug Back Performed
1985-06-11 Well Abandoned
1985-06-11 Well Fluid changed to Crude Oil
1985-06-11 Well Log Performed
1985-06-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-05-26 Perforation 1375.70 1378.00 13
1985-05-27 Acid Treatment 1375.70 1378.00 0
1985-05-29 Packing Device Capped w/Cement 1360.00 1368.00 0
1985-05-30 Perforation 1260.00 1263.00 13
1985-06-02 Packing Device Capped w/Cement 1243.00 1251.00 0
1985-06-03 Perforation 1231.50 1235.00 13
1985-06-05 Fracture 1231.50 1235.00 0
1985-06-11 Packing Device Capped w/Cement 1207.00 1215.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 50 0.0 0.0 0.0

For data sources see[5]

References