X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0775251402002

Well Details

Well ID: 0775251402002
Loading map...
Location: 00/02-14-077-25W5/2
Location Alias: 00/02-14-77-25 W5M
Location Alias 2: 00/02-14-077-25 W5/02
Country: Canada
Province: Alberta
Township: 077
Meridian: 5
Range: 25
Section: 14
County/Municipality: Birch Hills County
Well Name: CNRL EAGLE 2-14-77-25
Operator Name: Canadian Natural Resources Limited
License Number: 0017233
License Date: 1959-06-11
License Status: Suspension
Spud Date: 1959-06-18
Final Drill Date: 1959-07-25
Well Total Depth: 2328.70 m
Surface Hole Latitude: 55.666978
Surface Hole Longitude: -117.761599

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-06-11 Obtained License
1959-06-26 Drill Stem Test Performed
1959-06-29 Drill Stem Test Performed
1959-07-24 Drill Stem Test Performed
1959-07-25 Finished Drilling
1959-07-25 Well Mode changed to Drilled and Cased
1959-07-27 Production Casing Operation Performed
1959-07-29 Perforation Treatment Performed - Jet Perforation
1959-08-01 Perforation Treatment Performed - Jet Perforation
1959-08-02 Perforation Treatment Performed - Remedial Casing
1965-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-02-06 Perforation Treatment Performed - Jet Perforation
1979-02-07 Perforation Treatment Performed - Cement Squeeze
1979-02-09 Perforation Treatment Performed - Jet Perforation
1979-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-03-08 Well Began Production
1979-03-08 Well Fluid changed to Crude Oil
1979-03-08 Well Mode changed to Flowing
1979-05-17 Well Fluid changed to Crude Oil
1979-05-17 Well Mode changed to Suspended
1979-07-25 Perforation Treatment Performed - Cement Squeeze
1979-08-01 Perforation Treatment Performed - Jet Perforation
1979-08-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-08-02 Perforation Treatment Performed - Cement Squeeze
1979-08-04 Perforation Treatment Performed - Jet Perforation
1979-08-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-08-05 Perforation Treatment Performed - Fractured
1982-02-05 Well Fluid changed to Gas
1982-02-05 Well Mode changed to Flowing
1994-08-31 Well Fluid changed to Gas
1994-08-31 Well Mode changed to Suspended
1995-01-24 Perforation Treatment Performed - Jet Perforation
1995-01-25 Well Log Performed
1995-01-27 Perforation Treatment Performed - Remedial Casing
1995-01-29 Well Log Performed
1995-02-01 Perforation Treatment Performed - Casing Patch (Over Perfs)
1995-02-14 Well Log Performed
1995-10-01 Well Fluid changed to Gas
1995-10-01 Well Mode changed to Flowing
1999-11-11 Well Log Performed
2002-11-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-01-01 Well Fluid changed to Gas
2003-01-01 Well Mode changed to Pumping
2017-10-31 Well Fluid changed to Gas
2017-10-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-07-29 Perforation 2299.40 2307.00 13
1979-07-25 Cement Squeeze 1491.40 1498.70 0
1979-08-01 Perforation 1525.00 1526.00 13
1979-08-02 Acid Treatment 1525.00 1526.00 0
1979-08-02 Cement Squeeze 1525.00 1526.00 0
1979-08-04 Perforation 1515.50 1519.00 13
1979-08-05 Acid Treatment 1515.50 1519.00 0
1979-08-05 Fracture 1515.50 1519.00 0
1995-01-24 Perforation 420.30 420.60 13
1995-01-27 Remedial Casing Cementing 420.30 420.60 0
1995-02-01 Casing Patch 420.30 420.60 0
1959-08-01 Perforation 420.30 420.60 13
2002-11-11 Acid Treatment 1515.50 1519.00 0
1959-08-02 Remedial Casing Cementing 420.30 420.60 0
1965-08-24 Acid Treatment 2299.40 2307.00 0
1979-02-04 Packing Device Capped w/Cement 2254.40 2262.00 0
1979-02-06 Perforation 1501.40 1503.30 7
1979-02-07 Cement Squeeze 1501.40 1503.30 0
1979-02-09 Perforation 1491.40 1498.70 7
1979-02-13 Acid Treatment 1491.40 1498.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 840 0.0 0.0 0.0
1982 3658 0.0 0.0 0.0
1983 3996 0.0 0.0 0.0
1984 5181 0.0 0.0 0.0
1985 3762 0.0 0.0 0.0
1986 4054 0.0 0.0 0.0
1987 6522 0.0 0.0 0.0
1988 6960 0.0 0.0 0.0
1989 6314 0.0 0.0 0.0
1990 3836 0.0 0.0 0.0
1991 7002 0.0 0.0 0.0
1992 6638 0.0 0.0 0.0
1993 7158 0.0 0.0 0.0
1994 5765 0.0 0.0 0.0
1995 1912 0.0 0.0 0.0
1996 8501 0.0 0.0 0.0
1997 8587 0.0 0.0 0.0
1998 8441 0.0 0.0 0.0
1999 7784 0.0 0.0 0.0
2000 8266 0.0 0.0 0.0
2001 7820 0.0 0.0 0.0
2002 6181 0.0 0.0 0.0
2003 8718 0.0 0.0 0.0
2004 8745 0.0 0.0 0.0
2005 8737 0.0 0.0 0.0
2006 8592 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8744 0.0 0.0 0.0
2011 8733 0.0 0.0 0.0
2012 7674 0.0 0.0 0.0
2013 8540 0.0 0.0 0.0
2014 8534 0.0 0.0 0.0
2015 4464 0.0 0.0 0.0
2016 6809 0.0 0.0 0.0
2017 2330 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-03-24 No Incident Encountered 0.00 0.00

For data sources see[6]

References