X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0775212107000

Well Details

Well ID: 0775212107000
Loading map...
Location: 00/07-21-077-21W5/0
Location Alias: 00/07-21-77-21 W5M
Location Alias 2: 00/07-21-077-21 W5/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 5
Range: 21
Section: 21
County/Municipality: Municipal District of Smoky River No. 130
Well Name: GALLEON HZ GVILLEE 7-21-77-21
Operator Name: Long Run Exploration Ltd.
License Number: 0407448
License Date: 2009-01-08
License Status: Suspension
Spud Date: 2009-01-24
Final Drill Date: 2009-01-30
Well Total Depth: 1999.00 m
Surface Hole Latitude: 55.678541
Surface Hole Longitude: -117.185731

For data sources see[1][2]

Well History

Date Event
2009-01-08 Obtained License
2009-01-24 Surface Casing Operation Performed
2009-01-26 Direction Drilling Operation Performed - Horizontal
2009-01-27 Intermediate Casing Operation Performed
2009-01-30 Finished Drilling
2009-01-30 Well Mode changed to Drilled and Cased
2009-02-01 Liner Casing Operation Performed
2009-02-02 Rig Released
2009-02-03 Well Log Performed
2009-02-05 Perforation Treatment Performed - Multi-Stage Fracture
2009-02-06 Well Began Production
2009-02-06 Well Fluid changed to Gas
2009-02-06 Well Mode changed to Flowing
2010-08-31 Well Fluid changed to Gas
2010-08-31 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-01-26 673.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-02-05 Multi-Stage Fracture 1200.70 1200.80 0
2009-02-05 Multi-Stage Fracture 1304.20 1304.30 0
2009-02-05 Multi-Stage Fracture 1407.50 1407.60 0
2009-02-05 Multi-Stage Fracture 1510.70 1510.80 0
2009-02-05 Multi-Stage Fracture 1613.90 1614.00 0
2009-02-05 Multi-Stage Fracture 1717.20 1717.30 0
2009-02-05 Multi-Stage Fracture 1820.60 1820.70 0
2009-02-05 Multi-Stage Fracture 1924.20 1924.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 5509 0.0 0.0 0.0

For data sources see[6]

References