X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0775211703000

Well Details

Well ID: 0775211703000
Loading map...
Location: 00/03-17-077-21W5/0
Location Alias: 00/03-17-77-21 W5M
Location Alias 2: 00/03-17-077-21 W5/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 5
Range: 21
Section: 17
County/Municipality: Municipal District of Smoky River No. 130
Well Name: BRALORNE CIL DONNELLY 3-17-77-21
Operator Name: BRL Enterprises Inc.
License Number: 0081857
License Date: 1980-03-25
License Status: RecCertified
Spud Date: 1980-04-10
Final Drill Date: 1980-05-07
Well Total Depth: 2290.00 m
Surface Hole Latitude: 55.668291
Surface Hole Longitude: -117.222094

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-03-25 Obtained License
1980-04-19 Drill Stem Test Performed
1980-04-21 Drill Stem Test Performed
1980-05-07 Finished Drilling
1980-05-10 Drill Stem Test Performed
1980-05-12 Production Casing Operation Performed
1980-11-28 Perforation Treatment Performed - Jet Perforation
1980-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-12-01 Perforation Treatment Performed - Jet Perforation
1980-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-12-03 Perforation Treatment Performed - Cement Squeeze
1980-12-04 Perforation Treatment Performed - Jet Perforation
1980-12-07 Perforation Treatment Performed - Cement Squeeze
1980-12-08 Perforation Treatment Performed - Jet Perforation
1980-12-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-12-13 Perforation Treatment Performed - Cement Squeeze
1980-12-15 Perforation Treatment Performed - Cement Squeeze
1980-12-18 Perforation Treatment Performed - Jet Perforation
1980-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-03 Perforation Treatment Performed - Cement Squeeze
1981-01-04 Perforation Treatment Performed - Jet Perforation
1981-01-07 Perforation Treatment Performed - Cement Squeeze
1981-01-07 Perforation Treatment Performed - Jet Perforation
1981-01-09 Perforation Treatment Performed - Jet Perforation
1981-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-16 Perforation Treatment Performed - Cement Squeeze
1981-01-17 Perforation Treatment Performed - Jet Perforation
1981-01-20 Perforation Treatment Performed - Jet Perforation
1981-01-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-01-22 Perforation Treatment Performed - Jet Perforation
1981-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-09-01 Perforation Treatment Performed - Cement Squeeze
1981-09-02 Perforation Treatment Performed - Jet Perforation
1981-09-10 Well Mode changed to Drilled and Cased
1984-12-01 Well Began Production
1984-12-01 Well Fluid changed to Gas
1984-12-01 Well Mode changed to Flowing
1986-07-03 Well Log Performed
1986-07-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-07-04 Plug Back Performed
1986-07-04 Well Fluid changed to Gas
1986-07-04 Well Mode changed to Abandoned Zone
1986-07-05 Perforation Treatment Performed - Jet Perforation
1990-03-09 Well Log Performed
1990-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-03-10 Plug Back Performed
1990-03-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-11-28 Perforation 1086.80 1088.00 13
1980-12-13 Cement Squeeze 1067.00 1068.50 0
1980-12-15 Cement Squeeze 1067.00 1068.50 0
1980-12-18 Perforation 1064.00 1065.50 13
1980-12-21 Acid Treatment 1064.00 1065.50 0
1981-01-03 Cement Squeeze 1064.00 1065.50 0
1981-01-04 Perforation 961.00 962.50 13
1981-01-07 Perforation 980.00 987.00 13
1981-01-07 Cement Squeeze 961.00 987.00 0
1981-01-09 Perforation 961.00 962.50 13
1981-01-11 Acid Treatment 961.00 962.50 0
1980-11-29 Acid Treatment 1086.80 1088.00 0
1981-01-16 Cement Squeeze 961.00 962.50 0
1981-01-17 Perforation 844.00 847.00 13
1981-01-20 Perforation 889.00 892.00 13
1981-01-22 Packing Device Capped w/Cement 887.00 887.00 0
1981-01-22 Perforation 863.00 867.00 13
1981-01-26 Acid Treatment 863.00 867.00 0
1981-09-01 Cement Squeeze 863.00 867.00 0
1981-09-02 Perforation 847.00 849.00 0
1981-09-02 Perforation 834.50 841.00 0
1986-07-04 Packing Device Capped w/Cement 818.00 824.00 0
1980-12-01 Perforation 1083.50 1084.80 13
1986-07-05 Perforation 471.00 473.00 13
1990-03-10 Packing Device Capped w/Cement 457.00 465.00 0
1980-12-02 Acid Treatment 1083.50 1084.80 0
1980-12-03 Cement Squeeze 1083.50 1084.80 0
1980-12-04 Perforation 1078.00 1078.60 13
1980-12-07 Cement Squeeze 1078.00 1078.60 0
1980-12-08 Perforation 1067.00 1068.50 13
1980-12-10 Acid Treatment 1067.00 1068.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 513 0.0 0.0 0.0
1985 6840 0.0 0.0 0.0
1986 389 0.0 0.0 0.0

For data sources see[5]

References