X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0775211102002

Well Details

Well ID: 0775211102002
Loading map...
Location: 00/02-11-077-21W5/2
Location Alias: 00/02-11-77-21 W5M
Location Alias 2: 00/02-11-077-21 W5/02
Country: Canada
Province: Alberta
Township: 077
Meridian: 5
Range: 21
Section: 11
County/Municipality: Municipal District of Smoky River No. 130
Well Name: BRALORNE CIL GVILLE 2-11-77-21
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0094551
License Date: 1982-01-18
License Status: RecCertified
Spud Date: 1982-03-19
Final Drill Date: 1982-03-24
Well Total Depth: 1117.50 m
Surface Hole Latitude: 55.653981
Surface Hole Longitude: -117.143294

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-01-18 Obtained License
1982-03-24 Finished Drilling
1982-03-26 Production Casing Operation Performed
1983-10-25 Perforation Treatment Performed - Jet Perforation
1985-08-22 Well Log Performed
1985-08-23 Perforation Treatment Performed - Jet Perforation
1985-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-08-24 Well Log Performed
1985-08-25 Perforation Treatment Performed - Jet Perforation
1985-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-08-29 Well Log Performed
1985-08-30 Perforation Treatment Performed - Abrasa-Jet Perforation
1985-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-11-01 Well Mode changed to Drilled and Cased
1990-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-02-24 Plug Back Performed
1990-02-24 Well Log Performed
1990-02-24 Well Mode changed to Abandoned
1990-02-25 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-10-25 Perforation 831.00 834.00 13
1985-08-23 Perforation 1066.50 1069.00 13
1985-08-24 Acid Treatment 1066.50 1069.00 0
1985-08-25 Perforation 1069.00 1072.00 13
1985-08-27 Acid Treatment 1066.50 1072.00 0
1985-08-30 Hydra Jet Perforation 1062.50 1066.10 0
1985-09-05 Acid Treatment 1062.50 1072.00 0
1990-02-24 Packing Device Capped w/Cement 1052.00 1060.00 0
1990-02-24 Packing Device Capped w/Cement 817.00 825.00 0

For data sources see[4]



References