If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0775211013020 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]()  | 
| Location: 02/13-10-077-21W5/0 | |
| Location Alias: 02/13-10-77-21 W5M | |
| Location Alias 2: 02/13-10-077-21 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 077 | |
| Meridian: 5 | |
| Range: 21 | |
| Section: 10 | |
| County/Municipality: Municipal District of Smoky River No. 130 | |
| Well Name: GALLEON 102 HZ GVILLEE 13-10-77-21 | |
| Operator Name: Long Run Exploration Ltd. | |
| License Number: 0417441 | |
| License Date: 2010-01-15 | |
| License Status: Suspension | |
| Spud Date: 2010-01-26 | |
| Final Drill Date: 2010-02-02 | |
| Well Total Depth: 1833.00 m | |
| Surface Hole Latitude: 55.662025 | |
| Surface Hole Longitude: -117.167953 | 
| Date | Event | 
|---|---|
| 2010-01-15 | Obtained License | 
| 2010-01-27 | Surface Casing Operation Performed | 
| 2010-01-29 | Direction Drilling Operation Performed - Deviate | 
| 2010-01-29 | Direction Drilling Operation Performed - Horizontal | 
| 2010-01-29 | Well Log Performed | 
| 2010-01-30 | Intermediate Casing Operation Performed | 
| 2010-02-02 | Finished Drilling | 
| 2010-02-02 | Well Log Performed | 
| 2010-02-02 | Well Mode changed to Drilled and Cased | 
| 2010-02-03 | Liner Casing Operation Performed | 
| 2010-02-04 | Rig Released | 
| 2010-02-09 | Perforation Treatment Performed - Multi-Stage Fracture | 
| 2010-02-11 | Well Began Production | 
| 2010-02-11 | Well Fluid changed to Gas | 
| 2010-02-11 | Well Mode changed to Flowing | 
| 2010-08-31 | Well Fluid changed to Gas | 
| 2010-08-31 | Well Mode changed to Suspended | 
For data sources see[3]
| Start Date | Depth (m) | Reason | 
|---|---|---|
| 2010-01-29 | 737.00 | Deviate (5 - 79 degrees) | 
| 2010-01-29 | 1034.00 | Horizontal | 
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | 
|---|---|---|---|---|
| 2010-02-09 | Multi-Stage Fracture | 1801.90 | 1802.90 | 0 | 
| 2010-02-09 | Multi-Stage Fracture | 1630.20 | 1631.20 | 0 | 
| 2010-02-09 | Multi-Stage Fracture | 1481.50 | 1482.50 | 0 | 
| 2010-02-09 | Multi-Stage Fracture | 1327.00 | 1328.00 | 0 | 
| 2010-02-09 | Multi-Stage Fracture | 1187.40 | 1188.40 | 0 | 
For data sources see[5]
 
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) | 
|---|---|---|---|---|
| 2010 | 168 | 0.0 | 0.0 | 0.0 | 
For data sources see[6]