X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0775211011000

Well Details

Well ID: 0775211011000
Loading map...
Location: 00/11-10-077-21W5/0
Location Alias: 00/11-10-77-21 W5M
Location Alias 2: 00/11-10-077-21 W5/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 5
Range: 21
Section: 10
County/Municipality: Municipal District of Smoky River No. 130
Well Name: GALLEON HZ GVILLEE 11-10-77-21
Operator Name: Long Run Exploration Ltd.
License Number: 0434567
License Date: 2011-06-23
License Status: Suspension
Spud Date: 2011-07-31
Final Drill Date: 2011-08-06
Well Total Depth: 2092.00 m
Surface Hole Latitude: 55.652254
Surface Hole Longitude: -117.187418

For data sources see[1][2]

Well History

Date Event
2011-06-23 Obtained License
2011-08-01 Surface Casing Operation Performed
2011-08-02 Direction Drilling Operation Performed - Deviate
2011-08-03 Well Log Performed
2011-08-04 Direction Drilling Operation Performed - Horizontal
2011-08-04 Intermediate Casing Operation Performed
2011-08-06 Finished Drilling
2011-08-06 Well Log Performed
2011-08-06 Well Mode changed to Drilled and Cased
2011-08-07 Liner Casing Operation Performed
2011-08-07 Perforation Treatment Performed - Open-Hole Completion
2011-08-07 Rig Released
2011-08-12 Perforation Treatment Performed - Multi-Stage Fracture
2011-08-12 Well Fluid changed to Gas
2011-08-12 Well Mode changed to Testing
2011-08-16 Well Fluid changed to Gas
2011-08-16 Well Mode changed to Test Completed
2011-08-22 Well Began Production
2011-08-22 Well Fluid changed to Gas
2011-08-22 Well Mode changed to Flowing
2012-11-01 Well Fluid changed to Gas
2012-11-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-02 662.00 Deviate (5 - 79 degrees)
2011-08-04 1214.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-08-07 Open Hole/Barefoot Completion 2050.90 2092.00 0
2011-08-12 Multi-Stage Fracture 1372.50 1372.60 0
2011-08-12 Multi-Stage Fracture 1274.50 1274.60 0
2011-08-12 Multi-Stage Fracture 2050.80 2050.90 0
2011-08-12 Multi-Stage Fracture 1964.40 1964.50 0
2011-08-12 Multi-Stage Fracture 1878.00 1878.10 0
2011-08-12 Multi-Stage Fracture 1791.70 1791.80 0
2011-08-12 Multi-Stage Fracture 1706.00 1706.10 0
2011-08-12 Multi-Stage Fracture 1619.60 1619.70 0
2011-08-12 Multi-Stage Fracture 1544.90 1545.00 0
2011-08-12 Multi-Stage Fracture 1458.20 1458.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1558 0.0 0.0 0.0

For data sources see[6]

References