X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0775210212000

Well Details

Well ID: 0775210212000
Loading map...
Location: 00/12-02-077-21W5/0
Location Alias: 00/12-02-77-21 W5M
Location Alias 2: 00/12-02-077-21 W5/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 5
Range: 21
Section: 02
County/Municipality: Municipal District of Smoky River No. 130
Well Name: BRALORNE CIL DONNELLY 12-2-77-21
Operator Name: BRL Enterprises Inc.
License Number: 0086513
License Date: 1980-10-22
License Status: RecCertified
Spud Date: 1980-10-28
Final Drill Date: 1980-11-10
Well Total Depth: 1300.00 m
Surface Hole Latitude: 55.644693
Surface Hole Longitude: -117.151830

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-10-22 Obtained License
1980-11-03 Drill Stem Test Performed
1980-11-07 Drill Stem Test Performed
1980-11-08 Drill Stem Test Performed
1980-11-10 Finished Drilling
1980-11-13 Production Casing Operation Performed
1980-12-15 Perforation Treatment Performed - Jet Perforation
1980-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-12-17 Perforation Treatment Performed - Cement Squeeze
1980-12-18 Perforation Treatment Performed - Jet Perforation
1980-12-21 Perforation Treatment Performed - Cement Squeeze
1981-01-02 Perforation Treatment Performed - Jet Perforation
1981-01-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-05 Perforation Treatment Performed - Cement Squeeze
1981-01-06 Perforation Treatment Performed - Jet Perforation
1981-01-08 Perforation Treatment Performed - Jet Perforation
1981-01-11 Perforation Treatment Performed - Jet Perforation
1981-01-11 Well Mode changed to Drilled and Cased
1981-08-07 Perforation Treatment Performed - Jet Perforation
1981-08-10 Perforation Treatment Performed - Jet Perforation
1981-09-17 Perforation Treatment Performed - Cement Squeeze
1981-09-24 Perforation Treatment Performed - Jet Perforation
1981-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-12-01 Well Began Production
1984-12-01 Well Fluid changed to Gas
1984-12-01 Well Mode changed to Flowing
1985-12-01 Well Fluid changed to Gas
1985-12-01 Well Mode changed to Suspended
1990-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-03-10 Plug Back Performed
1990-03-10 Well Abandoned
1990-03-10 Well Fluid changed to Gas
1990-03-10 Well Log Performed
1990-03-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-12-15 Perforation 1085.50 1087.20 13
1981-01-08 Perforation 840.00 842.50 13
1981-01-11 Perforation 835.00 837.00 13
1981-08-07 Perforation 859.20 862.00 6
1981-08-10 Perforation 851.00 855.00 13
1981-09-17 Cement Squeeze 840.00 855.00 0
1981-09-24 Perforation 835.00 837.00 13
1981-09-25 Acid Treatment 835.00 837.00 0
1990-03-10 Packing Device Capped w/Cement 822.00 830.00 0
1980-12-16 Acid Treatment 1085.50 1087.20 0
1980-12-17 Cement Squeeze 1085.50 1087.20 0
1980-12-18 Perforation 1067.00 1068.50 13
1980-12-21 Cement Squeeze 1067.00 1068.50 0
1981-01-02 Perforation 885.00 887.00 14
1981-01-03 Acid Treatment 885.00 887.00 0
1981-01-05 Cement Squeeze 885.00 887.00 0
1981-01-06 Perforation 844.00 846.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 13 0.0 0.0 0.0
1985 702 0.0 0.0 0.0

For data sources see[5]

References