X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0775102911000

Well Details

Well ID: 0775102911000
Loading map...
Location: 00/11-29-077-10W5/0
Location Alias: 00/11-29-77-10 W5M
Location Alias 2: 00/11-29-077-10 W5/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 5
Range: 10
Section: 29
County/Municipality: Big Lakes County
Well Name: WINCAN ET AL RANDELL 11-29-77-10
Operator Name: ARC Resources Ltd.
License Number: 0112426
License Date: 1985-01-10
License Status: RecCertified
Spud Date: 1985-01-15
Final Drill Date: 1985-01-24
Well Total Depth: 1894.70 m
Surface Hole Latitude: 55.704635
Surface Hole Longitude: -115.518542

For data sources see[1][2]

Well History

Date Event
1985-01-10 Obtained License
1985-01-16 Surface Casing Operation Performed
1985-01-24 Finished Drilling
1985-01-24 Well Log Performed
1985-01-24 Well Mode changed to Drilled and Cased
1985-01-26 Drill Stem Test Performed
1985-01-28 Production Casing Operation Performed
1985-01-28 Rig Released
1985-02-02 Perforation Treatment Performed - Jet Perforation
1985-02-02 Well Log Performed
1985-02-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-02-09 Perforation Treatment Performed - Jet Perforation
1985-02-09 Well Log Performed
1985-02-10 Perforation Treatment Performed - Cement Squeeze
1985-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-02-16 Perforation Treatment Performed - Fractured
1985-03-19 Well Began Production
1985-03-19 Well Fluid changed to Crude Oil
1985-03-19 Well Mode changed to Pumping
1985-03-26 Well Fluid changed to Crude Oil
1985-03-26 Well Mode changed to Suspended
1985-11-01 Well Fluid changed to Crude Oil
1985-11-01 Well Mode changed to Pumping
1986-03-15 Well Fluid changed to Crude Oil
1986-03-15 Well Mode changed to Suspended
1989-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-01-24 Plug Back Performed
1989-01-24 Well Abandoned
1989-01-24 Well Fluid changed to Crude Oil
1989-01-24 Well Mode changed to Abandoned
1989-01-25 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-02-02 Perforation 1840.00 1841.00 7
1985-02-16 Fracture 1824.00 1834.00 0
1989-01-24 Packing Device Capped w/Cement 1812.00 1820.00 0
1985-02-04 Acid Treatment 1840.00 1841.00 0
1985-02-06 Acid Treatment 1840.00 1841.00 0
1985-02-09 Perforation 1832.00 1834.00 7
1985-02-09 Perforation 1830.00 1831.00 7
1985-02-09 Perforation 1826.00 1828.00 7
1985-02-09 Perforation 1824.00 1825.00 7
1985-02-10 Cement Squeeze 1840.00 1841.00 0
1985-02-11 Acid Treatment 1824.00 1834.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 949 0.0 0.0 0.0
1986 1353 0.0 0.0 0.0

For data sources see[5]

References