If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0774110309000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.645681,"lon":-111.614962,"icon":""}]} |
Location: 00/09-03-077-11W4/0 | |
Location Alias: 00/09-03-77-11 W4M | |
Location Alias 2: 00/09-03-077-11 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 077 | |
Meridian: 4 | |
Range: 11 | |
Section: 03 | |
County/Municipality: Lac La Biche County | |
Well Name: NORTHROCK LEISMER 9-3-77-11 | |
Operator Name: Sequoia Resources Corp. | |
License Number: 0173455 | |
License Date: 1994-12-06 | |
License Status: RecCertified | |
Spud Date: 1995-01-21 | |
Final Drill Date: 1995-01-23 | |
Well Total Depth: 518.00 m | |
Surface Hole Latitude: 55.645681 | |
Surface Hole Longitude: -111.614962 |
Date | Event |
---|---|
1994-12-06 | Obtained License |
1995-01-21 | Surface Casing Operation Performed |
1995-01-23 | Finished Drilling |
1995-01-23 | Well Log Performed |
1995-01-24 | Production Casing Operation Performed |
1995-01-24 | Rig Released |
1995-01-27 | Well Log Performed |
1995-01-28 | Perforation Treatment Performed - Jet Perforation |
1995-01-28 | Well Log Performed |
1995-01-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-01-29 | Plug Back Performed |
1995-01-29 | Well Log Performed |
1995-01-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-01-30 | Perforation Treatment Performed - Jet Perforation |
1995-01-30 | Plug Back Performed |
1995-01-30 | Well Log Performed |
1995-02-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-02-01 | Plug Back Performed |
1995-02-01 | Well Abandoned |
1995-02-01 | Well Log Performed |
1995-02-01 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-01-28 | Perforation | 445.00 | 446.00 | 13 |
1995-01-28 | Perforation | 449.00 | 457.00 | 13 |
1995-01-28 | Perforation | 459.00 | 460.00 | 13 |
1995-01-28 | Perforation | 462.00 | 464.00 | 13 |
1995-01-29 | Packing Device Capped w/Cement | 432.00 | 440.00 | 0 |
1995-01-30 | Perforation | 386.00 | 387.00 | 13 |
1995-01-30 | Packing Device Capped w/Cement | 372.00 | 380.00 | 0 |
1995-01-30 | Perforation | 294.00 | 295.00 | 13 |
1995-02-01 | Packing Device Capped w/Cement | 281.00 | 289.00 | 0 |
For data sources see[4]