If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0766132602000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.619275,"lon":-119.91078,"icon":""}]} |
Location: 00/02-26-076-13W6/0 | |
Location Alias: 00/02-26-76-13 W6M | |
Location Alias 2: 00/02-26-076-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 6 | |
Range: 13 | |
Section: 26 | |
County/Municipality: Saddle Hills County | |
Well Name: AVN HZ GLACIER 2-26-76-13 | |
Operator Name: Advantage Oil & Gas Ltd. | |
License Number: 0418650 | |
License Date: 2010-02-17 | |
License Status: Issued | |
Spud Date: 2010-06-11 | |
Final Drill Date: 2010-06-26 | |
Well Total Depth: 3635.00 m | |
Surface Hole Latitude: 55.619275 | |
Surface Hole Longitude: -119.910780 |
Date | Event |
---|---|
2010-02-17 | Obtained License |
2010-06-13 | Surface Casing Operation Performed |
2010-06-18 | Direction Drilling Operation Performed - Horizontal |
2010-06-26 | Finished Drilling |
2010-06-26 | Well Log Performed |
2010-06-26 | Well Mode changed to Drilled and Cased |
2010-06-27 | Well Log Performed |
2010-06-29 | Production Casing Operation Performed |
2010-06-29 | Rig Released |
2010-09-24 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2010-09-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-09-24 | Perforation Treatment Performed - Fractured |
2010-09-25 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2010-09-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-09-25 | Perforation Treatment Performed - Fractured |
2010-09-26 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2010-09-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-09-26 | Perforation Treatment Performed - Fractured |
2010-12-04 | Well Began Production |
2010-12-04 | Well Fluid changed to Gas |
2010-12-04 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-06-18 | 2023.20 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-09-24 | Hydra Jet Perforation | 3611.00 | 3612.00 | 3 |
2010-09-25 | Hydra Jet Perforation | 3175.00 | 3176.00 | 3 |
2010-09-25 | Acid Treatment | 3175.00 | 3176.00 | 0 |
2010-09-25 | Fracture | 3175.00 | 3176.00 | 0 |
2010-09-25 | Hydra Jet Perforation | 3029.00 | 3030.00 | 3 |
2010-09-25 | Acid Treatment | 3029.00 | 3030.00 | 0 |
2010-09-25 | Fracture | 3029.00 | 3030.00 | 0 |
2010-09-25 | Hydra Jet Perforation | 2883.00 | 2884.00 | 3 |
2010-09-25 | Acid Treatment | 2883.00 | 2884.00 | 0 |
2010-09-26 | Fracture | 2883.00 | 2884.00 | 0 |
2010-09-26 | Hydra Jet Perforation | 2737.00 | 2738.00 | 3 |
2010-09-24 | Acid Treatment | 3611.00 | 3612.00 | 0 |
2010-09-26 | Acid Treatment | 2737.00 | 2738.00 | 0 |
2010-09-26 | Fracture | 2737.00 | 2738.00 | 0 |
2010-09-26 | Hydra Jet Perforation | 2591.00 | 2592.00 | 3 |
2010-09-26 | Acid Treatment | 2591.00 | 2592.00 | 0 |
2010-09-26 | Hydra Jet Perforation | 2585.00 | 2589.00 | 3 |
2010-09-26 | Acid Treatment | 2585.00 | 2589.00 | 0 |
2010-09-26 | Fracture | 2585.00 | 2592.00 | 0 |
2010-09-26 | Hydra Jet Perforation | 2438.00 | 2439.00 | 3 |
2010-09-26 | Acid Treatment | 2438.00 | 2439.00 | 0 |
2010-09-26 | Fracture | 2438.00 | 2439.00 | 0 |
2010-09-24 | Fracture | 3611.00 | 3612.00 | 0 |
2010-09-24 | Hydra Jet Perforation | 3467.00 | 3468.00 | 3 |
2010-09-25 | Acid Treatment | 3467.00 | 3468.00 | 0 |
2010-09-25 | Fracture | 3467.00 | 3468.00 | 0 |
2010-09-25 | Hydra Jet Perforation | 3321.00 | 3322.00 | 3 |
2010-09-25 | Acid Treatment | 3321.00 | 3322.00 | 0 |
2010-09-25 | Fracture | 3321.00 | 3322.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 327 | 0.0 | 0.0 | 0.0 |
2011 | 6653 | 0.0 | 0.0 | 0.0 |
2012 | 8536 | 0.0 | 0.0 | 0.0 |
2013 | 8540 | 0.0 | 0.0 | 0.0 |
2014 | 7639 | 0.0 | 0.0 | 0.0 |
2015 | 4641 | 0.0 | 0.0 | 0.0 |
2016 | 7393 | 0.0 | 0.0 | 0.0 |
2017 | 7746 | 0.0 | 0.0 | 0.0 |
2018 | 7745 | 0.0 | 0.0 | 0.0 |
2019 | 6952 | 0.0 | 0.0 | 0.0 |
2020 | 2152 | 0.0 | 0.0 | 0.0 |
For data sources see[6]