X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0766131815030

Well Details

Well ID: 0766131815030
Loading map...
Location: 03/15-18-076-13W6/0
Location Alias: 03/15-18-76-13 W6M
Location Alias 2: 03/15-18-076-13 W6/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 6
Range: 13
Section: 18
County/Municipality: Saddle Hills County
Well Name: AVN 103 HZ PCOUPES 15-18-76-13
Operator Name: Advantage Oil & Gas Ltd.
License Number: 0485181
License Date: 2017-08-28
License Status: Issued
Spud Date: 2017-09-29
Final Drill Date: 2017-10-10
Well Total Depth: 5004.00 m
Surface Hole Latitude: 55.576162
Surface Hole Longitude: -119.971187

For data sources see[1][2]

Well History

Date Event
2017-08-28 Obtained License
2017-09-29 Surface Casing Operation Performed
2017-09-30 Direction Drilling Operation Performed - Deviate
2017-10-04 Direction Drilling Operation Performed - Horizontal
2017-10-05 Well Log Performed
2017-10-09 Well Log Performed
2017-10-10 Finished Drilling
2017-10-10 Well Mode changed to Drilled and Cased
2017-10-11 Production Casing Operation Performed
2017-10-12 Rig Released
2017-12-10 Perforation Treatment Performed - Open-Hole Completion
2017-12-11 Well Log Performed
2018-01-14 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-15 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-16 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-19 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-20 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-21 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-22 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-23 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-24 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-25 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-26 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-27 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-16 Well Began Production
2018-03-16 Well Fluid changed to Gas
2018-03-16 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-09-29 Horizon Drilling Inc. 52 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-09-30 491.00 Deviate (5 - 79 degrees)
2017-10-04 2617.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-12-10 Open Hole/Barefoot Completion 4998.00 5004.00 0
2018-01-21 Multi-Stage Fracture 4484.70 4484.80 0
2018-01-21 Multi-Stage Fracture 4420.10 4420.20 0
2018-01-21 Multi-Stage Fracture 4354.80 4354.90 0
2018-01-21 Multi-Stage Fracture 4290.20 4290.30 0
2018-01-21 Multi-Stage Fracture 4225.20 4225.30 0
2018-01-22 Multi-Stage Fracture 4160.10 4160.20 0
2018-01-22 Multi-Stage Fracture 4095.00 4095.10 0
2018-01-22 Multi-Stage Fracture 4029.80 4029.90 0
2018-01-22 Multi-Stage Fracture 3964.60 3964.70 0
2018-01-22 Multi-Stage Fracture 3900.30 3900.40 0
2018-01-14 Multi-Stage Fracture 4986.60 4986.70 0
2018-01-23 Multi-Stage Fracture 3835.00 3835.10 0
2018-01-23 Multi-Stage Fracture 3770.00 3770.10 0
2018-01-23 Multi-Stage Fracture 3705.10 3705.20 0
2018-01-23 Multi-Stage Fracture 3640.00 3640.10 0
2018-01-23 Multi-Stage Fracture 3575.20 3575.30 0
2018-01-23 Multi-Stage Fracture 3510.20 3510.30 0
2018-01-23 Multi-Stage Fracture 3445.00 3445.10 0
2018-01-24 Multi-Stage Fracture 3379.90 3380.00 0
2018-01-24 Multi-Stage Fracture 3314.70 3314.80 0
2018-01-24 Multi-Stage Fracture 3249.40 3249.50 0
2018-01-15 Multi-Stage Fracture 4927.50 4927.60 0
2018-01-24 Multi-Stage Fracture 3184.40 3184.50 0
2018-01-24 Multi-Stage Fracture 3119.70 3119.80 0
2018-01-25 Multi-Stage Fracture 3054.50 3054.60 0
2018-01-25 Multi-Stage Fracture 2989.20 2989.30 0
2018-01-26 Multi-Stage Fracture 2924.00 2924.10 0
2018-01-27 Multi-Stage Fracture 2859.00 2859.10 0
2018-01-27 Multi-Stage Fracture 2793.80 2793.90 0
2018-01-27 Multi-Stage Fracture 2728.60 2728.70 0
2018-01-15 Multi-Stage Fracture 4874.80 4874.90 0
2018-01-16 Multi-Stage Fracture 4810.10 4810.20 0
2018-01-16 Multi-Stage Fracture 4745.60 4745.70 0
2018-01-16 Multi-Stage Fracture 4680.30 4680.40 0
2018-01-19 Multi-Stage Fracture 4615.00 4615.10 0
2018-01-20 Multi-Stage Fracture 4549.80 4549.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-01-14 2018-01-27 2,527 19,836 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 88.65 N/A
Sand - Tier 1 (30/50) Trican Well Service Aluminum Oxide 1344-28-1 100 5.2033 N/A
Crystalline silica. quartz 14808-60-7 100 5.2033 N/A
Iron Oxide 1309-37-1 100 5.2033 N/A
Titanium Oxide 13463-67-7 100 5.2033 N/A
Sand - Tier 1 (40/70) Trican Well Service Aluminum Oxide 1344-28-1 100 4.1668 N/A
Crystalline silica. quartz 14808-60-7 100 4.1668 N/A
Iron Oxide 1309-37-1 100 4.1668 N/A
Titanium Oxide 13463-67-7 100 4.1668 N/A
AQUCAR DB20 Biocide Trican Well Service Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0114 N/A
2-mercaptoethanol 60-24-2 100 0.0114 N/A
dibromoacetonitrile 3252-43-5 100 0.0114 N/A
non-hazardous ingredients Not Available 100 0.0114 N/A
sodium bromide 7647-15-6 100 0.0114 N/A
EnCap-HP (Breaker Encapsulated Oxidizer) Trican Well Service Breaker ammonium persulfate 7727-54-0 100 0.0061 N/A
cured acrylic resin Not Available 100 0.0061 N/A
silica crystalline 14808-60-7 100 0.0061 N/A
pH-13W High pH Adjuster Trican Well Service Buffer Methyl Alcohol 67-56-1 100 0.0345 N/A
Sodium Hydroxide 1310-73-2 100 0.0345 N/A
Water 7732-18-5 100 0.0345 N/A
CC-8 Clay Stabilizer Trican Well Service Clay Control choline chloride 67-48-1 100 0.2033 N/A
non-hazardous ingredients Not Available 100 0.2033 N/A
WXB-17 Instant Cross Linker Trican Well Service Crosslinker 2-aminoethanol 141-43-5 100 0.0295 N/A
orthoboric acid 26038-87-9 100 0.0295 N/A
Water 7732-18-5 100 0.0295 N/A
Nitrogen Gas Trican Well Service Energizing Fluid Nitrogen 7727-37-9 100 1.4474 N/A
Non-hazardous base ingredient(s) Not Available 100 1.4473 N/A
FR-23 Friction Reducer Trican Well Service Gelling Agent No hazardous ingredients Not Available 100 0.0905 N/A
WG-111LA (Rapid Gellant. Buffered) Trican Well Service Gelling Agent fumaric acid 110-17-8 100 0.066 N/A
guar gum 9000-30-0 100 0.066 N/A
solvent naphtha (petroleum). heavy aliphatic 64742-96-7 100 0.066 N/A
nanoFLO 2 Trican Well Service Surfactant Refer to MSDS 1097 100 0.0907 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-12-09 2017-12-09 Central Water Distribution Facility 37
2017-12-11 2017-12-19 Central Water Distribution Facility 1023
2018-01-14 2018-01-14 Central Water Distribution Facility 455
2018-01-14 2018-01-24 Surface Water - Lake 11940
2017-12-14 2018-01-29 Municipal Water 7104

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 4810 0.0 0.0 0.0
2019 8687 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-10-10 No Incident Encountered 0.00 0.00
2018-01-27 No Incident Encountered 0.00 0.00

For data sources see[10]

References