X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0766131601032

Well Details

Well ID: 0766131601032
Loading map...
Location: 03/01-16-076-13W6/2
Location Alias: 03/01-16-76-13 W6M
Location Alias 2: 03/01-16-076-13 W6/02
Country: Canada
Province: Alberta
Township: 076
Meridian: 6
Range: 13
Section: 16
County/Municipality: Saddle Hills County
Well Name: AVN 103 HZ GLACIER 1-16-76-13
Operator Name: Advantage Oil & Gas Ltd.
License Number: 0447690
License Date: 2012-08-10
License Status: Amended
Spud Date: 2012-08-19
Final Drill Date: 2012-10-02
Well Total Depth: 4258.00 m
Surface Hole Latitude: 55.589750
Surface Hole Longitude: -119.962623

For data sources see[1][2]

Well History

Date Event
2012-08-10 Obtained License
2012-08-21 Surface Casing Operation Performed
2012-09-10 Direction Drilling Operation Performed - Horizontal
2012-09-17 Well Log Performed
2012-10-02 Finished Drilling
2012-10-02 Well Log Performed
2012-10-02 Well Mode changed to Drilled and Cased
2012-10-03 Production Casing Operation Performed
2012-10-05 Rig Released
2012-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-10-31 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-11-04 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-11-05 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-11-06 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-11-07 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-11-08 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-11-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-11-11 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-17 Well Began Production
2012-11-17 Well Fluid changed to Gas
2012-11-17 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-09-10 2240.10 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-10-31 Multi-Stage Fracture 4230.00 4231.00 0
2012-11-05 Multi-Stage Fracture 3880.00 3881.00 0
2012-11-05 Multi-Stage Fracture 3830.00 3831.00 0
2012-11-05 Acid Treatment 3830.00 3931.00 0
2012-11-06 Multi-Stage Fracture 3780.00 3781.00 0
2012-11-06 Multi-Stage Fracture 3730.00 3731.00 0
2012-11-06 Multi-Stage Fracture 3680.00 3681.00 0
2012-11-06 Acid Treatment 3680.00 3781.00 0
2012-11-07 Multi-Stage Fracture 3630.00 3631.00 0
2012-11-07 Multi-Stage Fracture 3580.00 3581.00 0
2012-11-07 Multi-Stage Fracture 3530.00 3531.00 0
2012-10-31 Multi-Stage Fracture 4180.00 4181.00 0
2012-11-07 Acid Treatment 3530.00 3631.00 0
2012-11-08 Multi-Stage Fracture 3480.00 3481.00 0
2012-11-08 Multi-Stage Fracture 3430.00 3431.00 0
2012-11-08 Multi-Stage Fracture 3380.00 3381.00 0
2012-11-08 Acid Treatment 3380.00 3481.00 0
2012-11-09 Multi-Stage Fracture 3330.00 3331.00 0
2012-11-09 Multi-Stage Fracture 3280.00 3281.00 0
2012-11-09 Multi-Stage Fracture 3230.00 3231.00 0
2012-11-09 Acid Treatment 3230.00 3331.00 0
2012-11-09 Multi-Stage Fracture 3180.00 3181.00 0
2012-10-31 Multi-Stage Fracture 4130.00 4131.00 0
2012-11-09 Multi-Stage Fracture 3130.00 3131.00 0
2012-11-09 Multi-Stage Fracture 3080.00 3081.00 0
2012-11-09 Acid Treatment 3080.00 3181.00 0
2012-11-11 Multi-Stage Fracture 3030.00 3031.00 0
2012-11-11 Multi-Stage Fracture 2980.00 2981.00 0
2012-11-11 Multi-Stage Fracture 2930.00 2931.00 0
2012-11-11 Acid Treatment 2930.00 3031.00 0
2012-11-11 Multi-Stage Fracture 2880.00 2881.00 0
2012-11-11 Multi-Stage Fracture 2830.00 2831.00 0
2012-11-11 Multi-Stage Fracture 2780.00 2781.00 0
2012-10-31 Acid Treatment 4130.00 4231.00 0
2012-11-11 Acid Treatment 2780.00 2881.00 0
2012-11-11 Multi-Stage Fracture 2730.00 2731.00 0
2012-11-11 Multi-Stage Fracture 2680.00 2681.00 0
2012-11-11 Multi-Stage Fracture 2630.00 2631.00 0
2012-11-11 Acid Treatment 2630.00 2731.00 0
2012-11-04 Multi-Stage Fracture 4080.00 4081.00 0
2012-11-04 Multi-Stage Fracture 4030.00 4031.00 0
2012-11-04 Multi-Stage Fracture 3980.00 3981.00 0
2012-11-04 Acid Treatment 3980.00 4081.00 0
2012-11-05 Multi-Stage Fracture 3930.00 3931.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 963 0.0 0.0 0.0
2013 7344 0.0 0.0 0.0
2014 7620 0.0 0.0 0.0
2015 4141 0.0 0.0 0.0
2016 7017 0.0 0.0 0.0
2017 5998 0.0 0.0 0.0
2018 7471 0.0 0.0 0.0
2019 8298 0.0 0.0 0.0
2020 2166 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-19 No Incident Encountered 0.00 0.00
2012-11-22 No Incident Encountered 0.00 0.00

For data sources see[7]

References