If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0766131516000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.581923,"lon":-119.885504,"icon":""}]} |
Location: 00/16-15-076-13W6/0 | |
Location Alias: 00/16-15-76-13 W6M | |
Location Alias 2: 00/16-15-076-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 6 | |
Range: 13 | |
Section: 15 | |
County/Municipality: Saddle Hills County | |
Well Name: AVN HZ GLACIER 16-15-76-13 | |
Operator Name: Advantage Oil & Gas Ltd. | |
License Number: 0421070 | |
License Date: 2010-06-09 | |
License Status: Issued | |
Spud Date: 2010-08-16 | |
Final Drill Date: 2010-09-03 | |
Well Total Depth: 4580.00 m | |
Surface Hole Latitude: 55.581923 | |
Surface Hole Longitude: -119.885504 |
Date | Event |
---|---|
2010-06-09 | Obtained License |
2010-08-17 | Surface Casing Operation Performed |
2010-08-22 | Direction Drilling Operation Performed - Horizontal |
2010-08-22 | Well Log Performed |
2010-09-03 | Finished Drilling |
2010-09-03 | Production Casing Operation Performed |
2010-09-03 | Well Log Performed |
2010-09-03 | Well Mode changed to Drilled and Cased |
2010-09-06 | Well Log Performed |
2010-09-07 | Rig Released |
2010-11-01 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2010-11-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-11-01 | Perforation Treatment Performed - Fractured |
2010-11-02 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2010-11-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-11-02 | Perforation Treatment Performed - Fractured |
2010-11-03 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2010-11-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-11-03 | Perforation Treatment Performed - Fractured |
2010-11-04 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2010-11-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-11-04 | Perforation Treatment Performed - Fractured |
2010-11-05 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2010-11-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-11-05 | Perforation Treatment Performed - Fractured |
2011-02-07 | Well Began Production |
2011-02-07 | Well Fluid changed to Gas |
2011-02-07 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-08-22 | 2059.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-11-01 | Hydra Jet Perforation | 4548.50 | 4549.50 | 3 |
2010-11-02 | Hydra Jet Perforation | 4135.00 | 4136.00 | 3 |
2010-11-02 | Acid Treatment | 4135.00 | 4136.00 | 0 |
2010-11-02 | Fracture | 4135.00 | 4136.00 | 0 |
2010-11-02 | Hydra Jet Perforation | 3997.00 | 3998.00 | 3 |
2010-11-02 | Acid Treatment | 3997.00 | 3998.00 | 0 |
2010-11-02 | Hydra Jet Perforation | 3993.00 | 3996.00 | 3 |
2010-11-02 | Acid Treatment | 3993.00 | 3996.00 | 0 |
2010-11-02 | Fracture | 3993.00 | 3998.00 | 0 |
2010-11-02 | Hydra Jet Perforation | 3855.00 | 3856.00 | 3 |
2010-11-02 | Acid Treatment | 3855.00 | 3856.00 | 0 |
2010-11-01 | Acid Treatment | 4548.50 | 4549.50 | 0 |
2010-11-02 | Fracture | 3855.00 | 3856.00 | 0 |
2010-11-03 | Hydra Jet Perforation | 3708.00 | 3709.00 | 3 |
2010-11-03 | Acid Treatment | 3708.00 | 3709.00 | 0 |
2010-11-03 | Fracture | 3708.00 | 3709.00 | 0 |
2010-11-03 | Hydra Jet Perforation | 3568.00 | 3569.00 | 3 |
2010-11-03 | Acid Treatment | 3568.00 | 3569.00 | 0 |
2010-11-03 | Fracture | 3568.00 | 3569.00 | 0 |
2010-11-03 | Hydra Jet Perforation | 3420.00 | 3421.00 | 3 |
2010-11-03 | Acid Treatment | 3420.00 | 3421.00 | 0 |
2010-11-03 | Fracture | 3420.00 | 3421.00 | 0 |
2010-11-01 | Fracture | 4548.50 | 4549.50 | 0 |
2010-11-03 | Hydra Jet Perforation | 3280.00 | 3281.00 | 3 |
2010-11-03 | Acid Treatment | 3280.00 | 3281.00 | 0 |
2010-11-03 | Fracture | 3280.00 | 3281.00 | 0 |
2010-11-03 | Hydra Jet Perforation | 3140.00 | 3141.00 | 3 |
2010-11-04 | Acid Treatment | 3140.00 | 3141.00 | 0 |
2010-11-04 | Fracture | 3140.00 | 3141.00 | 0 |
2010-11-04 | Hydra Jet Perforation | 2999.00 | 3000.00 | 3 |
2010-11-04 | Acid Treatment | 2999.00 | 3000.00 | 0 |
2010-11-04 | Fracture | 2999.00 | 3000.00 | 0 |
2010-11-04 | Hydra Jet Perforation | 2858.00 | 2859.00 | 3 |
2010-11-01 | Hydra Jet Perforation | 4420.00 | 4421.00 | 3 |
2010-11-04 | Acid Treatment | 2858.00 | 2859.00 | 0 |
2010-11-04 | Fracture | 2858.00 | 2859.00 | 0 |
2010-11-04 | Hydra Jet Perforation | 2720.00 | 2721.00 | 3 |
2010-11-04 | Acid Treatment | 2720.00 | 2721.00 | 0 |
2010-11-04 | Fracture | 2720.00 | 2721.00 | 0 |
2010-11-04 | Hydra Jet Perforation | 2580.00 | 2581.00 | 3 |
2010-11-04 | Acid Treatment | 2580.00 | 2581.00 | 0 |
2010-11-04 | Fracture | 2580.00 | 2581.00 | 0 |
2010-11-05 | Hydra Jet Perforation | 2440.00 | 2441.00 | 3 |
2010-11-05 | Acid Treatment | 2440.00 | 2441.00 | 0 |
2010-11-01 | Acid Treatment | 4420.00 | 4421.00 | 0 |
2010-11-05 | Fracture | 2440.00 | 2441.00 | 0 |
2010-11-01 | Fracture | 4420.00 | 4421.00 | 0 |
2010-11-01 | Hydra Jet Perforation | 4280.00 | 4281.00 | 3 |
2010-11-01 | Acid Treatment | 4280.00 | 4281.00 | 0 |
2010-11-01 | Fracture | 4280.00 | 4281.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 7591 | 0.0 | 0.0 | 0.0 |
2012 | 8668 | 0.0 | 0.0 | 0.0 |
2013 | 8428 | 0.0 | 0.0 | 0.0 |
2014 | 7281 | 0.0 | 0.0 | 0.0 |
2015 | 7485 | 0.0 | 0.0 | 0.0 |
2016 | 7724 | 0.0 | 0.0 | 0.0 |
2017 | 7159 | 0.0 | 0.0 | 0.0 |
2018 | 7855 | 0.0 | 0.0 | 0.0 |
2019 | 5947 | 0.0 | 0.0 | 0.0 |
2020 | 2085 | 0.0 | 0.0 | 0.0 |
For data sources see[6]