X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0766130916000

Well Details

Well ID: 0766130916000
Loading map...
Location: 00/16-09-076-13W6/0
Location Alias: 00/16-09-76-13 W6M
Location Alias 2: 00/16-09-076-13 W6/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 6
Range: 13
Section: 09
County/Municipality: Saddle Hills County
Well Name: AVN HZ GLACIER 16-9-76-13
Operator Name: Advantage Oil & Gas Ltd.
License Number: 0410957
License Date: 2009-06-15
License Status: Issued
Spud Date: 2009-07-29
Final Drill Date: 2009-08-16
Well Total Depth: 4220.00 m
Surface Hole Latitude: 55.582225
Surface Hole Longitude: -119.966907

For data sources see[1][2]

Well History

Date Event
2009-06-15 Obtained License
2009-07-30 Surface Casing Operation Performed
2009-08-05 Direction Drilling Operation Performed - Horizontal
2009-08-16 Finished Drilling
2009-08-16 Well Log Performed
2009-08-16 Well Mode changed to Drilled and Cased
2009-08-18 Well Log Performed
2009-08-19 Production Casing Operation Performed
2009-08-19 Rig Released
2009-10-05 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-10-05 Perforation Treatment Performed - Fractured
2009-10-06 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-10-06 Perforation Treatment Performed - Fractured
2009-10-07 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-10-07 Perforation Treatment Performed - Fractured
2009-10-08 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-10-08 Perforation Treatment Performed - Fractured
2009-10-09 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-10-09 Perforation Treatment Performed - Fractured
2009-10-10 Perforation Treatment Performed - Abrasa-Jet Perforation
2009-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-10-10 Perforation Treatment Performed - Fractured
2009-12-01 Well Began Production
2009-12-01 Well Fluid changed to Gas
2009-12-01 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-08-05 2243.80 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-10-05 Hydra Jet Perforation 4182.00 4183.00 3
2009-10-06 Hydra Jet Perforation 3755.00 3756.00 3
2009-10-06 Acid Treatment 3755.00 3756.00 0
2009-10-06 Fracture 3755.00 3756.00 0
2009-10-06 Hydra Jet Perforation 3610.00 3611.00 3
2009-10-06 Acid Treatment 3610.00 3611.00 0
2009-10-06 Fracture 3610.00 3611.00 0
2009-10-07 Hydra Jet Perforation 3469.00 3470.00 3
2009-10-07 Acid Treatment 3469.00 3470.00 0
2009-10-07 Fracture 3469.00 3470.00 0
2009-10-08 Hydra Jet Perforation 3449.00 3450.00 3
2009-10-05 Acid Treatment 4182.00 4183.00 0
2009-10-08 Acid Treatment 3449.00 3450.00 0
2009-10-08 Fracture 3449.00 3450.00 0
2009-10-08 Hydra Jet Perforation 3300.00 3301.00 3
2009-10-08 Acid Treatment 3300.00 3301.00 0
2009-10-08 Fracture 3300.00 3301.00 0
2009-10-08 Hydra Jet Perforation 3155.00 3156.00 3
2009-10-08 Acid Treatment 3155.00 3156.00 0
2009-10-09 Hydra Jet Perforation 3145.00 3146.00 3
2009-10-09 Acid Treatment 3145.00 3146.00 0
2009-10-09 Fracture 3145.00 3146.00 0
2009-10-05 Fracture 4182.00 4183.00 0
2009-10-09 Hydra Jet Perforation 2989.00 2990.00 3
2009-10-09 Acid Treatment 2989.00 2990.00 0
2009-10-09 Fracture 2989.00 2990.00 0
2009-10-10 Hydra Jet Perforation 2840.00 2841.00 3
2009-10-10 Acid Treatment 2840.00 2841.00 0
2009-10-10 Fracture 2840.00 2841.00 0
2009-10-10 Hydra Jet Perforation 2667.00 2668.00 3
2009-10-10 Acid Treatment 2667.00 2668.00 0
2009-10-10 Fracture 2667.00 2668.00 0
2009-10-05 Hydra Jet Perforation 4045.00 4046.00 3
2009-10-05 Acid Treatment 4045.00 4046.00 0
2009-10-05 Fracture 4045.00 4046.00 0
2009-10-06 Hydra Jet Perforation 3905.00 3906.00 3
2009-10-06 Acid Treatment 3905.00 3906.00 0
2009-10-06 Fracture 3905.00 3906.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 586 0.0 0.0 0.0
2010 7782 0.0 0.0 0.0
2011 7202 0.0 0.0 0.0
2012 8482 0.0 0.0 0.0
2013 6963 0.0 0.0 0.0
2014 4896 0.0 0.0 0.0
2015 1891 0.0 0.0 0.0
2016 6841 0.0 0.0 0.0
2017 4489 0.0 0.0 0.0
2018 3502 0.0 0.0 0.0
2019 4851 0.0 0.0 0.0
2020 2073 0.0 0.0 0.0

For data sources see[6]

References