X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0766130616000

Well Details

Well ID: 0766130616000
Loading map...
Location: 00/16-06-076-13W6/0
Location Alias: 00/16-06-76-13 W6M
Location Alias 2: 00/16-06-076-13 W6/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 6
Range: 13
Section: 06
County/Municipality: Saddle Hills County
Well Name: AVN HZ GLACIER 16-6-76-13
Operator Name: Advantage Oil & Gas Ltd.
License Number: 0411321
License Date: 2009-07-07
License Status: Amended
Spud Date: 2009-11-28
Final Drill Date: 2009-12-17
Well Total Depth: 3675.00 m
Surface Hole Latitude: 55.557973
Surface Hole Longitude: -119.980520

For data sources see[1][2]

Well History

Date Event
2009-07-07 Obtained License
2009-11-30 Surface Casing Operation Performed
2009-12-09 Direction Drilling Operation Performed - Horizontal
2009-12-14 Well Log Performed
2009-12-17 Finished Drilling
2009-12-17 Well Log Performed
2009-12-17 Well Mode changed to Drilled and Cased
2009-12-20 Well Log Performed
2009-12-21 Production Casing Operation Performed
2009-12-21 Rig Released
2010-02-26 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-02-26 Perforation Treatment Performed - Fractured
2010-02-27 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-02-27 Perforation Treatment Performed - Fractured
2010-02-28 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-02-28 Perforation Treatment Performed - Fractured
2010-03-01 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-03-01 Perforation Treatment Performed - Fractured
2010-05-18 Well Began Production
2010-05-18 Well Fluid changed to Gas
2010-05-18 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-12-09 2363.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-26 Hydra Jet Perforation 3643.00 3644.00 3
2010-02-27 Hydra Jet Perforation 3279.00 3283.00 3
2010-02-27 Acid Treatment 3279.00 3283.00 0
2010-02-28 Fracture 3279.00 3283.00 0
2010-02-28 Hydra Jet Perforation 3116.00 3123.00 3
2010-02-28 Acid Treatment 3116.00 3123.00 0
2010-02-28 Fracture 3116.00 3123.00 0
2010-02-28 Hydra Jet Perforation 3015.50 3017.50 3
2010-02-28 Acid Treatment 3015.50 3017.50 0
2010-03-01 Fracture 3015.50 3017.50 0
2010-03-01 Hydra Jet Perforation 2899.00 2903.00 3
2010-02-26 Acid Treatment 3643.00 3644.00 0
2010-03-01 Acid Treatment 2899.00 2903.00 0
2010-03-01 Fracture 2899.00 2903.00 0
2010-03-01 Hydra Jet Perforation 2770.00 2776.00 3
2010-03-01 Acid Treatment 2770.00 2776.00 0
2010-03-01 Fracture 2770.00 2776.00 0
2010-02-26 Fracture 3643.00 3644.00 0
2010-02-26 Hydra Jet Perforation 3527.00 3528.00 3
2010-02-26 Acid Treatment 3527.00 3528.00 0
2010-02-26 Fracture 3527.00 3528.00 0
2010-02-27 Hydra Jet Perforation 3398.00 3403.00 3
2010-02-27 Acid Treatment 3398.00 3403.00 0
2010-02-27 Fracture 3398.00 3403.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 5219 0.0 0.0 0.0
2011 8445 0.0 0.0 0.0
2012 8201 0.0 0.0 0.0
2013 7321 0.0 0.0 0.0
2014 6961 0.0 0.0 0.0
2015 4412 0.0 0.0 0.0
2016 6764 0.0 0.0 0.0
2017 4516 0.0 0.0 0.0
2018 4018 0.0 0.0 0.0
2019 6060 0.0 0.0 0.0
2020 1670 0.0 0.0 0.0

For data sources see[6]

References