If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0766130601020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.541512,"lon":-119.963909,"icon":""}]} |
Location: 02/01-06-076-13W6/0 | |
Location Alias: 02/01-06-76-13 W6M | |
Location Alias 2: 02/01-06-076-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 6 | |
Range: 13 | |
Section: 06 | |
County/Municipality: Saddle Hills County | |
Well Name: AVN 102 HZ GLACIER 1-6-76-13 | |
Operator Name: Advantage Oil & Gas Ltd. | |
License Number: 0422168 | |
License Date: 2010-07-27 | |
License Status: Issued | |
Spud Date: 2010-09-18 | |
Final Drill Date: 2010-10-05 | |
Well Total Depth: 4922.00 m | |
Surface Hole Latitude: 55.541512 | |
Surface Hole Longitude: -119.963909 |
Date | Event |
---|---|
2010-07-27 | Obtained License |
2010-09-18 | Well Log Performed |
2010-09-19 | Surface Casing Operation Performed |
2010-09-23 | Direction Drilling Operation Performed - Horizontal |
2010-09-24 | Well Log Performed |
2010-10-05 | Finished Drilling |
2010-10-05 | Well Mode changed to Drilled and Cased |
2010-10-07 | Well Log Performed |
2010-10-08 | Production Casing Operation Performed |
2010-10-09 | Rig Released |
2011-02-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-02-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-02-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-02-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-02-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-02-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-02-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-02-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-02-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-02-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-02-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-02-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-02-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-02-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-05-30 | Well Began Production |
2011-05-30 | Well Fluid changed to Gas |
2011-05-30 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-09-23 | 2327.60 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-21 | Multi-Stage Fracture | 4903.00 | 4905.00 | 0 |
2011-02-24 | Acid Treatment | 4365.00 | 4382.00 | 0 |
2011-02-24 | Multi-Stage Fracture | 4205.00 | 4215.00 | 0 |
2011-02-24 | Acid Treatment | 4205.00 | 4215.00 | 0 |
2011-02-24 | Multi-Stage Fracture | 4062.00 | 4069.00 | 0 |
2011-02-24 | Acid Treatment | 4062.00 | 4069.00 | 0 |
2011-02-24 | Multi-Stage Fracture | 3895.00 | 3917.00 | 0 |
2011-02-24 | Acid Treatment | 3895.00 | 3917.00 | 0 |
2011-02-24 | Multi-Stage Fracture | 3893.00 | 3896.00 | 0 |
2011-02-25 | Acid Treatment | 3893.00 | 3896.00 | 0 |
2011-02-25 | Multi-Stage Fracture | 3780.00 | 3790.00 | 0 |
2011-02-21 | Acid Treatment | 4903.00 | 4905.00 | 0 |
2011-02-25 | Acid Treatment | 3780.00 | 3790.00 | 0 |
2011-02-25 | Multi-Stage Fracture | 3642.00 | 3665.00 | 0 |
2011-02-25 | Acid Treatment | 3642.00 | 3665.00 | 0 |
2011-02-25 | Multi-Stage Fracture | 3510.00 | 3520.00 | 0 |
2011-02-25 | Acid Treatment | 3510.00 | 3520.00 | 0 |
2011-02-26 | Multi-Stage Fracture | 3351.00 | 3362.00 | 0 |
2011-02-26 | Acid Treatment | 3351.00 | 3362.00 | 0 |
2011-02-26 | Multi-Stage Fracture | 3215.00 | 3230.00 | 0 |
2011-02-26 | Acid Treatment | 3215.00 | 3230.00 | 0 |
2011-02-26 | Multi-Stage Fracture | 3080.00 | 3099.00 | 0 |
2011-02-22 | Multi-Stage Fracture | 4796.00 | 4803.00 | 0 |
2011-02-26 | Acid Treatment | 3080.00 | 3099.00 | 0 |
2011-02-26 | Multi-Stage Fracture | 2949.00 | 2955.00 | 0 |
2011-02-26 | Acid Treatment | 2949.00 | 2955.00 | 0 |
2011-02-27 | Multi-Stage Fracture | 2800.00 | 2810.00 | 0 |
2011-02-27 | Acid Treatment | 2800.00 | 2810.00 | 0 |
2011-02-22 | Acid Treatment | 4796.00 | 4803.00 | 0 |
2011-02-23 | Multi-Stage Fracture | 4684.00 | 4692.00 | 0 |
2011-02-23 | Acid Treatment | 4684.00 | 4692.00 | 0 |
2011-02-23 | Multi-Stage Fracture | 4531.00 | 4542.00 | 0 |
2011-02-23 | Acid Treatment | 4531.00 | 4542.00 | 0 |
2011-02-23 | Multi-Stage Fracture | 4365.00 | 4382.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 5076 | 0.0 | 0.0 | 0.0 |
2012 | 8016 | 0.0 | 0.0 | 0.0 |
2013 | 7734 | 0.0 | 0.0 | 0.0 |
2014 | 7853 | 0.0 | 0.0 | 0.0 |
2015 | 7042 | 0.0 | 0.0 | 0.0 |
2016 | 6577 | 0.0 | 0.0 | 0.0 |
2017 | 7670 | 0.0 | 0.0 | 0.0 |
2018 | 6867 | 0.0 | 0.0 | 0.0 |
2019 | 8339 | 0.0 | 0.0 | 0.0 |
2020 | 2053 | 0.0 | 0.0 | 0.0 |
For data sources see[6]