If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0766130511000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.542124,"lon":-119.962649,"icon":""}]} |
Location: 00/11-05-076-13W6/0 | |
Location Alias: 00/11-05-76-13 W6M | |
Location Alias 2: 00/11-05-076-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 6 | |
Range: 13 | |
Section: 05 | |
County/Municipality: Saddle Hills County | |
Well Name: AVN HZ GLACIER 11-5-76-13 | |
Operator Name: Advantage Oil & Gas Ltd. | |
License Number: 0470605 | |
License Date: 2014-10-14 | |
License Status: Issued | |
Spud Date: 2015-01-31 | |
Final Drill Date: 2015-02-17 | |
Well Total Depth: 4690.00 m | |
Surface Hole Latitude: 55.542124 | |
Surface Hole Longitude: -119.962649 |
Date | Event |
---|---|
2014-10-14 | Obtained License |
2015-02-01 | Surface Casing Operation Performed |
2015-02-06 | Direction Drilling Operation Performed - Deviate |
2015-02-12 | Direction Drilling Operation Performed - Horizontal |
2015-02-14 | Well Log Performed |
2015-02-17 | Finished Drilling |
2015-02-17 | Well Log Performed |
2015-02-17 | Well Mode changed to Drilled and Cased |
2015-02-19 | Production Casing Operation Performed |
2015-02-20 | Rig Released |
2015-09-24 | Perforation Treatment Performed - Open-Hole Completion |
2015-09-24 | Well Log Performed |
2016-01-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-01-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-01-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-02-07 | Well Log Performed |
2016-02-14 | Well Log Performed |
2016-10-24 | Well Began Production |
2016-10-24 | Well Fluid changed to Gas |
2016-10-24 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-01-31 | Horizon Drilling Inc. | 45 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-02-06 | 2227.40 | Deviate (5 - 79 degrees) |
2015-02-12 | 3133.40 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-09-24 | Open Hole/Barefoot Completion | 4668.00 | 4690.00 | 0 |
2016-01-24 | Multi-Stage Fracture | 3966.50 | 3966.60 | 0 |
2016-01-25 | Multi-Stage Fracture | 3883.40 | 3883.50 | 0 |
2016-01-25 | Multi-Stage Fracture | 3787.40 | 3787.50 | 0 |
2016-01-25 | Multi-Stage Fracture | 3704.50 | 3704.60 | 0 |
2016-01-25 | Multi-Stage Fracture | 3621.20 | 3621.30 | 0 |
2016-01-25 | Multi-Stage Fracture | 3526.00 | 3526.10 | 0 |
2016-01-25 | Multi-Stage Fracture | 3442.70 | 3442.80 | 0 |
2016-01-25 | Multi-Stage Fracture | 3346.90 | 3347.00 | 0 |
2016-01-23 | Multi-Stage Fracture | 4656.60 | 4656.70 | 0 |
2016-01-23 | Multi-Stage Fracture | 4582.40 | 4582.50 | 0 |
2016-01-23 | Multi-Stage Fracture | 4512.10 | 4512.20 | 0 |
2016-01-24 | Multi-Stage Fracture | 4404.30 | 4404.40 | 0 |
2016-01-24 | Multi-Stage Fracture | 4321.90 | 4322.00 | 0 |
2016-01-24 | Multi-Stage Fracture | 4238.50 | 4238.60 | 0 |
2016-01-24 | Multi-Stage Fracture | 4143.40 | 4143.50 | 0 |
2016-01-24 | Multi-Stage Fracture | 4060.70 | 4060.80 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-01-23 | 2016-01-25 | 2,643 | 4,430 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Chlorine dioxide | 10049-04-4 | 100 | 78.4 | N/A | |||
Water | Not Available | 100 | 78.3638 | N/A | ||||
FRAC SAND. 30/50 WHITE | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 9.1277 | N/A | ||
FRAC SAND. 40/70 WHITE | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 5.0456 | N/A | ||
2K7 Solution W-M | Baker Hughes | Bactericide/Biocide | 2-Bromo-2-nitropropane-1.3-diol | 52-51-7 | 100 | 0.0027 | N/A | |
Methanol | 67-56-1 | 100 | 0.0027 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0027 | N/A | ||||
Breaker HP | Baker Hughes | Breaker | Ethylene glycol | 107-21-1 | 100 | 0.0834 | N/A | |
Non-hazardous | Not Available | 100 | 0.0834 | N/A | ||||
tert-Butyl hydroperoxide | 75-91-2 | 100 | 0.0834 | N/A | ||||
Breaker N | Baker Hughes | Breaker | Sodium persulphate | 7775-27-1 | 100 | 0.0017 | N/A | |
BF-7L | Baker Hughes | Buffer | Non-hazardous | Not Available | 100 | 0.0222 | N/A | |
Potassium carbonate | 584-08-7 | 100 | 0.0222 | N/A | ||||
CC-2 | Baker Hughes | Clay Control | Non-hazardous | Not Available | 100 | 0.1719 | N/A | |
CXB-2 | Baker Hughes | Crosslinker | Methanol | 67-56-1 | 100 | 0.092 | N/A | |
Non-hazardous | Not Available | 100 | 0.092 | N/A | ||||
Sodium borate | 7775-19-1 | 100 | 0.092 | N/A | ||||
Sodium hydroxide | 1310-73-2 | 100 | 0.092 | N/A | ||||
NE-118 | Baker Hughes | Demulsifier | 1.2.4-Trimethyl benzene | 95-63-6 | 100 | 0.0129 | N/A | |
1.3.5-Trimethyl benzene | 108-67-8 | 100 | 0.0129 | N/A | ||||
Ethoxylated alcohols. C6-C12 | 68439-45-2 | 100 | 0.0129 | N/A | ||||
Isopropanol | 67-63-0 | 100 | 0.0129 | N/A | ||||
Light aromatic solvent naphtha | 64742-95-6 | 100 | 0.0129 | N/A | ||||
Oxyalkylated phenolic resin | 63428-92-2 | 100 | 0.0129 | N/A | ||||
Xylene | 1330-20-7 | 100 | 0.0129 | N/A | ||||
Nitrogen | Baker Hughes | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 6.8039 | N/A | |
MaxPerm-20A | Baker Hughes | Friction Reducer | Non-hazardous | 9014 | 100 | 0.0676 | N/A | |
Oxyalkylated alcohol | 9014 | 100 | 0.0676 | N/A | ||||
Petroleum distillates | 64742-47-8 | 100 | 0.0676 | N/A | ||||
Polyacrylate | 9014 | 100 | 0.0676 | N/A | ||||
GW-4 | Baker Hughes | Gelling Agent | Guar gum | 9000-30-0 | 100 | 0.0504 | N/A | |
InFlo 200 | Baker Hughes | Surfactant | Alcohol | 8648 | 100 | 0.1535 | N/A | |
Alkyl alkoxylate | 8648 | 100 | 0.1535 | N/A | ||||
Glycol | 8648 | 100 | 0.1535 | N/A | ||||
Terpene | 8648 | 100 | 0.1535 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2015-09-24 | 2015-09-24 | Central Water Distribution Facility | 34 |
2015-09-25 | 2015-09-25 | Central Water Distribution Facility | 30 |
2016-01-21 | 2016-01-25 | Surface Water - Lake | 4110 |
2016-01-21 | 2016-01-21 | Municipal Water | 834 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2016 | 1578 | 0.0 | 0.0 | 0.0 |
2017 | 8152 | 0.0 | 0.0 | 0.0 |
2018 | 7345 | 0.0 | 0.0 | 0.0 |
2019 | 6063 | 0.0 | 0.0 | 0.0 |
2020 | 2002 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-01-31 | No Incident Encountered | 0.00 | 0.00 |
2016-02-08 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]