If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0766122912000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/12-29-076-12W6/0 | |
Location Alias: 00/12-29-76-12 W6M | |
Location Alias 2: 00/12-29-076-12 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 6 | |
Range: 12 | |
Section: 29 | |
County/Municipality: Saddle Hills County | |
Well Name: AVN HZ GLACIER 12-29-76-12 | |
Operator Name: Advantage Oil & Gas Ltd. | |
License Number: 0421509 | |
License Date: 2010-06-30 | |
License Status: Amended | |
Spud Date: 2010-09-06 | |
Final Drill Date: 2010-09-21 | |
Well Total Depth: 3897.00 m | |
Surface Hole Latitude: 55.608587 | |
Surface Hole Longitude: -119.811274 |
Date | Event |
---|---|
2010-06-30 | Obtained License |
2010-09-07 | Well Log Performed |
2010-09-11 | Surface Casing Operation Performed |
2010-09-12 | Direction Drilling Operation Performed - Horizontal |
2010-09-21 | Finished Drilling |
2010-09-21 | Well Mode changed to Drilled and Cased |
2010-09-23 | Production Casing Operation Performed |
2010-09-23 | Rig Released |
2010-12-03 | Well Log Performed |
2010-12-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-12-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-12-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-12-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2010-12-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-12-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-03-21 | Well Began Production |
2011-03-21 | Well Fluid changed to Gas |
2011-03-21 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-09-12 | 1935.20 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-12-10 | Multi-Stage Fracture | 3834.00 | 3835.00 | 0 |
2010-12-11 | Acid Treatment | 3259.00 | 3260.00 | 0 |
2010-12-11 | Multi-Stage Fracture | 3119.00 | 3120.00 | 0 |
2010-12-11 | Acid Treatment | 3119.00 | 3120.00 | 0 |
2010-12-11 | Multi-Stage Fracture | 2979.00 | 2980.00 | 0 |
2010-12-11 | Acid Treatment | 2979.00 | 2980.00 | 0 |
2010-12-11 | Multi-Stage Fracture | 2839.00 | 2840.00 | 0 |
2010-12-11 | Acid Treatment | 2839.00 | 2840.00 | 0 |
2010-12-12 | Multi-Stage Fracture | 2699.00 | 2700.00 | 0 |
2010-12-12 | Acid Treatment | 2699.00 | 2700.00 | 0 |
2010-12-12 | Multi-Stage Fracture | 2559.00 | 2560.00 | 0 |
2010-12-10 | Acid Treatment | 3834.00 | 3835.00 | 0 |
2010-12-12 | Acid Treatment | 2559.00 | 2560.00 | 0 |
2010-12-12 | Multi-Stage Fracture | 2419.00 | 2420.00 | 0 |
2010-12-12 | Acid Treatment | 2419.00 | 2420.00 | 0 |
2010-12-12 | Multi-Stage Fracture | 2289.00 | 2290.00 | 0 |
2010-12-12 | Acid Treatment | 2289.00 | 2290.00 | 0 |
2010-12-10 | Multi-Stage Fracture | 3679.00 | 3680.00 | 0 |
2010-12-10 | Acid Treatment | 3679.00 | 3680.00 | 0 |
2010-12-10 | Multi-Stage Fracture | 3539.00 | 3540.00 | 0 |
2010-12-10 | Acid Treatment | 3539.00 | 3540.00 | 0 |
2010-12-11 | Multi-Stage Fracture | 3399.00 | 3400.00 | 0 |
2010-12-11 | Acid Treatment | 3399.00 | 3400.00 | 0 |
2010-12-11 | Multi-Stage Fracture | 3259.00 | 3260.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 6785 | 0.0 | 0.0 | 0.0 |
2012 | 8525 | 0.0 | 0.0 | 0.0 |
2013 | 8322 | 0.0 | 0.0 | 0.0 |
2014 | 8019 | 0.0 | 0.0 | 0.0 |
2015 | 7586 | 0.0 | 0.0 | 0.0 |
2016 | 7605 | 0.0 | 0.0 | 0.0 |
2017 | 7523 | 0.0 | 0.0 | 0.0 |
2018 | 7577 | 0.0 | 0.0 | 0.0 |
2019 | 7068 | 0.0 | 0.0 | 0.0 |
2020 | 2148 | 0.0 | 0.0 | 0.0 |
For data sources see[6]