If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0766122809000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.626777,"lon":-119.808775,"icon":""}]} |
Location: 00/09-28-076-12W6/0 | |
Location Alias: 00/09-28-76-12 W6M | |
Location Alias 2: 00/09-28-076-12 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 6 | |
Range: 12 | |
Section: 28 | |
County/Municipality: Saddle Hills County | |
Well Name: AVN HZ GLACIER 9-28-76-12 | |
Operator Name: Advantage Oil & Gas Ltd. | |
License Number: 0423821 | |
License Date: 2010-09-24 | |
License Status: Amended | |
Spud Date: 2010-11-28 | |
Final Drill Date: 2010-12-17 | |
Well Total Depth: 4227.00 m | |
Surface Hole Latitude: 55.626777 | |
Surface Hole Longitude: -119.808775 |
Date | Event |
---|---|
2010-09-24 | Obtained License |
2010-11-30 | Surface Casing Operation Performed |
2010-12-05 | Direction Drilling Operation Performed - Horizontal |
2010-12-05 | Well Log Performed |
2010-12-17 | Finished Drilling |
2010-12-17 | Well Log Performed |
2010-12-17 | Well Mode changed to Drilled and Cased |
2010-12-19 | Production Casing Operation Performed |
2010-12-19 | Well Log Performed |
2010-12-20 | Rig Released |
2011-01-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-01-31 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-02-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-02-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-02-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-02-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-02-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-02-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-03-29 | Well Began Production |
2011-03-29 | Well Fluid changed to Gas |
2011-03-29 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-12-05 | 1963.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-01-31 | Multi-Stage Fracture | 4205.00 | 4215.00 | 0 |
2011-02-01 | Acid Treatment | 3645.00 | 3646.00 | 0 |
2011-02-01 | Multi-Stage Fracture | 3505.00 | 3506.00 | 0 |
2011-02-01 | Acid Treatment | 3505.00 | 3506.00 | 0 |
2011-02-02 | Multi-Stage Fracture | 3368.00 | 3369.00 | 0 |
2011-02-02 | Acid Treatment | 3368.00 | 3369.00 | 0 |
2011-02-02 | Multi-Stage Fracture | 3225.00 | 3226.00 | 0 |
2011-02-02 | Acid Treatment | 3225.00 | 3226.00 | 0 |
2011-02-02 | Multi-Stage Fracture | 3079.00 | 3080.00 | 0 |
2011-02-02 | Acid Treatment | 3079.00 | 3080.00 | 0 |
2011-02-02 | Multi-Stage Fracture | 2939.00 | 2940.00 | 0 |
2011-01-31 | Acid Treatment | 4205.00 | 4215.00 | 0 |
2011-02-02 | Acid Treatment | 2939.00 | 2940.00 | 0 |
2011-02-02 | Multi-Stage Fracture | 2805.00 | 2806.00 | 0 |
2011-02-03 | Acid Treatment | 2805.00 | 2806.00 | 0 |
2011-02-03 | Multi-Stage Fracture | 2659.00 | 2660.00 | 0 |
2011-02-03 | Acid Treatment | 2659.00 | 2660.00 | 0 |
2011-02-03 | Multi-Stage Fracture | 2525.00 | 2526.00 | 0 |
2011-02-03 | Acid Treatment | 2525.00 | 2526.00 | 0 |
2011-02-03 | Multi-Stage Fracture | 2377.00 | 2378.00 | 0 |
2011-02-03 | Acid Treatment | 2377.00 | 2378.00 | 0 |
2011-01-31 | Multi-Stage Fracture | 4065.00 | 4066.00 | 0 |
2011-01-31 | Acid Treatment | 4065.00 | 4066.00 | 0 |
2011-02-01 | Multi-Stage Fracture | 3925.00 | 3926.00 | 0 |
2011-02-01 | Acid Treatment | 3925.00 | 3926.00 | 0 |
2011-02-01 | Multi-Stage Fracture | 3785.00 | 3786.00 | 0 |
2011-02-01 | Acid Treatment | 3785.00 | 3786.00 | 0 |
2011-02-01 | Multi-Stage Fracture | 3645.00 | 3646.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 6571 | 0.0 | 0.0 | 0.0 |
2012 | 8372 | 0.0 | 0.0 | 0.0 |
2013 | 8628 | 0.0 | 0.0 | 0.0 |
2014 | 3184 | 0.0 | 0.0 | 0.0 |
2015 | 3450 | 0.0 | 0.0 | 0.0 |
2016 | 7315 | 0.0 | 0.0 | 0.0 |
2017 | 7554 | 0.0 | 0.0 | 0.0 |
2018 | 6834 | 0.0 | 0.0 | 0.0 |
2019 | 6164 | 0.0 | 0.0 | 0.0 |
2020 | 2032 | 0.0 | 0.0 | 0.0 |
For data sources see[6]