If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0766122401000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.608198,"lon":-119.731202,"icon":""}]} |
Location: 00/01-24-076-12W6/0 | |
Location Alias: 00/01-24-76-12 W6M | |
Location Alias 2: 00/01-24-076-12 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 6 | |
Range: 12 | |
Section: 24 | |
County/Municipality: Saddle Hills County | |
Well Name: Canlin PCOUPES 1-24-76-12 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0422518 | |
License Date: 2010-08-10 | |
License Status: Issued | |
Spud Date: 2010-10-11 | |
Final Drill Date: 2010-11-02 | |
Well Total Depth: 4110.00 m | |
Surface Hole Latitude: 55.608198 | |
Surface Hole Longitude: -119.731202 |
Date | Event |
---|---|
2010-08-10 | Obtained License |
2010-10-11 | Well Log Performed |
2010-10-12 | Surface Casing Operation Performed |
2010-10-12 | Well Log Performed |
2010-10-18 | Direction Drilling Operation Performed - Deviate |
2010-10-21 | Direction Drilling Operation Performed - Horizontal |
2010-10-25 | Well Log Performed |
2010-11-02 | Finished Drilling |
2010-11-02 | Well Log Performed |
2010-11-02 | Well Mode changed to Drilled and Cased |
2010-11-04 | Production Casing Operation Performed |
2010-11-05 | Rig Released |
2010-12-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-03-01 | Well Began Production |
2011-03-01 | Well Fluid changed to Gas |
2011-03-01 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-10-18 | 1839.30 | Deviate (5 - 79 degrees) |
2010-10-21 | 2329.10 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-12-17 | Multi-Stage Fracture | 2577.60 | 4110.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 6368 | 0.0 | 0.0 | 0.0 |
2012 | 8091 | 0.0 | 0.0 | 0.0 |
2013 | 8463 | 0.0 | 0.0 | 0.0 |
2014 | 7789 | 0.0 | 0.0 | 0.0 |
2015 | 7926 | 0.0 | 0.0 | 0.0 |
2016 | 7454 | 0.0 | 0.0 | 0.0 |
2017 | 6667 | 0.0 | 0.0 | 0.0 |
2018 | 8111 | 0.0 | 0.0 | 0.0 |
2019 | 8159 | 0.0 | 0.0 | 0.0 |
2020 | 2159 | 0.0 | 0.0 | 0.0 |
For data sources see[6]