X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0766120909000

Well Details

Well ID: 0766120909000
Loading map...
Location: 00/09-09-076-12W6/0
Location Alias: 00/09-09-76-12 W6M
Location Alias 2: 00/09-09-076-12 W6/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 6
Range: 12
Section: 09
County/Municipality: Saddle Hills County
Well Name: AVN HZ GLACIER 9-9-76-12
Operator Name: Advantage Oil & Gas Ltd.
License Number: 0435905
License Date: 2011-08-10
License Status: Issued
Spud Date: 2011-11-01
Final Drill Date: 2011-11-24
Well Total Depth: 4670.00 m
Surface Hole Latitude: 55.562233
Surface Hole Longitude: -119.760327

For data sources see[1][2]

Well History

Date Event
2011-08-10 Obtained License
2011-11-03 Surface Casing Operation Performed
2011-11-08 Direction Drilling Operation Performed - Horizontal
2011-11-24 Finished Drilling
2011-11-24 Well Mode changed to Drilled and Cased
2011-11-25 Production Casing Operation Performed
2011-11-25 Well Log Performed
2011-11-26 Rig Released
2012-01-02 Well Log Performed
2012-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-01-11 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-01-12 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-01-13 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-01-14 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-01-15 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-01-17 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-01-18 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-01-19 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-01-20 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-24 Well Began Production
2012-03-24 Well Fluid changed to Gas
2012-03-24 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-08 2241.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-11 Multi-Stage Fracture 4654.00 4655.00 0
2012-01-13 Multi-Stage Fracture 4170.00 4171.00 0
2012-01-13 Acid Treatment 4170.00 4171.00 0
2012-01-13 Multi-Stage Fracture 4049.00 4050.00 0
2012-01-13 Acid Treatment 4049.00 4050.00 0
2012-01-14 Multi-Stage Fracture 3928.00 3929.00 0
2012-01-14 Acid Treatment 3928.00 3929.00 0
2012-01-15 Multi-Stage Fracture 3807.00 3808.00 0
2012-01-15 Multi-Stage Fracture 3798.00 3802.00 0
2012-01-15 Acid Treatment 3798.00 3808.00 0
2012-01-15 Multi-Stage Fracture 3686.00 3687.00 0
2012-01-11 Acid Treatment 4654.00 4655.00 0
2012-01-16 Acid Treatment 3686.00 3687.00 0
2012-01-17 Multi-Stage Fracture 3565.00 3566.00 0
2012-01-17 Acid Treatment 3565.00 3566.00 0
2012-01-18 Multi-Stage Fracture 3444.00 3445.00 0
2012-01-18 Acid Treatment 3444.00 3445.00 0
2012-01-18 Multi-Stage Fracture 3323.00 3324.00 0
2012-01-18 Multi-Stage Fracture 3302.00 3306.00 0
2012-01-18 Acid Treatment 3302.00 3324.00 0
2012-01-19 Multi-Stage Fracture 3202.00 3203.00 0
2012-01-19 Acid Treatment 3202.00 3203.00 0
2012-01-12 Multi-Stage Fracture 4533.00 4534.00 0
2012-01-19 Multi-Stage Fracture 3081.00 3082.00 0
2012-01-19 Acid Treatment 3081.00 3082.00 0
2012-01-19 Multi-Stage Fracture 2960.00 2961.00 0
2012-01-19 Acid Treatment 2960.00 2961.00 0
2012-01-20 Multi-Stage Fracture 2839.00 2840.00 0
2012-01-20 Acid Treatment 2839.00 2840.00 0
2012-01-20 Multi-Stage Fracture 2718.00 2719.00 0
2012-01-20 Acid Treatment 2718.00 2719.00 0
2012-01-20 Multi-Stage Fracture 2539.00 2540.00 0
2012-01-20 Acid Treatment 2539.00 2540.00 0
2012-01-12 Acid Treatment 4533.00 4534.00 0
2012-01-12 Multi-Stage Fracture 4412.00 4413.00 0
2012-01-12 Multi-Stage Fracture 4402.00 4406.00 0
2012-01-12 Acid Treatment 4402.00 4413.00 0
2012-01-13 Multi-Stage Fracture 4291.00 4292.00 0
2012-01-13 Acid Treatment 4291.00 4292.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6751 0.0 0.0 0.0
2013 8724 0.0 0.0 0.0
2014 7701 0.0 0.0 0.0
2015 5383 0.0 0.0 0.0
2016 5122 0.0 0.0 0.0
2017 5329 0.0 0.0 0.0
2018 6487 0.0 0.0 0.0
2019 3479 0.0 0.0 0.0
2020 2164 0.0 0.0 0.0

For data sources see[6]

References