X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0766120901030

Well Details

Well ID: 0766120901030
Loading map...
Location: 03/01-09-076-12W6/0
Location Alias: 03/01-09-76-12 W6M
Location Alias 2: 03/01-09-076-12 W6/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 6
Range: 12
Section: 09
County/Municipality: Saddle Hills County
Well Name: AVN 103 HZ GLACIER 1-9-76-12
Operator Name: Advantage Oil & Gas Ltd.
License Number: 0438528
License Date: 2011-11-04
License Status: Issued
Spud Date: 2011-11-28
Final Drill Date: 2011-12-19
Well Total Depth: 4778.00 m
Surface Hole Latitude: 55.578419
Surface Hole Longitude: -119.811732

For data sources see[1][2]

Well History

Date Event
2011-11-04 Obtained License
2011-12-01 Surface Casing Operation Performed
2011-12-06 Direction Drilling Operation Performed - Horizontal
2011-12-19 Finished Drilling
2011-12-19 Production Casing Operation Performed
2011-12-19 Well Log Performed
2011-12-19 Well Mode changed to Drilled and Cased
2011-12-22 Rig Released
2012-01-21 Well Log Performed
2013-02-11 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-20 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-22 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-23 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-24 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-25 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-26 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-27 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-28 Perforation Treatment Performed - Multi-Stage Fracture
2013-04-16 Well Began Production
2013-04-16 Well Fluid changed to Gas
2013-04-16 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-06 2287.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-02-11 Multi-Stage Fracture 4760.00 4761.00 0
2013-02-23 Multi-Stage Fracture 4310.00 4311.00 0
2013-02-23 Multi-Stage Fracture 4260.00 4261.00 0
2013-02-23 Multi-Stage Fracture 4210.00 4211.00 0
2013-02-23 Multi-Stage Fracture 4160.00 4161.00 0
2013-02-23 Multi-Stage Fracture 4110.00 4111.00 0
2013-02-23 Multi-Stage Fracture 4060.00 4061.00 0
2013-02-24 Multi-Stage Fracture 4010.00 4011.00 0
2013-02-24 Multi-Stage Fracture 3960.00 3961.00 0
2013-02-24 Multi-Stage Fracture 3910.00 3911.00 0
2013-02-24 Multi-Stage Fracture 3860.00 3861.00 0
2013-02-11 Multi-Stage Fracture 4710.00 4711.00 0
2013-02-24 Multi-Stage Fracture 3810.00 3811.00 0
2013-02-24 Multi-Stage Fracture 3760.00 3761.00 0
2013-02-25 Multi-Stage Fracture 3710.00 3711.00 0
2013-02-25 Multi-Stage Fracture 3660.00 3661.00 0
2013-02-25 Multi-Stage Fracture 3610.00 3611.00 0
2013-02-25 Multi-Stage Fracture 3560.00 3561.00 0
2013-02-25 Multi-Stage Fracture 3510.00 3511.00 0
2013-02-25 Multi-Stage Fracture 3460.00 3461.00 0
2013-02-25 Multi-Stage Fracture 3410.00 3411.00 0
2013-02-25 Multi-Stage Fracture 3360.00 3361.00 0
2013-02-11 Multi-Stage Fracture 4660.00 4661.00 0
2013-02-25 Multi-Stage Fracture 3310.00 3311.00 0
2013-02-26 Multi-Stage Fracture 3260.00 3261.00 0
2013-02-26 Multi-Stage Fracture 3210.00 3211.00 0
2013-02-26 Multi-Stage Fracture 3160.00 3161.00 0
2013-02-27 Multi-Stage Fracture 3110.00 3111.00 0
2013-02-27 Multi-Stage Fracture 3060.00 3061.00 0
2013-02-27 Multi-Stage Fracture 3010.00 3011.00 0
2013-02-28 Multi-Stage Fracture 2960.00 2961.00 0
2013-02-28 Multi-Stage Fracture 2910.00 2911.00 0
2013-02-28 Multi-Stage Fracture 2860.00 2861.00 0
2013-02-20 Multi-Stage Fracture 4610.00 4611.00 0
2013-02-28 Multi-Stage Fracture 2810.00 2811.00 0
2013-02-28 Multi-Stage Fracture 2760.00 2761.00 0
2013-02-28 Multi-Stage Fracture 2710.00 2711.00 0
2013-02-28 Multi-Stage Fracture 2660.00 2661.00 0
2013-02-28 Multi-Stage Fracture 2610.00 2611.00 0
2013-02-20 Multi-Stage Fracture 4550.00 4551.00 0
2013-02-20 Multi-Stage Fracture 4510.00 4511.00 0
2013-02-22 Multi-Stage Fracture 4460.00 4461.00 0
2013-02-22 Multi-Stage Fracture 4410.00 4411.00 0
2013-02-22 Multi-Stage Fracture 4360.00 4361.00 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-02-11 2013-02-11 2,511 0 N/A
2 2013-02-11 2013-02-28 2,511 13,019 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 hydrochloric acid 7647-01-0 100 0.2531 N/A
AI-9 Trican Corrosion Inhibitor methanol 67-56-1 100 0.0004 N/A
modified thiourea polymer 68527-49-1 100 0.0004 N/A
olefin 64743-02-8 100 0.0004 N/A
polyoxyalkylenes 68951-67-7 100 0.0004 N/A
propargyl alcohol 107-19-7 100 0.0004 N/A
DF-1 Trican Defoamer non-hazardous ingredients Not Available 100 0 N/A
IC-3 Trican Iron Control sodium nitrilo-triacetate. monohydrate 18662-53-8 100 0.0011 N/A
S-4W Trican Surfactant diethanolamine 111-42-2 100 0.0022 N/A
fatty acid alkanolamide 68603-42-9 100 0.0022 N/A
fatty acids. coco compounds with diethanamine Trade Secret 100 0.0022 N/A
methanol 67-56-1 100 0.0022 N/A
2 N2 7727-37-9 100 4.885 N/A
water Not Available 100 76.5269 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 4.8827 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 7.2556 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.6396 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0078 N/A
dibromoacetonitrile 3252-43-5 100 0.0078 N/A
non-hazardous ingredients Not Available 100 0.0078 N/A
polyethylene glycol 25322-68-3 100 0.0078 N/A
sodium bromide 7647-15-6 100 0.0078 N/A
WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0006 N/A
CC-3 Trican Clay Control choline chloride 67-48-1 100 0.0132 N/A
formic acid 64-18-6 100 0.0132 N/A
non-hazardous ingredients Not Available 100 0.0132 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1801 N/A
water Not Available 100 0.1801 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.055 N/A
propylene glycol 57-55-6 100 0.055 N/A
FR-8 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0837 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0837 N/A
non-hazardous ingredients Not Available 100 0.0837 N/A
WG-3L Trican Gelling Agent carboxymethyl hydroxypropyl guar 68130-15-4 100 0.0312 N/A
mineral oil Not Available 100 0.0312 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-02-08 2013-03-01 Municipal Water 4916

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 6384 0.0 0.0 0.0
2014 7751 0.0 0.0 0.0
2015 6657 0.0 0.0 0.0
2016 8073 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 7751 0.0 0.0 0.0
2019 5480 0.0 0.0 0.0
2020 2158 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-03-17 No Incident Encountered 0.00 0.00

For data sources see[9]

References