X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0766100807004

Well Details

Well ID: 0766100807004
Loading map...
Location: 00/07-08-076-10W6/4
Location Alias: 00/07-08-76-10 W6M
Location Alias 2: 00/07-08-076-10 W6/04
Country: Canada
Province: Alberta
Township: 076
Meridian: 6
Range: 10
Section: 08
County/Municipality: Saddle Hills County
Well Name: SURGE ENERGY VALHALLA 7-8-76-10
Operator Name: Surge Energy Inc.
License Number: 0306234
License Date: 2004-03-23
License Status: Abandoned
Spud Date: 2004-07-25
Final Drill Date: 2004-08-10
Well Total Depth: 2452.00 m
Surface Hole Latitude: 55.569346
Surface Hole Longitude: -119.507412

For data sources see[1][2]

Well History

Date Event
2004-03-23 Obtained License
2004-07-27 Surface Casing Operation Performed
2004-08-08 Well Log Performed
2004-08-09 Well Log Performed
2004-08-10 Finished Drilling
2004-08-10 Production Casing Operation Performed
2004-08-10 Well Mode changed to Drilled and Cased
2004-08-11 Rig Released
2004-10-17 Perforation Treatment Performed - Jet Perforation
2004-10-17 Well Log Performed
2004-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-10-19 Plug Back Performed
2004-10-19 Well Log Performed
2004-10-20 Perforation Treatment Performed - Jet Perforation
2004-10-20 Well Log Performed
2004-10-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-10-21 Plug Back Performed
2004-10-22 Perforation Treatment Performed - Jet Perforation
2004-10-22 Well Log Performed
2004-10-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-10-23 Plug Back Performed
2004-10-24 Perforation Treatment Performed - Jet Perforation
2004-10-24 Well Log Performed
2005-02-18 Well Began Production
2005-02-18 Well Fluid changed to Gas
2005-02-18 Well Mode changed to Flowing
2012-05-01 Well Fluid changed to Gas
2012-05-01 Well Mode changed to Suspended
2013-06-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-06-15 Perforation Treatment Performed - Jet Perforation
2013-06-16 Perforation Treatment Performed - Chemical Squeeze
2016-06-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-06-29 Plug Back Performed
2016-06-29 Well Fluid changed to Gas
2016-06-29 Well Mode changed to Abandoned Zone
2016-06-30 Well Abandoned
2016-06-30 Well Fluid changed to Gas
2016-06-30 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-10-17 Perforation 2082.50 2085.00 17
2013-06-15 Perforation 700.00 701.50 17
2013-06-16 Chemical Squeeze 703.00 704.50 0
2013-06-16 Chemical Squeeze 700.00 701.50 0
2016-06-29 Packing Device Capped w/Cement 686.00 694.00 0
2004-10-19 Packing Device Capped w/Cement 2057.00 2065.00 0
2004-10-20 Perforation 2032.50 2035.00 17
2004-10-21 Packing Device Capped w/Cement 2017.00 2025.00 0
2004-10-22 Perforation 1826.50 1828.50 17
2004-10-23 Packing Device Capped w/Cement 1807.00 1815.00 0
2004-10-24 Perforation 1757.50 1760.50 17
2013-06-14 Packing Device Capped w/Cement 1740.00 1748.00 0
2013-06-15 Perforation 703.00 704.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 184 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-06-20 No Incident Encountered 0.00 0.00
2016-06-29 No Incident Encountered 0.00 0.00

For data sources see[6]

References