X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0766082313020

Well Details

Well ID: 0766082313020
Loading map...
Location: 02/13-23-076-08W6/0
Location Alias: 02/13-23-76-08 W6M
Location Alias 2: 02/13-23-076-08 W6/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 6
Range: 08
Section: 23
County/Municipality: Saddle Hills County
Well Name: TOURMALINE HZ VALHALLA 13-23-76-8
Operator Name: Tourmaline Oil Corp.
License Number: 0475646
License Date: 2015-06-02
License Status: Amended
Spud Date: 2015-06-24
Final Drill Date: 2015-07-04
Well Total Depth: 3095.00 m
Surface Hole Latitude: 55.593188
Surface Hole Longitude: -119.132934

For data sources see[1][2]

Well History

Date Event
2015-06-02 Obtained License
2015-06-25 Surface Casing Operation Performed
2015-06-27 Direction Drilling Operation Performed - Deviate
2015-06-29 Direction Drilling Operation Performed - Horizontal
2015-07-01 Intermediate Casing Operation Performed
2015-07-04 Finished Drilling
2015-07-04 Well Log Performed
2015-07-04 Well Mode changed to Drilled and Cased
2015-07-05 Liner Casing Operation Performed
2015-07-05 Rig Released
2015-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-08-09 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-13 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-12 Well Began Production
2015-09-12 Well Fluid changed to Crude Oil
2015-09-12 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2015-06-27 1406.60 Deviate (5 - 79 degrees)
2015-06-29 1834.20 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-08-09 Multi-Stage Fracture 3063.90 3064.00 0
2015-08-13 Multi-Stage Fracture 2704.40 2704.50 0
2015-08-13 Multi-Stage Fracture 2659.80 2659.90 0
2015-08-13 Multi-Stage Fracture 2615.80 2615.90 0
2015-08-13 Multi-Stage Fracture 2570.30 2570.40 0
2015-08-13 Multi-Stage Fracture 2526.00 2526.10 0
2015-08-13 Multi-Stage Fracture 2480.80 2480.90 0
2015-08-13 Multi-Stage Fracture 2435.90 2436.00 0
2015-08-13 Multi-Stage Fracture 2390.60 2390.70 0
2015-08-13 Multi-Stage Fracture 2345.70 2345.80 0
2015-08-13 Multi-Stage Fracture 2300.60 2300.70 0
2015-08-09 Acid Treatment 3063.90 3064.00 0
2015-08-13 Multi-Stage Fracture 2255.20 2255.30 0
2015-08-13 Multi-Stage Fracture 2210.00 2210.10 0
2015-08-13 Multi-Stage Fracture 2164.70 2164.80 0
2015-08-13 Multi-Stage Fracture 2119.30 2119.40 0
2015-08-13 Multi-Stage Fracture 2075.00 2075.10 0
2015-08-13 Multi-Stage Fracture 2030.40 2030.50 0
2015-08-13 Multi-Stage Fracture 1999.90 2000.00 0
2015-08-13 Multi-Stage Fracture 1969.60 1969.70 0
2015-08-13 Multi-Stage Fracture 3017.60 3017.70 0
2015-08-13 Multi-Stage Fracture 2973.20 2973.30 0
2015-08-13 Multi-Stage Fracture 2928.80 2929.00 0
2015-08-13 Multi-Stage Fracture 2883.90 2884.00 0
2015-08-13 Multi-Stage Fracture 2838.80 2838.90 0
2015-08-13 Multi-Stage Fracture 2793.70 2793.80 0
2015-08-13 Multi-Stage Fracture 2748.80 2748.90 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-08-09 2015-08-13 1,725 4,133 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 88.0793 N/A
Atlas CRC-LT (20/40) Canyon Crystalline silica. quartz 14808-60-7 100 10.5618 N/A
Phenolic Resin 9003-35-4 100 10.5618 N/A
Sand (50/140) Canyon Aluminum Oxide 1344-28-1 100 1.1117 N/A
Crystalline silica. quartz 14808-60-7 100 1.1117 N/A
Iron Oxide 1309-37-1 100 1.1117 N/A
Titanium Oxide 13463-67-7 100 1.1117 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0185 N/A
Water 7732-18-5 100 0.0185 N/A
CAN-1912 Clay Stabilizer (HT) Canyon Clay Control No hazardous ingredients Not Available 100 0.0978 N/A
CAN-2410 Demulsifier Canyon Demulsifier Methyl Alcohol 67-56-1 100 0.0831 N/A
Water 7732-18-5 100 0.0831 N/A
CAN-2057 Friction Reducer Canyon Gelling Agent No hazardous ingredients Not Available 100 0.0474 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-08-13 2015-08-13 Surface Water - Runoff 4134

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 2449 0.0 0.0 0.0
2016 5905 0.0 0.0 0.0
2017 7775 0.0 0.0 0.0
2018 6653 0.0 0.0 0.0
2019 8428 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-07-05 No Incident Encountered 0.00 0.00
2015-09-01 No Incident Encountered 0.00 0.00

For data sources see[9]

References