X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0766081009000

Well Details

Well ID: 0766081009000
Loading map...
Location: 00/09-10-076-08W6/0
Location Alias: 00/09-10-76-08 W6M
Location Alias 2: 00/09-10-076-08 W6/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 6
Range: 08
Section: 10
County/Municipality: Saddle Hills County
Well Name: TIDEWATER VALHALLA 9-10-76-8
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0253115
License Date: 2001-03-22
License Status: Abandoned
Spud Date: 2001-06-07
Final Drill Date: 2001-07-01
Well Total Depth: 2725.00 m
Surface Hole Latitude: 55.575301
Surface Hole Longitude: -119.143536

For data sources see[1][2]

Well History

Date Event
2001-03-22 Obtained License
2001-06-08 Surface Casing Operation Performed
2001-06-14 Direction Drilling Operation Performed - Deviate
2001-07-01 Finished Drilling
2001-07-02 Well Log Performed
2001-07-04 Well Log Performed
2001-07-07 Production Casing Operation Performed
2001-07-07 Rig Released
2001-07-07 Well Mode changed to Drilled and Cased
2001-07-24 Perforation Treatment Performed - Jet Perforation
2001-07-26 Perforation Treatment Performed - Fractured
2001-07-28 Perforation Treatment Performed - Jet Perforation
2001-07-30 Perforation Treatment Performed - Fractured
2001-08-01 Perforation Treatment Performed - Jet Perforation
2001-08-01 Well Log Performed
2001-08-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-11-26 Well Log Performed
2003-07-08 Well Began Production
2003-07-08 Well Fluid changed to Gas
2003-07-08 Well Mode changed to Flowing
2004-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-08-03 Perforation Treatment Performed - Jet Perforation
2008-08-03 Well Log Performed
2008-08-16 Perforation Treatment Performed - Cement Squeeze
2008-08-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-08-18 Well Log Performed
2008-08-20 Perforation Treatment Performed - Jet Perforation
2008-08-21 Perforation Treatment Performed - Cement Plug
2008-08-21 Perforation Treatment Performed - Cement Squeeze
2008-08-23 Perforation Treatment Performed - Jet Perforation
2008-08-23 Well Log Performed
2008-08-24 Perforation Treatment Performed - Cement Plug
2008-08-24 Perforation Treatment Performed - Cement Squeeze
2008-08-25 Perforation Treatment Performed - Jet Perforation
2008-08-26 Perforation Treatment Performed - Cement Plug
2008-08-26 Perforation Treatment Performed - Cement Squeeze
2008-08-27 Well Log Performed
2008-08-28 Perforation Treatment Performed - Cement Plug
2008-08-28 Perforation Treatment Performed - Cement Squeeze
2008-08-28 Perforation Treatment Performed - Jet Perforation
2008-08-28 Well Log Performed
2008-09-02 Perforation Treatment Performed - Jet Perforation
2008-09-04 Perforation Treatment Performed - Cement Plug
2008-09-04 Perforation Treatment Performed - Cement Squeeze
2008-09-04 Perforation Treatment Performed - Jet Perforation
2008-09-04 Well Log Performed
2008-09-10 Perforation Treatment Performed - Jet Perforation
2008-09-10 Well Log Performed
2008-09-11 Perforation Treatment Performed - Cement Squeeze
2008-09-13 Well Log Performed
2008-09-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-09-16 Perforation Treatment Performed - Cement Squeeze
2008-09-16 Perforation Treatment Performed - Jet Perforation
2008-09-16 Well Log Performed
2008-09-21 Perforation Treatment Performed - Abrasa-Jet Perforation
2008-09-22 Perforation Treatment Performed - Cement Plug
2008-09-22 Perforation Treatment Performed - Cement Squeeze
2008-12-11 Perforation Treatment Performed - Jet Perforation
2008-12-12 Perforation Treatment Performed - Cement Squeeze
2008-12-16 Perforation Treatment Performed - Jet Perforation
2008-12-17 Perforation Treatment Performed - Cement Squeeze
2008-12-17 Plug Back Performed
2008-12-17 Well Fluid changed to Gas
2008-12-17 Well Mode changed to Abandoned Zone
2010-03-05 Well Abandoned
2010-03-05 Well Fluid changed to Gas
2010-03-05 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-06-14 1921.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-07-24 Perforation 2449.00 2451.00 20
2008-08-03 Perforation 2317.80 2328.00 4
2008-08-16 Cement Squeeze 2366.00 2369.00 0
2008-08-16 Cement Squeeze 2342.00 2343.00 0
2008-08-17 Packing Device Capped w/Cement 2231.60 2433.30 0
2008-08-20 Perforation 1210.50 1211.50 99
2008-08-20 Perforation 1200.50 1201.50 99
2008-08-21 Cement Squeeze 1210.50 1211.50 0
2008-08-21 Cement Squeeze 1200.50 1201.50 0
2008-08-21 Cement Plug 983.80 1215.00 0
2008-08-23 Perforation 863.00 864.00 99
2001-07-24 Perforation 2453.00 2454.50 20
2008-08-24 Cement Squeeze 863.00 864.00 0
2008-08-24 Cement Plug 814.90 885.00 0
2008-08-25 Perforation 712.50 713.50 99
2008-08-26 Cement Squeeze 712.50 713.50 0
2008-08-26 Cement Plug 683.80 732.00 0
2008-08-28 Perforation 681.80 682.80 99
2008-08-28 Perforation 621.50 622.50 99
2008-08-28 Cement Squeeze 681.80 682.80 0
2008-08-28 Cement Squeeze 621.50 622.50 0
2008-08-28 Cement Plug 595.70 734.00 0
2001-07-26 Fracture 2449.00 2454.50 0
2008-09-02 Perforation 621.50 622.50 99
2008-09-04 Perforation 624.00 625.00 99
2008-09-04 Perforation 623.00 624.00 99
2008-09-04 Perforation 622.00 623.00 21
2008-09-04 Perforation 622.00 623.00 21
2008-09-04 Cement Squeeze 622.00 625.00 0
2008-09-04 Cement Plug 496.70 641.00 0
2008-09-10 Perforation 481.00 482.00 99
2008-09-10 Perforation 480.00 481.00 99
2008-09-11 Cement Squeeze 480.00 482.00 0
2001-07-28 Perforation 2366.00 2369.00 20
2008-09-15 Packing Device Capped w/Cement 467.00 475.00 0
2008-09-16 Perforation 422.00 423.00 99
2008-09-16 Cement Squeeze 422.00 423.00 0
2008-09-21 Hydra Jet Perforation 420.00 424.00 1
2008-09-22 Cement Squeeze 420.00 424.00 0
2008-09-22 Cement Plug 404.00 444.30 0
2008-12-11 Perforation 399.00 400.00 99
2008-12-12 Cement Squeeze 399.00 400.00 0
2008-12-16 Perforation 389.00 390.00 99
2008-12-17 Cement Squeeze 389.00 390.00 0
2001-07-30 Fracture 2366.00 2369.00 0
2001-08-01 Perforation 2342.00 2343.00 20
2001-08-02 Acid Treatment 2342.00 2343.00 0
2004-06-11 Acid Treatment 2342.00 2369.00 0
2004-08-13 Acid Treatment 2342.00 2343.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 1778 0.0 0.0 0.0
2004 1273 0.0 0.0 0.0
2007 1 0.0 0.0 0.0
2008 1 0.0 0.0 0.0

For data sources see[6]

References