X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0766080411000

Well Details

Well ID: 0766080411000
Loading map...
Location: 00/11-04-076-08W6/0
Location Alias: 00/11-04-76-08 W6M
Location Alias 2: 00/11-04-076-08 W6/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 6
Range: 08
Section: 04
County/Municipality: Saddle Hills County
Well Name: CDN ABRAXAS SADDLE HILLS 11-4-76-8
Operator Name: TAQA North Ltd.
License Number: 0007401
License Date: 1953-11-27
License Status: Abandoned
Spud Date: 1953-12-05
Final Drill Date: 1954-01-31
Well Total Depth: 1915.70 m
Surface Hole Latitude: 55.557754
Surface Hole Longitude: -119.179968

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-11-27 Obtained License
1953-12-18 Drill Stem Test Performed
1953-12-19 Drill Stem Test Performed
1953-12-21 Drill Stem Test Performed
1953-12-23 Drill Stem Test Performed
1953-12-26 Drill Stem Test Performed
1953-12-31 Drill Stem Test Performed
1954-01-02 Drill Stem Test Performed
1954-01-04 Drill Stem Test Performed
1954-01-06 Drill Stem Test Performed
1954-01-07 Drill Stem Test Performed
1954-01-08 Drill Stem Test Performed
1954-01-09 Drill Stem Test Performed
1954-01-10 Drill Stem Test Performed
1954-01-13 Drill Stem Test Performed
1954-01-14 Drill Stem Test Performed
1954-01-21 Drill Stem Test Performed
1954-01-31 Drill Stem Test Performed
1954-01-31 Finished Drilling
1954-02-02 Production Casing Operation Performed
1954-02-05 Drill Stem Test Performed
1954-02-05 Perforation Treatment Performed - Bullet Perforation
1954-02-07 Perforation Treatment Performed - Acid Wash - No Pressure
1954-02-07 Perforation Treatment Performed - Bullet Perforation
1954-02-09 Perforation Treatment Performed - Acid Wash - No Pressure
1954-02-09 Perforation Treatment Performed - Bullet Perforation
1954-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-02-14 Drill Stem Test Performed
1954-02-14 Perforation Treatment Performed - Jet Perforation
1954-02-15 Perforation Treatment Performed - Acid Wash - No Pressure
1954-02-15 Perforation Treatment Performed - Cement Plug
1954-02-16 Perforation Treatment Performed - Jet Perforation
1954-02-18 Well Mode changed to Drilled and Cased
1994-12-15 Well Began Production
1994-12-15 Well Fluid changed to Gas
1994-12-15 Well Mode changed to Flowing
2001-07-18 Well Log Performed
2001-07-20 Perforation Treatment Performed - Jet Perforation
2001-07-20 Well Log Performed
2001-07-21 Well Log Performed
2007-01-17 Well Fluid changed to Gas
2007-01-17 Well Mode changed to Suspended
2008-03-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-22 Perforation Treatment Performed - Jet Perforation
2008-03-22 Plug Back Performed
2008-03-22 Well Fluid changed to Gas
2008-03-22 Well Log Performed
2008-03-22 Well Mode changed to Abandoned Zone
2008-03-23 Perforation Treatment Performed - Jet Perforation
2008-03-23 Well Log Performed
2008-03-25 Perforation Treatment Performed - Remedial Casing
2008-05-28 Perforation Treatment Performed - Jet Perforation
2008-05-29 Perforation Treatment Performed - Cement Plug
2008-05-29 Perforation Treatment Performed - Remedial Casing
2008-06-10 Well Abandoned
2008-06-10 Well Fluid changed to Gas
2008-06-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-02-05 Bullet Perforation 1705.10 1707.50 13
1954-02-15 Cement Plug 1188.70 1249.70 0
1954-02-16 Perforation 1175.30 1178.70 13
2001-07-20 Perforation 1156.00 1159.00 17
2001-07-20 Perforation 1166.00 1170.30 17
2008-03-22 Packing Device Capped w/Cement 1165.00 1173.00 0
2008-03-22 Packing Device Capped w/Cement 1142.00 1150.00 0
2008-03-22 Perforation 897.00 898.00 13
2008-03-23 Perforation 628.00 629.00 13
2008-03-25 Remedial Casing Cementing 897.00 898.00 0
2008-03-25 Remedial Casing Cementing 628.00 629.00 0
1954-02-07 Bullet Perforation 1707.50 1708.10 13
2008-05-28 Perforation 233.00 234.00 13
2008-05-28 Perforation 205.00 206.00 13
2008-05-29 Remedial Casing Cementing 233.00 234.00 0
2008-05-29 Remedial Casing Cementing 205.00 206.00 0
2008-05-29 Cement Plug 179.00 230.00 0
1954-02-07 Acid Wash 1705.10 1708.10 0
1954-02-09 Bullet Perforation 1706.00 1708.10 13
1954-02-09 Acid Wash 1705.10 1708.10 0
1954-02-09 Bullet Perforation 1706.00 1708.10 13
1954-02-12 Acid Treatment 1705.10 1708.10 0
1954-02-14 Perforation 1245.10 1248.50 13
1954-02-15 Acid Wash 1244.80 1248.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1994 393 0.0 0.0 0.0
1995 8586 0.0 0.0 0.0
1996 8185 0.0 0.0 0.0
1997 6069 0.0 0.0 0.0
1998 89 0.0 0.0 0.0
2001 3167 0.0 0.0 0.0

For data sources see[5]

References