X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0766073515002

Well Details

Well ID: 0766073515002
Loading map...
Location: 00/15-35-076-07W6/2
Location Alias: 00/15-35-76-07 W6M
Location Alias 2: 00/15-35-076-07 W6/02
Country: Canada
Province: Alberta
Township: 076
Meridian: 6
Range: 07
Section: 35
County/Municipality: Saddle Hills County
Well Name: TOURMALINE VALHALLA 15-35-76-7
Operator Name: Tourmaline Oil Corp.
License Number: 0088000
License Date: 1981-01-05
License Status: Suspension
Spud Date: 1981-01-07
Final Drill Date: 1981-02-03
Well Total Depth: 2290.00 m
Surface Hole Latitude: 55.632709
Surface Hole Longitude: -118.965191

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-01-05 Obtained License
1981-01-16 Drill Stem Test Performed
1981-01-17 Drill Stem Test Performed
1981-01-19 Drill Stem Test Performed
1981-02-03 Finished Drilling
1981-02-03 Well Log Performed
1981-02-03 Well Mode changed to Drilled and Cased
1981-02-05 Drill Stem Test Performed
1981-02-08 Production Casing Operation Performed
1981-02-27 Perforation Treatment Performed - Jet Perforation
1981-03-01 Perforation Treatment Performed - Jet Perforation
1981-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-13 Perforation Treatment Performed - Cement Plug
1981-06-13 Perforation Treatment Performed - Cement Squeeze
1981-06-14 Perforation Treatment Performed - Jet Perforation
1981-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-15 Perforation Treatment Performed - Cement Squeeze
1981-06-15 Perforation Treatment Performed - Jet Perforation
1981-06-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-16 Perforation Treatment Performed - Cement Squeeze
1981-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-19 Perforation Treatment Performed - Jet Perforation
1994-10-22 Perforation Treatment Performed - Cement Squeeze
1994-10-22 Plug Back Performed
1994-10-27 Perforation Treatment Performed - Jet Perforation
1994-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-04 Perforation Treatment Performed - Fractured
1994-12-05 Perforation Treatment Performed - Jet Perforation
1994-12-23 Well Began Production
1994-12-23 Well Fluid changed to Gas
1994-12-23 Well Mode changed to Flowing
1995-02-20 Well Fluid changed to Gas
1995-02-20 Well Mode changed to Suspended
2002-11-11 Perforation Treatment Performed - Jet Perforation
2002-11-11 Well Log Performed
2002-11-12 Perforation Treatment Performed - Fractured
2008-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-07-10 Plug Back Performed
2008-07-10 Well Fluid changed to Gas
2008-07-10 Well Mode changed to Abandoned Zone
2008-07-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-07-11 Plug Back Performed
2008-07-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-07-13 Perforation Treatment Performed - Cement Plug
2008-07-13 Plug Back Performed
2008-07-13 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-02-27 Perforation 2112.00 2114.00 14
1981-06-16 Acid Treatment 1376.80 1377.30 0
1981-06-16 Cement Squeeze 1376.80 1377.30 0
1981-06-19 Perforation 1450.00 1454.00 14
1981-06-19 Acid Treatment 1450.00 1454.00 0
1994-10-22 Cement Squeeze 1450.00 1454.00 0
1994-10-27 Perforation 1600.00 1602.00 13
1994-10-28 Acid Treatment 1600.00 1602.00 0
1994-11-04 Fracture 1600.00 1602.00 0
1994-12-05 Perforation 2112.00 2114.00 14
2002-11-11 Perforation 499.00 500.00 14
1981-03-01 Perforation 1600.00 1602.00 14
2002-11-12 Fracture 499.00 500.00 0
2008-07-10 Packing Device Capped w/Cement 2099.00 2107.00 0
2008-07-11 Packing Device Capped w/Cement 1587.00 1595.00 0
2008-07-13 Cement Plug 1342.60 1469.30 0
2008-07-13 Packing Device Capped w/Cement 487.00 495.00 0
1981-03-18 Acid Treatment 1600.00 1602.00 0
1981-06-13 Cement Squeeze 1600.00 1602.00 0
1981-06-13 Cement Plug 1487.00 1602.00 0
1981-06-14 Perforation 1452.00 1452.50 8
1981-06-15 Acid Treatment 1452.00 1452.50 0
1981-06-15 Cement Squeeze 1452.00 1452.50 0
1981-06-15 Perforation 1376.80 1377.30 8

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 131 0.0 0.0 0.0
1995 1103 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-10-17 No Incident Encountered 0.00 0.00

For data sources see[6]

References