If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0766071916002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.591532,"lon":-119.03344,"icon":""}]} |
Location: 00/16-19-076-07W6/2 | |
Location Alias: 00/16-19-76-07 W6M | |
Location Alias 2: 00/16-19-076-07 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 076 | |
Meridian: 6 | |
Range: 07 | |
Section: 19 | |
County/Municipality: Saddle Hills County | |
Well Name: TOURMALINE HZ VALHALLA 2-20-76-7 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0472607 | |
License Date: 2014-12-03 | |
License Status: Amended | |
Spud Date: 2015-07-09 | |
Final Drill Date: 2015-08-13 | |
Well Total Depth: 4025.00 m | |
Surface Hole Latitude: 55.591532 | |
Surface Hole Longitude: -119.033440 |
Date | Event |
---|---|
2014-12-03 | Obtained License |
2015-07-10 | Surface Casing Operation Performed |
2015-07-30 | Direction Drilling Operation Performed - Deviate |
2015-08-01 | Direction Drilling Operation Performed - Horizontal |
2015-08-02 | Well Log Performed |
2015-08-06 | Intermediate Casing Operation Performed |
2015-08-13 | Finished Drilling |
2015-08-13 | Well Log Performed |
2015-08-13 | Well Mode changed to Drilled and Cased |
2015-08-15 | Liner Casing Operation Performed |
2015-08-15 | Rig Released |
2015-09-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-09-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-10-17 | Well Began Production |
2015-10-17 | Well Fluid changed to Crude Oil |
2015-10-17 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2015-07-30 | 1306.00 | Deviate (5 - 79 degrees) |
2015-08-01 | 1830.80 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-09-26 | Multi-Stage Fracture | 3996.90 | 3997.00 | 0 |
2015-09-27 | Multi-Stage Fracture | 3389.90 | 3390.00 | 0 |
2015-09-27 | Multi-Stage Fracture | 3316.20 | 3316.30 | 0 |
2015-09-27 | Multi-Stage Fracture | 3256.10 | 3256.20 | 0 |
2015-09-27 | Multi-Stage Fracture | 3182.50 | 3182.60 | 0 |
2015-09-27 | Multi-Stage Fracture | 3122.60 | 3122.70 | 0 |
2015-09-27 | Multi-Stage Fracture | 3048.80 | 3048.90 | 0 |
2015-09-27 | Multi-Stage Fracture | 2989.20 | 2989.30 | 0 |
2015-09-27 | Multi-Stage Fracture | 2915.20 | 2915.30 | 0 |
2015-09-27 | Multi-Stage Fracture | 2855.60 | 2855.70 | 0 |
2015-09-27 | Multi-Stage Fracture | 2782.10 | 2782.20 | 0 |
2015-09-27 | Multi-Stage Fracture | 3919.90 | 3920.00 | 0 |
2015-09-27 | Multi-Stage Fracture | 2723.60 | 2723.70 | 0 |
2015-09-27 | Multi-Stage Fracture | 2650.50 | 2650.60 | 0 |
2015-09-27 | Multi-Stage Fracture | 2591.80 | 2591.90 | 0 |
2015-09-27 | Multi-Stage Fracture | 2518.20 | 2518.30 | 0 |
2015-09-27 | Multi-Stage Fracture | 2458.90 | 2459.00 | 0 |
2015-09-27 | Multi-Stage Fracture | 2401.00 | 2401.10 | 0 |
2015-09-27 | Multi-Stage Fracture | 2341.80 | 2341.90 | 0 |
2015-09-27 | Multi-Stage Fracture | 3847.10 | 3847.20 | 0 |
2015-09-27 | Multi-Stage Fracture | 3788.40 | 3788.50 | 0 |
2015-09-27 | Multi-Stage Fracture | 3715.50 | 3715.60 | 0 |
2015-09-27 | Multi-Stage Fracture | 3657.00 | 3657.10 | 0 |
2015-09-27 | Multi-Stage Fracture | 3583.70 | 3583.80 | 0 |
2015-09-27 | Multi-Stage Fracture | 3523.80 | 3523.90 | 0 |
2015-09-27 | Multi-Stage Fracture | 3449.50 | 3449.60 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-09-26 | 2015-09-27 | 1,671 | 4,214 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 88.3318 | N/A | |||
Atlas CRC-LT (20/40) | Canyon | Crystalline silica. quartz | 14808-60-7 | 100 | 4.8998 | N/A | ||
Phenolic Resin | 9003-35-4 | 100 | 4.8998 | N/A | ||||
Sand (20/40) Ottawa | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 5.4443 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 5.4443 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 5.4443 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 5.4444 | N/A | ||||
Sand (50/140) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 1.0888 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 1.0888 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 1.0888 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 1.0888 | N/A | ||||
Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0078 | N/A | |
Water | 7732-18-5 | 100 | 0.0078 | N/A | ||||
CAN-1912 Clay Stabilizer (HT) | Canyon | Clay Control | No hazardous ingredients | Not Available | 100 | 0.0972 | N/A | |
CAN-2410 Demulsifier | Canyon | Demulsifier | Methyl Alcohol | 67-56-1 | 100 | 0.0826 | N/A | |
Water | 7732-18-5 | 100 | 0.0826 | N/A | ||||
CAN-2057 Friction Reducer | Canyon | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0472 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2015-10-24 | 2015-10-29 | Surface Water - Runoff | 4215 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 48 | 0.0 | 0.0 | 0.0 |
2016 | 6839 | 0.0 | 0.0 | 0.0 |
2017 | 8074 | 0.0 | 0.0 | 0.0 |
2018 | 7303 | 0.0 | 0.0 | 0.0 |
2019 | 7214 | 0.0 | 0.0 | 0.0 |
2020 | 1469 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-08-13 | No Incident Encountered | 0.00 | 0.00 |
2015-11-07 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]