X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0765201709000

Well Details

Well ID: 0765201709000
Loading map...
Location: 00/09-17-076-20W5/0
Location Alias: 00/09-17-76-20 W5M
Location Alias 2: 00/09-17-076-20 W5/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 5
Range: 20
Section: 17
County/Municipality: Municipal District of Smoky River No. 130
Well Name: LONG RUN HZ GVILLEE 9-17-76-20
Operator Name: Long Run Exploration Ltd.
License Number: 0448763
License Date: 2012-09-27
License Status: Issued
Spud Date: 2012-10-25
Final Drill Date: 2012-11-01
Well Total Depth: 2204.00 m
Surface Hole Latitude: 55.593134
Surface Hole Longitude: -117.078351

For data sources see[1][2]

Well History

Date Event
2012-09-27 Obtained License
2012-10-26 Surface Casing Operation Performed
2012-10-28 Direction Drilling Operation Performed - Deviate
2012-10-29 Direction Drilling Operation Performed - Horizontal
2012-10-29 Well Log Performed
2012-10-30 Intermediate Casing Operation Performed
2012-10-30 Well Log Performed
2012-11-01 Finished Drilling
2012-11-01 Well Log Performed
2012-11-01 Well Mode changed to Drilled and Cased
2012-11-03 Liner Casing Operation Performed
2012-11-04 Rig Released
2012-11-11 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-12 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-14 Well Began Production
2012-11-14 Well Fluid changed to Crude Oil
2012-11-14 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-10-25 Trinidad Drilling Ltd. 24 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-10-28 680.10 Deviate (5 - 79 degrees)
2012-10-29 1208.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-11-11 Multi-Stage Fracture 2177.30 2177.70 0
2012-11-12 Multi-Stage Fracture 1817.00 1817.40 0
2012-11-12 Multi-Stage Fracture 1777.00 1777.40 0
2012-11-12 Multi-Stage Fracture 1737.00 1737.40 0
2012-11-12 Multi-Stage Fracture 1697.00 1697.40 0
2012-11-12 Multi-Stage Fracture 1657.00 1657.40 0
2012-11-12 Multi-Stage Fracture 1617.00 1617.40 0
2012-11-12 Multi-Stage Fracture 1577.00 1577.40 0
2012-11-12 Multi-Stage Fracture 1537.00 1537.40 0
2012-11-12 Multi-Stage Fracture 1497.00 1497.40 0
2012-11-12 Multi-Stage Fracture 1457.00 1457.40 0
2012-11-11 Multi-Stage Fracture 2137.00 2137.40 0
2012-11-12 Multi-Stage Fracture 1417.00 1417.40 0
2012-11-12 Multi-Stage Fracture 1377.00 1377.40 0
2012-11-12 Multi-Stage Fracture 1337.00 1337.40 0
2012-11-11 Multi-Stage Fracture 2097.00 2097.40 0
2012-11-11 Multi-Stage Fracture 2057.00 2057.40 0
2012-11-11 Multi-Stage Fracture 2017.00 2017.40 0
2012-11-11 Multi-Stage Fracture 1977.00 1977.40 0
2012-11-11 Multi-Stage Fracture 1937.00 1937.40 0
2012-11-12 Multi-Stage Fracture 1897.00 1897.40 0
2012-11-12 Multi-Stage Fracture 1857.00 1857.40 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1139 0.0 0.0 0.0
2013 8644 0.0 0.0 0.0
2014 8388 0.0 0.0 0.0
2015 6408 0.0 0.0 0.0
2016 7130 0.0 0.0 0.0
2017 8643 0.0 0.0 0.0
2018 8685 0.0 0.0 0.0
2019 8422 0.0 0.0 0.0
2020 2051 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-11-03 No Incident Encountered 0.00 0.00
2012-11-12 No Incident Encountered 0.00 0.00

For data sources see[8]

References