X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0765201014002

Well Details

Well ID: 0765201014002
Loading map...
Location: 00/14-10-076-20W5/2
Location Alias: 00/14-10-76-20 W5M
Location Alias 2: 00/14-10-076-20 W5/02
Country: Canada
Province: Alberta
Township: 076
Meridian: 5
Range: 20
Section: 10
County/Municipality: Municipal District of Smoky River No. 130
Well Name: ARL GIROUXVILLE EAST 14-10-76-20
Operator Name: Long Run Exploration Ltd.
License Number: 0190480
License Date: 1996-08-14
License Status: Suspension
Spud Date: 1996-08-22
Final Drill Date: 1996-09-23
Well Total Depth: 2429.00 m
Surface Hole Latitude: 55.576521
Surface Hole Longitude: -117.016418

For data sources see[1][2]

Well History

Date Event
1996-08-14 Obtained License
1996-08-23 Surface Casing Operation Performed
1996-09-11 Direction Drilling Operation Performed - Deviate
1996-09-23 Finished Drilling
1996-09-23 Well Log Performed
1996-09-23 Well Mode changed to Drilled and Cased
1996-09-24 Well Log Performed
1996-09-25 Plug Back Performed
1996-09-26 Production Casing Operation Performed
1996-09-26 Rig Released
1996-12-10 Perforation Treatment Performed - Jet Perforation
1996-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-12-13 Plug Back Performed
1996-12-14 Perforation Treatment Performed - Jet Perforation
1996-12-17 Perforation Treatment Performed - Fractured
1997-03-21 Well Began Production
1997-03-21 Well Fluid changed to Gas
1997-03-21 Well Mode changed to Flowing
2002-10-31 Well Fluid changed to Gas
2002-10-31 Well Mode changed to Suspended
2010-04-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-04-27 Perforation Treatment Performed - Jet Perforation
2010-04-27 Plug Back Performed
2010-04-27 Well Fluid changed to Gas
2010-04-27 Well Mode changed to Abandoned Zone
2010-04-28 Perforation Treatment Performed - Jet Perforation
2010-04-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-04-29 Perforation Treatment Performed - Jet Perforation
2010-04-29 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-09-11 1874.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-12-10 Perforation 1127.00 1130.00 18
2010-04-29 Packing Device Capped w/Cement 929.00 937.00 0
2010-04-29 Perforation 811.00 812.50 17
2010-04-29 Packing Device Capped w/Cement 799.00 807.00 0
1996-12-12 Acid Treatment 1127.00 1130.00 0
1996-12-13 Packing Device Capped w/Cement 1112.00 1120.00 0
1996-12-14 Perforation 1066.00 1072.00 13
1996-12-17 Fracture 1066.50 1071.50 0
2010-04-27 Packing Device Capped w/Cement 1054.00 1062.00 0
2010-04-27 Perforation 952.50 954.00 17
2010-04-27 Perforation 949.00 951.00 17
2010-04-28 Perforation 943.00 944.50 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 6685 0.0 0.0 0.0
1998 8147 0.0 0.0 0.0
1999 5450 0.0 0.0 0.0
2000 7193 0.0 0.0 0.0
2001 1858 0.0 0.0 0.0

For data sources see[6]

References