X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0764061607020

Well Details

Well ID: 0764061607020
Loading map...
Location: 02/07-16-076-06W4/0
Location Alias: 02/07-16-76-06 W4M
Location Alias 2: 02/07-16-076-06 W4/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 4
Range: 06
Section: 16
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: CVE FCCL 7B LEISMER 7-16-76-6
Operator Name: Cenovus Energy Inc.
License Number: 0249293
License Date: 2001-01-18
License Status: Abandoned
Spud Date: 2001-02-07
Final Drill Date: 2001-02-12
Well Total Depth: 424.00 m
Surface Hole Latitude: 55.581602
Surface Hole Longitude: -110.871827

For data sources see[1][2]

Well History

Date Event
2001-01-18 Obtained License
2001-02-09 Surface Casing Operation Performed
2001-02-12 Finished Drilling
2001-02-13 Well Log Performed
2001-02-14 Production Casing Operation Performed
2001-02-14 Rig Released
2001-02-14 Well Mode changed to Drilled and Cased
2001-03-11 Well Log Performed
2001-08-04 Well Log Performed
2001-08-05 Perforation Treatment Performed - Open-Hole Completion
2001-08-06 Well Log Performed
2001-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-08-16 Well Log Performed
2001-08-17 Well Log Performed
2001-08-21 Well Log Performed
2002-05-11 Well Began Injection
2002-05-11 Well Fluid changed to Water
2002-05-11 Well Type changed to Disposal
2003-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-01-31 Well Log Performed
2014-02-01 Perforation Treatment Performed - Jet Perforation
2014-02-01 Well Log Performed
2014-02-02 Perforation Treatment Performed - Jet Perforation
2014-02-02 Well Log Performed
2014-06-08 Well Log Performed
2014-06-10 Well Log Performed
2014-07-24 Well Log Performed
2014-11-07 Well Log Performed
2014-12-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-12-03 Plug Back Performed
2014-12-03 Well Fluid changed to Water
2014-12-03 Well Mode changed to Abandoned Zone
2014-12-03 Well Type changed to Disposal
2014-12-07 Well Abandoned
2014-12-07 Well Fluid changed to Water
2014-12-07 Well Mode changed to Abandoned
2014-12-07 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-08-05 Open Hole/Barefoot Completion 405.70 424.00 0
2001-08-12 Acid Treatment 405.70 424.00 0
2003-09-23 Acid Treatment 405.70 424.00 0
2014-02-01 Perforation 415.00 417.00 20
2014-02-02 Perforation 409.00 412.00 20
2014-12-03 Packing Device Capped w/Cement 61.20 339.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-02-02 No Incident Encountered 0.00 0.00
2014-06-11 No Incident Encountered 0.00 0.00
2014-07-25 No Incident Encountered 0.00 0.00
2014-12-04 No Incident Encountered 0.00 0.00

For data sources see[6]

References