X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0764061403130

Well Details

Well ID: 0764061403130
Loading map...
Location: 13/03-14-076-06W4/0
Location Alias: 13/03-14-76-06 W4M
Location Alias 2: 13/03-14-076-06 W4/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 4
Range: 06
Section: 14
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: CVE FCCL B11P03 LEISMER 3-14-76-6
Operator Name: Cenovus Energy Inc.
License Number: 0426139
License Date: 2010-11-22
License Status: Issued
Spud Date: 2012-06-09
Final Drill Date: 2012-07-25
Well Total Depth: 1513.00 m
Surface Hole Latitude: 55.586709
Surface Hole Longitude: -110.840516

For data sources see[1][2]

Well History

Date Event
2010-11-22 Obtained License
2012-06-08 Direction Drilling Operation Performed - Deviate
2012-06-09 Surface Casing Operation Performed
2012-06-09 Well Mode changed to Preset
2012-07-11 Direction Drilling Operation Performed - Horizontal
2012-07-12 Intermediate Casing Operation Performed
2012-07-12 Well Log Performed
2012-07-25 Finished Drilling
2012-07-25 Liner Casing Operation Performed
2012-07-25 Perforation Treatment Performed - Open-Hole Completion
2012-07-25 Well Log Performed
2012-07-25 Well Mode changed to Drilled and Cased
2012-07-26 Perforation Treatment Performed - Slotted Liner or Casing
2012-07-26 Rig Released
2012-09-14 Well Log Performed
2013-07-31 Well Began Production
2013-07-31 Well Type changed to Steam Assisted Gravity Drain
2014-10-04 Well Log Performed

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-06-08 Akita Drilling Ltd. 27 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-06-08 91.30 Deviate (5 - 79 degrees)
2012-07-11 567.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-07-25 Open Hole/Barefoot Completion 1498.00 1513.00 0
2012-07-26 Slotted Liner 766.00 1498.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 1335 0.0 0.0 0.0
2014 8311 0.0 0.0 0.0
2015 8469 0.0 0.0 0.0
2016 7748 0.0 0.0 0.0
2017 8500 0.0 0.0 0.0
2018 8349 0.0 0.0 0.0
2019 8429 0.0 0.0 0.0
2020 1559 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-09 No Incident Encountered 0.00 0.00
2012-07-26 No Incident Encountered 0.00 0.00

For data sources see[8]

References