X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0764061111030

Well Details

Well ID: 0764061111030
Loading map...
Location: 03/11-11-076-06W4/0
Location Alias: 03/11-11-76-06 W4M
Location Alias 2: 03/11-11-076-06 W4/00
Country: Canada
Province: Alberta
Township: 076
Meridian: 4
Range: 06
Section: 11
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: CVE FCCL B05P04 LEISMER 11-11-76-6
Operator Name: Cenovus Energy Inc.
License Number: 0410460
License Date: 2009-05-12
License Status: Abandoned
Spud Date: 2010-07-13
Final Drill Date: 2010-08-20
Well Total Depth: 1443.00 m
Surface Hole Latitude: 55.580182
Surface Hole Longitude: -110.819077

For data sources see[1][2]

Well History

Date Event
2009-05-12 Obtained License
2010-07-14 Direction Drilling Operation Performed - Horizontal
2010-07-14 Surface Casing Operation Performed
2010-08-05 Well Log Performed
2010-08-08 Intermediate Casing Operation Performed
2010-08-20 Finished Drilling
2010-08-20 Liner Casing Operation Performed
2010-08-20 Perforation Treatment Performed - Open-Hole Completion
2010-08-20 Perforation Treatment Performed - Slotted Liner or Casing
2010-08-20 Rig Released
2010-08-20 Well Mode changed to Drilled and Cased
2010-10-09 Well Log Performed
2012-06-16 Well Began Production
2012-06-16 Well Type changed to Steam Assisted Gravity Drain
2015-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-03-30 Well Mode changed to Suspended
2018-03-30 Well Type changed to Steam Assisted Gravity Drain
2019-07-06 Well Log Performed
2019-07-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-07-07 Plug Back Performed
2019-07-07 Well Mode changed to Abandoned Zone
2019-07-07 Well Type changed to Steam Assisted Gravity Drain
2019-07-13 Well Abandoned
2019-07-13 Well Mode changed to Abandoned
2019-07-13 Well Type changed to Steam Assisted Gravity Drain

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-07-14 85.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-08-20 Open Hole/Barefoot Completion 1428.00 1443.00 0
2010-08-20 Slotted Liner 648.50 1428.00 0
2015-09-24 Acid Treatment 712.10 1428.00 0
2019-07-07 Packing Device Capped w/Cement 145.00 437.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2726 0.0 0.0 0.0
2013 8133 0.0 0.0 0.0
2014 8477 0.0 0.0 0.0
2015 8537 0.0 0.0 0.0
2016 8290 0.0 0.0 0.0
2017 8707 0.0 0.0 0.0
2018 1564 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-09-24 No Incident Encountered 0.00 0.00
2018-03-31 No Incident Encountered 0.00 0.00
2019-07-14 No Incident Encountered 0.00 0.00

For data sources see[7]

References