If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0756132006002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.509314,"lon":-119.980371,"icon":""}]} |
Location: 00/06-20-075-13W6/2 | |
Location Alias: 00/06-20-75-13 W6M | |
Location Alias 2: 00/06-20-075-13 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 075 | |
Meridian: 6 | |
Range: 13 | |
Section: 20 | |
County/Municipality: Saddle Hills County | |
Well Name: ELKPOINT ET AL SINCLAIR 6-20-75-13 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0170615 | |
License Date: 1994-09-20 | |
License Status: Abandoned | |
Spud Date: 1994-09-22 | |
Final Drill Date: 1994-09-26 | |
Well Total Depth: 3065.00 m | |
Surface Hole Latitude: 55.509314 | |
Surface Hole Longitude: -119.980371 |
Date | Event |
---|---|
1994-09-20 | Obtained License |
1994-09-25 | Well Log Performed |
1994-09-26 | Finished Drilling |
1994-09-26 | Well Log Performed |
1994-09-28 | Perforation Treatment Performed - Jet Perforation |
1994-09-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-10-01 | Well Log Performed |
1994-10-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-10-02 | Plug Back Performed |
1994-10-03 | Perforation Treatment Performed - Jet Perforation |
1994-10-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-10-05 | Perforation Treatment Performed - Jet Perforation |
1994-10-05 | Plug Back Performed |
1994-10-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-10-08 | Rig Released |
1994-10-08 | Well Mode changed to Drilled and Cased |
1994-10-25 | Perforation Treatment Performed - Fractured |
2002-02-09 | Perforation Treatment Performed - Jet Perforation |
2002-02-10 | Perforation Treatment Performed - Cement Squeeze |
2004-05-05 | Well Log Performed |
2004-06-22 | Well Mode changed to Abandoned Zone |
2004-06-30 | Well Log Performed |
2004-07-02 | Perforation Treatment Performed - Cement Squeeze |
2004-07-02 | Plug Back Performed |
2004-09-28 | Perforation Treatment Performed - Jet Perforation |
2004-09-28 | Well Log Performed |
2004-09-29 | Well Log Performed |
2004-10-01 | Perforation Treatment Performed - Remedial Casing |
2005-03-21 | Well Log Performed |
2006-06-03 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2006-06-04 | Perforation Treatment Performed - Remedial Casing |
2006-06-04 | Well Log Performed |
2006-06-06 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2006-06-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-06-07 | Perforation Treatment Performed - Remedial Casing |
2007-05-31 | Well Log Performed |
2007-06-01 | Well Log Performed |
2007-08-01 | Perforation Treatment Performed - Jet Perforation |
2007-08-01 | Well Log Performed |
2007-08-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-08-02 | Perforation Treatment Performed - Remedial Casing |
2007-08-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-08-04 | Perforation Treatment Performed - Jet Perforation |
2007-08-04 | Perforation Treatment Performed - Remedial Casing |
2007-08-04 | Well Log Performed |
2007-09-17 | Perforation Treatment Performed - Jet Perforation |
2007-09-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-09-18 | Perforation Treatment Performed - Remedial Casing |
2007-10-31 | Well Abandoned |
2007-10-31 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-09-28 | Perforation | 2405.00 | 2407.00 | 13 |
2002-02-09 | Perforation | 1895.50 | 1896.40 | 36 |
2002-02-09 | Perforation | 1881.20 | 1882.10 | 36 |
2002-02-10 | Cement Squeeze | 1881.20 | 1896.40 | 0 |
2004-07-02 | Cement Squeeze | 2369.00 | 2376.00 | 0 |
2004-09-28 | Perforation | 2224.00 | 2224.50 | 20 |
2004-09-28 | Perforation | 2050.00 | 2050.50 | 20 |
2004-10-01 | Remedial Casing Cementing | 2224.00 | 2224.50 | 0 |
2004-10-01 | Remedial Casing Cementing | 2050.00 | 2050.50 | 0 |
2006-06-03 | Hydra Jet Perforation | 1714.00 | 1719.00 | 1 |
2006-06-04 | Remedial Casing Cementing | 1714.00 | 1719.00 | 0 |
1994-09-28 | Perforation | 2409.00 | 2417.00 | 13 |
2006-06-06 | Packing Device Capped w/Cement | 1696.00 | 1704.00 | 0 |
2006-06-06 | Hydra Jet Perforation | 1254.00 | 1257.00 | 1 |
2006-06-07 | Remedial Casing Cementing | 1254.00 | 1257.00 | 0 |
2007-08-01 | Perforation | 669.00 | 672.00 | 13 |
2007-08-02 | Remedial Casing Cementing | 669.00 | 672.00 | 0 |
2007-08-02 | Packing Device Capped w/Cement | 656.50 | 664.50 | 0 |
2007-08-04 | Perforation | 600.00 | 603.00 | 13 |
2007-08-04 | Remedial Casing Cementing | 600.00 | 603.00 | 0 |
2007-08-04 | Packing Device Capped w/Cement | 589.00 | 897.40 | 0 |
2007-09-17 | Perforation | 525.00 | 528.00 | 7 |
1994-09-29 | Acid Treatment | 2405.00 | 2417.00 | 0 |
2007-09-17 | Perforation | 524.00 | 527.00 | 13 |
2007-09-18 | Remedial Casing Cementing | 524.00 | 528.00 | 0 |
2007-09-18 | Packing Device Capped w/Cement | 505.60 | 517.60 | 0 |
1994-10-02 | Packing Device Capped w/Cement | 2398.50 | 2403.00 | 0 |
1994-10-03 | Perforation | 2386.00 | 2393.00 | 7 |
1994-10-05 | Packing Device Capped w/Cement | 2378.00 | 2383.00 | 0 |
1994-10-05 | Perforation | 2369.00 | 2376.00 | 13 |
1994-10-08 | Acid Treatment | 2369.00 | 2376.00 | 0 |
1994-10-25 | Fracture | 2369.00 | 2376.00 | 0 |
For data sources see[4]