If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0756112413020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.517306,"lon":-119.552924,"icon":""}]} |
Location: 02/13-24-075-11W6/0 | |
Location Alias: 02/13-24-75-11 W6M | |
Location Alias 2: 02/13-24-075-11 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 075 | |
Meridian: 6 | |
Range: 11 | |
Section: 24 | |
County/Municipality: Saddle Hills County | |
Well Name: AVN 102 HZ VALHALLA 13-24-75-11 | |
Operator Name: Advantage Oil & Gas Ltd. | |
License Number: 0491652 | |
License Date: 2018-10-29 | |
License Status: Amended | |
Spud Date: 2019-01-21 | |
Final Drill Date: 2019-01-27 | |
Well Total Depth: 3815.00 m | |
Surface Hole Latitude: 55.517306 | |
Surface Hole Longitude: -119.552924 |
Date | Event |
---|---|
2018-10-29 | Obtained License |
2019-01-22 | Surface Casing Operation Performed |
2019-01-23 | Direction Drilling Operation Performed - Deviate |
2019-01-26 | Direction Drilling Operation Performed - Horizontal |
2019-01-26 | Well Log Performed |
2019-01-27 | Finished Drilling |
2019-01-27 | Well Log Performed |
2019-01-27 | Well Mode changed to Drilled and Cased |
2019-01-28 | Production Casing Operation Performed |
2019-01-29 | Rig Released |
2019-06-23 | Perforation Treatment Performed - Open-Hole Completion |
2019-06-23 | Well Log Performed |
2019-07-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-07-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-07-24 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-01-21 | Horizon Drilling Inc. | 30 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-01-23 | 580.10 | Deviate (5 - 79 degrees) |
2019-01-26 | 2399.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-06-23 | Open Hole/Barefoot Completion | 3799.00 | 3815.00 | 0 |
2019-07-23 | Multi-Stage Fracture | 3397.50 | 3397.60 | 0 |
2019-07-23 | Multi-Stage Fracture | 3355.10 | 3355.20 | 0 |
2019-07-23 | Multi-Stage Fracture | 3299.60 | 3299.70 | 0 |
2019-07-23 | Multi-Stage Fracture | 3258.50 | 3258.60 | 0 |
2019-07-23 | Multi-Stage Fracture | 3203.70 | 3203.80 | 0 |
2019-07-23 | Multi-Stage Fracture | 3160.70 | 3160.80 | 0 |
2019-07-23 | Multi-Stage Fracture | 3106.70 | 3106.80 | 0 |
2019-07-24 | Multi-Stage Fracture | 3065.90 | 3066.00 | 0 |
2019-07-24 | Multi-Stage Fracture | 3011.30 | 3011.40 | 0 |
2019-07-24 | Multi-Stage Fracture | 2968.40 | 2968.50 | 0 |
2019-07-22 | Multi-Stage Fracture | 3759.60 | 3759.70 | 0 |
2019-07-24 | Multi-Stage Fracture | 2912.90 | 2913.00 | 0 |
2019-07-24 | Multi-Stage Fracture | 2870.50 | 2870.60 | 0 |
2019-07-24 | Multi-Stage Fracture | 2814.80 | 2814.90 | 0 |
2019-07-24 | Multi-Stage Fracture | 2772.50 | 2772.60 | 0 |
2019-07-24 | Multi-Stage Fracture | 2716.50 | 2716.60 | 0 |
2019-07-24 | Multi-Stage Fracture | 2675.50 | 2675.60 | 0 |
2019-07-24 | Multi-Stage Fracture | 2620.80 | 2620.90 | 0 |
2019-07-24 | Multi-Stage Fracture | 2578.00 | 2578.10 | 0 |
2019-07-24 | Multi-Stage Fracture | 2524.90 | 2525.00 | 0 |
2019-07-24 | Multi-Stage Fracture | 2482.80 | 2482.90 | 0 |
2019-07-22 | Multi-Stage Fracture | 3716.20 | 3716.30 | 0 |
2019-07-23 | Multi-Stage Fracture | 3673.50 | 3673.60 | 0 |
2019-07-23 | Multi-Stage Fracture | 3630.20 | 3630.30 | 0 |
2019-07-23 | Multi-Stage Fracture | 3590.20 | 3590.30 | 0 |
2019-07-23 | Multi-Stage Fracture | 3549.90 | 3550.00 | 0 |
2019-07-23 | Multi-Stage Fracture | 3495.20 | 3495.30 | 0 |
2019-07-23 | Multi-Stage Fracture | 3453.00 | 3453.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-07-22 | 2019-07-24 | 2,290 | 6,477 | N/A |
2 | 2019-07-24 | 2019-07-24 | 2,290 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 1.286 | N/A | |||
water | Not Available | 100 | 78.5588 | N/A | ||||
Sand 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 12.096 | N/A | ||
Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 8.64 | N/A | ||
AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.01 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.01 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.01 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.01 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.01 | N/A | ||||
CC-10 | Trican | Clay Control | non-hazardous ingredients | Not Available | 100 | 0.0879 | N/A | |
FR-24 | Trican | Friction Reducer | distillates (petroleum). hydrotreated light naphthenic | 64742-53-6 | 100 | 0.037 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.037 | N/A | ||||
NMR-1N | Trican | Surfactant | methanol | 67-56-1 | 100 | 0.0385 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.0385 | N/A | ||||
2 | Breaker HT | Trican | Breaker | ammonium persulfate | 7727-54-0 | 100 | 0.0032 | N/A |
non-hazardous ingredients | Not Available | 100 | 0.0032 | N/A | ||||
pH-13W | Trican | Buffer | methanol | 67-56-1 | 100 | 0.023 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.023 | N/A | ||||
sodium hydroxide | 1310-73-2 | 100 | 0.023 | N/A | ||||
WXB-17 | Trican | Crosslinker | monoethanolamine | 141-43-5 | 100 | 0.0592 | N/A | |
monoethanolamine borate | 26038-87-9 | 100 | 0.0592 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0592 | N/A | ||||
DF-2W | Trican | Defoamer | non-hazardous ingredients | Not Available | 100 | 0.0011 | N/A | |
propylene glycol | 57-55-6 | 100 | 0.0011 | N/A | ||||
WG-111DA | Trican | Gelling Agent | fumaric acid | 110-17-8 | 100 | 0.0524 | N/A | |
guar gum | 9000-30-0 | 100 | 0.0523 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-06-29 | 2019-06-29 | Central Water Distribution Facility | 28 |
2019-06-29 | 2019-06-29 | Central Water Distribution Facility | 73 |
2019-07-21 | 2019-07-24 | Surface Water - Lake | 5685 |
2019-07-21 | 2019-07-22 | Surface Water - Runoff | 1857 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-01-29 | No Incident Encountered | 0.00 | 0.00 |
2019-07-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]