If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0756103001000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.527928,"lon":-119.552776,"icon":""}]} |
Location: 00/01-30-075-10W6/0 | |
Location Alias: 00/01-30-75-10 W6M | |
Location Alias 2: 00/01-30-075-10 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 075 | |
Meridian: 6 | |
Range: 10 | |
Section: 30 | |
County/Municipality: Saddle Hills County | |
Well Name: INSIGNIAENERGY VALHALLA 1-30-75-10 | |
Operator Name: Insignia Energy Ltd. | |
License Number: 0441594 | |
License Date: 2011-12-19 | |
License Status: Issued | |
Spud Date: 2012-01-23 | |
Final Drill Date: 2012-02-19 | |
Well Total Depth: 4222.00 m | |
Surface Hole Latitude: 55.527928 | |
Surface Hole Longitude: -119.552776 |
Date | Event |
---|---|
2011-12-19 | Obtained License |
2012-01-25 | Surface Casing Operation Performed |
2012-01-31 | Well Log Performed |
2012-02-01 | Direction Drilling Operation Performed - Horizontal |
2012-02-06 | Well Log Performed |
2012-02-07 | Intermediate Casing Operation Performed |
2012-02-19 | Finished Drilling |
2012-02-19 | Well Log Performed |
2012-02-19 | Well Mode changed to Drilled and Cased |
2012-02-21 | Well Log Performed |
2012-02-23 | Liner Casing Operation Performed |
2012-02-23 | Perforation Treatment Performed - Open-Hole Completion |
2012-02-24 | Rig Released |
2012-03-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-08-02 | Well Began Production |
2012-08-02 | Well Fluid changed to Gas |
2012-08-02 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-23 | Precision Drilling Corporation | 622 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-01 | 2056.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-23 | Open Hole/Barefoot Completion | 4218.00 | 4222.00 | 0 |
2012-03-08 | Multi-Stage Fracture | 3360.40 | 3361.20 | 0 |
2012-03-08 | Multi-Stage Fracture | 3262.70 | 3263.50 | 0 |
2012-03-08 | Multi-Stage Fracture | 3164.20 | 3165.00 | 0 |
2012-03-08 | Multi-Stage Fracture | 3065.80 | 3066.60 | 0 |
2012-03-08 | Multi-Stage Fracture | 2967.70 | 2968.50 | 0 |
2012-03-08 | Multi-Stage Fracture | 2869.50 | 2870.30 | 0 |
2012-03-08 | Multi-Stage Fracture | 2771.50 | 2772.30 | 0 |
2012-03-08 | Multi-Stage Fracture | 2673.50 | 2674.30 | 0 |
2012-03-09 | Multi-Stage Fracture | 2576.40 | 2577.20 | 0 |
2012-03-09 | Multi-Stage Fracture | 2478.30 | 2479.10 | 0 |
2012-03-07 | Multi-Stage Fracture | 4173.80 | 4175.10 | 0 |
2012-03-07 | Multi-Stage Fracture | 4058.10 | 4058.90 | 0 |
2012-03-07 | Multi-Stage Fracture | 3959.80 | 3960.60 | 0 |
2012-03-07 | Multi-Stage Fracture | 3862.10 | 3862.90 | 0 |
2012-03-07 | Multi-Stage Fracture | 3764.50 | 3765.30 | 0 |
2012-03-07 | Multi-Stage Fracture | 3666.20 | 3667.00 | 0 |
2012-03-07 | Multi-Stage Fracture | 3557.10 | 3557.90 | 0 |
2012-03-07 | Multi-Stage Fracture | 3458.70 | 3459.50 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1392 | 0.0 | 0.0 | 0.0 |
2013 | 4632 | 0.0 | 0.0 | 0.0 |
2014 | 6354 | 0.0 | 0.0 | 0.0 |
2015 | 7463 | 0.0 | 0.0 | 0.0 |
2016 | 6554 | 0.0 | 0.0 | 0.0 |
2017 | 8712 | 0.0 | 0.0 | 0.0 |
2018 | 7295 | 0.0 | 0.0 | 0.0 |
2019 | 4649 | 0.0 | 0.0 | 0.0 |
2020 | 1640 | 0.0 | 0.0 | 0.0 |
For data sources see[7]