X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0756103001000

Well Details

Well ID: 0756103001000
Loading map...
Location: 00/01-30-075-10W6/0
Location Alias: 00/01-30-75-10 W6M
Location Alias 2: 00/01-30-075-10 W6/00
Country: Canada
Province: Alberta
Township: 075
Meridian: 6
Range: 10
Section: 30
County/Municipality: Saddle Hills County
Well Name: INSIGNIAENERGY VALHALLA 1-30-75-10
Operator Name: Insignia Energy Ltd.
License Number: 0441594
License Date: 2011-12-19
License Status: Issued
Spud Date: 2012-01-23
Final Drill Date: 2012-02-19
Well Total Depth: 4222.00 m
Surface Hole Latitude: 55.527928
Surface Hole Longitude: -119.552776

For data sources see[1][2]

Well History

Date Event
2011-12-19 Obtained License
2012-01-25 Surface Casing Operation Performed
2012-01-31 Well Log Performed
2012-02-01 Direction Drilling Operation Performed - Horizontal
2012-02-06 Well Log Performed
2012-02-07 Intermediate Casing Operation Performed
2012-02-19 Finished Drilling
2012-02-19 Well Log Performed
2012-02-19 Well Mode changed to Drilled and Cased
2012-02-21 Well Log Performed
2012-02-23 Liner Casing Operation Performed
2012-02-23 Perforation Treatment Performed - Open-Hole Completion
2012-02-24 Rig Released
2012-03-07 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-08 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-02 Well Began Production
2012-08-02 Well Fluid changed to Gas
2012-08-02 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-23 Precision Drilling Corporation 622 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-01 2056.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-23 Open Hole/Barefoot Completion 4218.00 4222.00 0
2012-03-08 Multi-Stage Fracture 3360.40 3361.20 0
2012-03-08 Multi-Stage Fracture 3262.70 3263.50 0
2012-03-08 Multi-Stage Fracture 3164.20 3165.00 0
2012-03-08 Multi-Stage Fracture 3065.80 3066.60 0
2012-03-08 Multi-Stage Fracture 2967.70 2968.50 0
2012-03-08 Multi-Stage Fracture 2869.50 2870.30 0
2012-03-08 Multi-Stage Fracture 2771.50 2772.30 0
2012-03-08 Multi-Stage Fracture 2673.50 2674.30 0
2012-03-09 Multi-Stage Fracture 2576.40 2577.20 0
2012-03-09 Multi-Stage Fracture 2478.30 2479.10 0
2012-03-07 Multi-Stage Fracture 4173.80 4175.10 0
2012-03-07 Multi-Stage Fracture 4058.10 4058.90 0
2012-03-07 Multi-Stage Fracture 3959.80 3960.60 0
2012-03-07 Multi-Stage Fracture 3862.10 3862.90 0
2012-03-07 Multi-Stage Fracture 3764.50 3765.30 0
2012-03-07 Multi-Stage Fracture 3666.20 3667.00 0
2012-03-07 Multi-Stage Fracture 3557.10 3557.90 0
2012-03-07 Multi-Stage Fracture 3458.70 3459.50 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1392 0.0 0.0 0.0
2013 4632 0.0 0.0 0.0
2014 6354 0.0 0.0 0.0
2015 7463 0.0 0.0 0.0
2016 6554 0.0 0.0 0.0
2017 8712 0.0 0.0 0.0
2018 7295 0.0 0.0 0.0
2019 4649 0.0 0.0 0.0
2020 1640 0.0 0.0 0.0

For data sources see[7]

References