If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0756081603020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.503925,"lon":-119.178423,"icon":""}]} |
Location: 02/03-16-075-08W6/0 | |
Location Alias: 02/03-16-75-08 W6M | |
Location Alias 2: 02/03-16-075-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 075 | |
Meridian: 6 | |
Range: 08 | |
Section: 16 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: TIDEWATER VALHALLA 3-16-75-8 | |
Operator Name: Tidewater Midstream and Infrastructure Ltd. | |
License Number: 0375675 | |
License Date: 2007-03-08 | |
License Status: Issued | |
Spud Date: 2007-06-01 | |
Final Drill Date: 2007-06-09 | |
Well Total Depth: 1821.00 m | |
Surface Hole Latitude: 55.503925 | |
Surface Hole Longitude: -119.178423 |
Date | Event |
---|---|
2007-03-08 | Obtained License |
2007-06-02 | Surface Casing Operation Performed |
2007-06-04 | Direction Drilling Operation Performed - Horizontal |
2007-06-06 | Intermediate Casing Operation Performed |
2007-06-09 | Finished Drilling |
2007-06-09 | Well Mode changed to Drilled and Cased |
2007-06-10 | Well Log Performed |
2007-06-11 | Liner Casing Operation Performed |
2007-06-11 | Perforation Treatment Performed - Slotted Liner or Casing |
2007-06-12 | Rig Released |
2007-09-24 | Well Log Performed |
2007-12-08 | Well Began Injection |
2007-12-08 | Well Fluid changed to Water |
2007-12-08 | Well Type changed to Injection |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2007-06-04 | 490.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-06-11 | Slotted Liner | 768.70 | 1821.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 0 | 0.0 | 0.0 | 0.0 |
2008 | 0 | 0.0 | 0.0 | 0.0 |
2009 | 0 | 0.0 | 0.0 | 0.0 |
2010 | 0 | 0.0 | 0.0 | 0.0 |
2011 | 0 | 0.0 | 0.0 | 0.0 |
2012 | 0 | 0.0 | 0.0 | 0.0 |
2013 | 0 | 0.0 | 0.0 | 0.0 |
2014 | 0 | 0.0 | 0.0 | 0.0 |
2015 | 0 | 0.0 | 0.0 | 0.0 |
2016 | 0 | 0.0 | 0.0 | 0.0 |
2017 | 0 | 0.0 | 0.0 | 0.0 |
2018 | 0 | 0.0 | 0.0 | 0.0 |
2019 | 0 | 0.0 | 0.0 | 0.0 |
2020 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]