X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0756063609000

Well Details

Well ID: 0756063609000
Loading map...
Location: 00/09-36-075-06W6/0
Location Alias: 00/09-36-75-06 W6M
Location Alias 2: 00/09-36-075-06 W6/00
Country: Canada
Province: Alberta
Township: 075
Meridian: 6
Range: 06
Section: 36
County/Municipality: Saddle Hills County
Well Name: CNRL HZ RYCROFT 9-36-75-6
Operator Name: Canadian Natural Resources Limited
License Number: 0442744
License Date: 2012-01-12
License Status: Issued
Spud Date: 2012-02-22
Final Drill Date: 2012-03-01
Well Total Depth: 3005.00 m
Surface Hole Latitude: 55.542515
Surface Hole Longitude: -118.800719

For data sources see[1][2]

Well History

Date Event
2012-01-12 Obtained License
2012-02-23 Surface Casing Operation Performed
2012-02-25 Direction Drilling Operation Performed - Horizontal
2012-02-25 Well Log Performed
2012-03-01 Finished Drilling
2012-03-01 Well Log Performed
2012-03-01 Well Mode changed to Drilled and Cased
2012-03-02 Well Log Performed
2012-03-03 Production Casing Operation Performed
2012-03-04 Rig Released
2012-03-07 Well Log Performed
2012-03-14 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-16 Perforation Treatment Performed - Abrasa-Jet Perforation
2012-03-16 Perforation Treatment Performed - Fractured
2012-03-17 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-19 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-20 Perforation Treatment Performed - Multi-Stage Fracture
2012-04-01 Well Began Production
2012-04-01 Well Fluid changed to Crude Oil
2012-04-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-22 Ensign Drilling Inc. 127 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-25 1415.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-14 Multi-Stage Fracture 2969.90 2970.00 0
2012-03-17 Multi-Stage Fracture 2393.20 2393.30 0
2012-03-19 Multi-Stage Fracture 2311.20 2311.30 0
2012-03-19 Multi-Stage Fracture 2226.30 2226.40 0
2012-03-19 Multi-Stage Fracture 2146.60 2146.70 0
2012-03-19 Multi-Stage Fracture 2061.40 2061.50 0
2012-03-20 Multi-Stage Fracture 1976.60 1976.70 0
2012-03-20 Multi-Stage Fracture 1905.00 1905.10 0
2012-03-14 Multi-Stage Fracture 2884.80 2884.90 0
2012-03-16 Hydra Jet Perforation 2784.00 2784.20 0
2012-03-16 Fracture 2784.00 2784.20 0
2012-03-16 Hydra Jet Perforation 2702.00 2702.20 0
2012-03-16 Fracture 2702.00 2702.20 0
2012-03-17 Multi-Stage Fracture 2637.50 2637.60 0
2012-03-17 Multi-Stage Fracture 2558.20 2558.30 0
2012-03-17 Multi-Stage Fracture 2473.30 2473.40 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6275 0.0 0.0 0.0
2013 8149 0.0 0.0 0.0
2014 7360 0.0 0.0 0.0
2015 8377 0.0 0.0 0.0
2016 8370 0.0 0.0 0.0
2017 8656 0.0 0.0 0.0
2018 8619 0.0 0.0 0.0
2019 8486 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-23 No Incident Encountered 0.00 0.00

For data sources see[8]

References