X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0756062602020

Well Details

Well ID: 0756062602020
Loading map...
Location: 02/02-26-075-06W6/0
Location Alias: 02/02-26-75-06 W6M
Location Alias 2: 02/02-26-075-06 W6/00
Country: Canada
Province: Alberta
Township: 075
Meridian: 6
Range: 06
Section: 26
County/Municipality: Saddle Hills County
Well Name: COP 102 HZ RYCROFT 2-26-75-6
Operator Name: Canadian Natural Resources Limited
License Number: 0413138
License Date: 2009-10-15
License Status: Issued
Spud Date: 2009-11-22
Final Drill Date: 2009-12-09
Well Total Depth: 3063.00 m
Surface Hole Latitude: 55.522103
Surface Hole Longitude: -118.788539

For data sources see[1][2]

Well History

Date Event
2009-10-15 Obtained License
2009-11-24 Surface Casing Operation Performed
2009-11-29 Direction Drilling Operation Performed - Horizontal
2009-12-02 Well Log Performed
2009-12-03 Intermediate Casing Operation Performed
2009-12-09 Finished Drilling
2009-12-09 Well Log Performed
2009-12-09 Well Mode changed to Drilled and Cased
2009-12-10 Well Log Performed
2009-12-11 Liner Casing Operation Performed
2009-12-12 Rig Released
2009-12-23 Well Log Performed
2009-12-29 Perforation Treatment Performed - Multi-Stage Fracture
2009-12-29 Perforation Treatment Performed - Open-Hole Completion
2010-01-01 Well Began Production
2010-01-01 Well Fluid changed to Crude Oil
2010-01-01 Well Mode changed to Flowing
2010-02-06 Well Fluid changed to Crude Oil
2010-02-06 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-11-29 1533.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-12-29 Open Hole/Barefoot Completion 3011.00 3063.00 0
2009-12-29 Multi-Stage Fracture 2858.00 2858.10 0
2009-12-29 Multi-Stage Fracture 2736.80 2736.90 0
2009-12-29 Multi-Stage Fracture 2637.80 2637.90 0
2009-12-29 Multi-Stage Fracture 2561.80 2561.90 0
2009-12-29 Multi-Stage Fracture 2398.00 2398.10 0
2009-12-29 Multi-Stage Fracture 2225.80 2225.90 0
2009-12-29 Multi-Stage Fracture 2058.20 2058.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 7694 0.0 0.0 0.0
2011 7960 0.0 0.0 0.0
2012 7360 0.0 0.0 0.0
2013 7783 0.0 0.0 0.0
2014 7669 0.0 0.0 0.0
2015 8462 0.0 0.0 0.0
2016 8177 0.0 0.0 0.0
2017 8719 0.0 0.0 0.0
2018 8144 0.0 0.0 0.0
2019 8643 0.0 0.0 0.0
2020 2150 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-12-29 No Incident Encountered 0.00 0.00
2016-01-26 No Incident Encountered 0.00 0.00

For data sources see[7]

References